Jump to content

Jacinto-class patrol vessel

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by AnomieBOT (talk | contribs) at 16:35, 15 October 2023 (Dating maintenance tags: {{Dead link}}). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

BRP Artemio Ricarte, a Jacinto-class patrol vessel
Class overview
NameJacinto class
BuildersHall, Russell & Company
Operators Philippine Navy
Built1982
In commission1997 – present
Active3
General characteristics
TypeOffshore Patrol Vessel
Displacement712 tons full load
Length205.4 ft (62.6 m)
Beam32.8 ft (10.0 m)
Draft8.9 ft (2.7 m)
Installed power3 × CAT 3406C diesel generators each producing 465 bhp (347 kW)[1]
Propulsion
  • 2 × APE-Crossley SEMT-Pielstick 18 PA6 V 280 Diesel engines[2]
  • 2 × shafts
  • 1 × Schottel S103 LSVEST drop-down, shrouded loiter retractable propeller, 181 shp (135 kW)
Speed25 knots (46 km/h) (sustained)
Range2,500 nmi (4,600 km) at 17 knots (31 km/h)
Boats & landing
craft carried
2 × Avon Searaider 5.4m 30 knots (56 km/h) 10-man Semi-rigid boat aft[3]
Complement31
Sensors and
processing systems
  • Hull 35:
  • 9LV Mk4 Compact Combat Management System by Saab
  • Sea Eagle X & S bands Surface Search & Navigation Radars by GEM Elettronica
  • EOS-500 Electro-Optical Tracking/Fire Control System by Saab
  • Hull 36 & 37:
  • Ultra Electronics Fire Control System
  • Sharpeye™ X & S-band Surface Search & Navigation Radars by Kelvin Hughes
  • Series-1700 Electro-Optical Tracking System by Ultra Electronics
Armament
ArmorBelted steel

The Jacinto-class patrol vessels currently in service with the Philippine Navy are three ships formerly belonging to the Royal Navy's Hong Kong Squadron as Peacock-class corvettes until 1997. The ships have undergone combat, electronics, weapon, propulsion and hull upgrades, with the most recent upgrade completed in August 2019.[4] These increased their capabilities compared to the original Peacock-class vessels.

History

Launched as a series of five patrol vessels, the Peacock class were originally part of the Hong Kong Squadron of the Royal Navy. The ships were built by Hall Russell in the United Kingdom and were commissioned into Royal Navy service from 1983 to 1984. The class was designed specifically for patrol duties in Hong Kong waters. As well as "flying the flag" and providing a constant British naval presence in the region, they could also undertake a number of different roles including seamanship, navigation and gunnery training. In addition, they performed search-and-rescue duties for which they had facilities to carry divers (including a decompression chamber) and equipment to recover vessels and aircraft. They also worked with the Marine Department of the Hong Kong Police and with Customs & Excise in order to prevent the constant flow of illegal immigrants, narcotics and electronic equipment into the Colony.[5]

Three of these ships – HMS Peacock (P239), HMS Plover (P240), and HMS Starling (P241) – were sold to the Philippines as a sign of goodwill, and were officially turned over to the Philippine Navy on 1 August 1997 when sovereignty over Hong Kong was transferred from the United Kingdom to the People's Republic of China.[3]

Technical details

The ships under this class are characterized by a low freeboard, an Oto Melara 76 mm gun turret located forward, a large single funnel stack amidships, and a crane and two rigid-hulled inflatable boats (RHIB) aft.

For the BRP Emilio Jacinto (PS-35), the ship has the Saab 9LV Mk4 Compact Combat Management System (CMS), which allows the integration of the ship's navigation, surveillance and combat systems.[6] Meanwhile the BRP Apolinario Mabini (PS-36) and BRP Artemio Ricarte (PS-37) do not have a CMS although both ships use a Fire Control System from Ultra Electronics.

