Huazhuang station
Appearance
General information | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Huazhuang Village, Liyuan Town, Tongzhou District, Beijing[1] China | ||||||||||||||
Coordinates | 39°51′19″N 116°41′21″E / 39.8553663°N 116.6891062°E | ||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||||||
Line(s) | Line 7 Batong line (through operation to Line 1) | ||||||||||||||
Platforms | 4 (2 island platforms) | ||||||||||||||
Tracks | 4 | ||||||||||||||
Construction | |||||||||||||||
Structure type | Underground | ||||||||||||||
Accessible | Yes | ||||||||||||||
History | |||||||||||||||
Opened | December 28, 2019 | ||||||||||||||
Services | |||||||||||||||
| |||||||||||||||
|
Huazhuang station[2] (Chinese: 花庄站; pinyin: Huāzhuāng zhàn) is a subway station on Line 7 and the Batong line (through operation to Line 1) of the Beijing Subway. It is located in Huazhuang Village in Liyuan Town in Tongzhou District.[1] It has a double-island platform. It is operated by Beijing Mass Transit Railway Operation Corporation Limited. The station was the eastern terminus for both lines until Universal Resort station opened on August 26, 2021.
Station Layout
Both the line 7 and Batong line stations have underground island platforms.
Exits
There are 4 exits, lettered A, B, C, and D. Exits A and C are accessible.
Gallery
-
Ba Tong Line Platform before through service
-
Concourse
References
- ^ a b "北京地铁7号线东延沿线9座车站发布命名预案,公众有意见尽管提" (in Chinese). 2019-05-15.
花庄站。位于通州区梨园镇花庄村
- ^ "JPG格式线路图下载". www.bjsubway.com. Retrieved 2020-02-11.
External links
- Media related to Hua Zhuang Station at Wikimedia Commons