The Oto Melara 76 mm Compact DP (Dual Purpose) gun is the primary weapon and is mounted in a turret forward of the bridge. It has a range of up to 10 nautical miles (20 km) and can be used against ships, aircraft or ground targets. It is remotely controlled from within the Combat Information Center by the gunnery officer and has no crew within the turret itself. The gun can fire 80 rounds in 60 seconds from its ready magazine, and the ships can carry a total of 450 rounds.

The secondary weapon (located at the stern) is a M242 Bushmaster 25 mm cannon in an MSI Defense System DS-25 Seahawk A1 mount.

Both guns are automated and are integrated with the Saab 9LV CMS and Saab EOS-500 Electro-optical tracking system (EOTS) on PS-35, or the Ultra Electronics C2 and FCS, and Series 1700 EOTS on PS-36 and PS-37.

The Saab EOS-500 and Ultra Electronics Series 1700 EOTS replaced the Radamec 1500 Series 2500 installed by the PN in 2005, which in turn replaced the older GSA7 Sea Archer Mk 1 electro-optical director with a GEC V3800 thermal imager added in 1987.[3][7]

In addition to the abovementioned guns, these ships also carry two 12.7 mm 50 caliber heavy machine guns at the bridgewings, two 20 mm Mark 16 guns on Mk.68 mounts at midships, and two 50 mm rocket flare projectors.[3]

The ships are powered by two APE-Crossley SEMT-Pielstick diesels (14,188 bhp combined) driving two three-bladed propellers. It has a drop down loiter engine with a shrouded prop of 181 bhp (135 kW) used to keep station and save fuel. The main engines can propel the 664 ton (712 tons full load) ship at over 28 knots (52 km/h), with a sustained speed of 25 knots (46 km/h). Its range is 2,500 nautical miles (4,630 km) at 17 knots (31 km/h).[2]

These patrol vessels were specifically designed for Asian service, having air-conditioned crew spaces and have been designed to stay at sea during typhoons and other strong weather anomalies common to Asian seas. The ships were modified soon after entering the Royal Navy service with deeper bilge keels to alleviate a propensity to roll during moderate and heavy seas.[8]

Each ship carries two Avon Searaider 5.4-metre (18 ft), 30-knot (56 km/h; 35 mph), 10-man RHIB.[3]

Upgrades

Upon entry with the Philippine Navy, additional refits were made to replace the four (4) 7.62mm machine guns with two (2) .50 caliber heavy machine guns and two 20 mm Mk.16 cannons.[9] There are plans to add anti-ship missiles to the ships, but due to top-weight problems, it would have to be a lightweight system such as Sea Skua, although no missiles have been ordered to date.[3]

Phase 1 involves the upgrade of the ship's command & control, surveillance, and fire control systems, and was awarded to British defense contractor QinetiQ. It involved the installation of a new MSI Defence DS-25 Seahawk A1 AUTSIG mount with M242 Bushmaster 25mm naval gun, a new Fire Control System and Radamec's 1500 Series electro-optical tracking system (EOTS), Raytheon gyro compass, Sperry Marine Naval BridgeMaster E Series Surface Search Radar, GPS, anemometer, and EM logs. All these were integrated with the ship's existing systems. The Phase 1 upgrade was completed in 2005.[10][11]

Phase 2 is the Marine Engineering Upgrade Program, which includes the repair and remediation of the hull, overhaul and improvement of the main propulsion including control and monitoring systems, electrical plant, auxiliary systems, outfitting and hull furnishings and training the crew in the operation and maintenance of the new plant.[8]

Phase 3 was originally a Service Life Extension Program (SLEP).[10] But this was later changed to Combat System Alignment project to improve the combat capability of the patrol vessels.[12] It involves replacing the existing EO/IR and fire control system with a newer system and a Command and Control (C2) module, repairing the 76mm Oto Melara Compact and 25mm Bushmaster gun on MSI Defence Seahawk mount, and other relevant upgrades.[13][14]

The project was divided to Phase 3A involving 2 ships (PS-35 and PS-36, later changed to PS-36 and PS-37) and the refurbishment of 3 MSI Seahawk gun mounts, while Phase 3B involves 1 ship (PS-37, later change to PS-35).[15][16][14]

The Phase 3A Combat Systems Alignment project was awarded to Ultra Electronics,[6] which installed the Ultra Electronics Fire Control System and Series 1700 electro-optical targeting system, and the Kelvin Hughes Sharpeye X-band surface search surveillance radar.[17]</ref>[14][18]

The Phase 3B Combat Systems Alignment Project was awarded to Propmech Corporation-Saab AB Joint Venture,[19] which installed the Saab 9LV Mk.4 Compact Combat Management System (CMS),[6] Saab EOS-500 electro-optical targeting system and the GEM Elettronica Sea Eagle X-band surface search surveillance radar.[20]</ref>[14][21][17]

Ships in class

Hull number Ship name Launched Commissioned Service Status
PS-35 BRP Emilio Jacinto 1 December 1982 4 August 1997 Offshore Combat Force Active
PS-36 BRP Apolinario Mabini 12 April 1983 4 August 1997 Offshore Combat Force Active
PS-37 BRP Artemio Ricarte 7 September 1983 4 August 1997 Offshore Combat Force Active

References

  1. ^ Department of National Defense - Bids and Awards Committee JCPV Phase 2 Marine Engineering Upgrade (PS-37) Project.
  2. ^ a b Saunders, Stephen (2004). Jane's Fighting Ships 2004–2005 (107th ed.). Jane's Information Group Ltd.
  3. ^ a b c d e f Wertheim, Eric: The Naval Institute Guide to Combat Fleets of the World 15th Edition, page 552. Naval Institute Press, 2007.[1] Archived 2018-04-21 at the Wayback Machine
  4. ^ "Jacinto-class Patrol Vessel Combat Systems Alignment Phases 3A and 3B Acquisition Project of the Philippine Navy". PH Defense Resource. 5 July 2019.
  5. ^ Royal Navy Postwar. Peacock Class Offshore Patrol Vessels.
  6. ^ a b c "Knowing the Philippine Navy's Jacinto-class Offshore Patrol Vessels". Pitz Defense Analysis. 4 April 2021. Retrieved 31 May 2023.
  7. ^ Friedman, Norman (2006). The Naval Institute Guide to World Naval Weapons System (5th ed.). Naval Institute Press. p. 307. ISBN 9781557502629. Archived from the original on 24 April 2018. Retrieved 31 October 2017.
  8. ^ a b Manokski's ORBAT @ Hueybravo. Jacinto class corvettes page Archived 2008-04-10 at the Wayback Machine.
  9. ^ GlobalSecurity.org PS Emilio Jacinto class Archived 2012-11-04 at the Wayback Machine.
  10. ^ a b AFP Materiel Technical Specification Archives Ships[permanent dead link].
  11. ^ "Upgraded Jacinto-class patrol vessels PS-35 and PS-36 to re-enter Philippine Navy service soon". Defense Aerospace. 14 June 2006. Archived from the original on 22 June 2019. Retrieved 23 June 2019.
  12. ^ Nepomuceno, Priam (13 November 2019). "Navy upgrades BRP Emilio Jacinto". Philippine News Agency. Retrieved 31 May 2023.
  13. ^ "Updates on the Sensors, Fire Control System, and Weapons Systems Upgrade of the Philippine Navy's Jacinto-class vessel". MaxDefense Philippines. 21 October 2015. Archived from the original on 22 June 2019. Retrieved 23 June 2019.
  14. ^ a b c d "Jacinto-class Patrol Vessel Combat Systems Alignment Phases 3A and 3B Acquisition Project of the Philippine Navy". Philippine Defense Resource. 5 July 2019. Retrieved 23 August 2023.
  15. ^ Department of National Defense Bids & Awards Committee – Invitation to Bid for JCPV Phase 3A Acquisition Project of the Philippine Navy [2] Archived 2015-01-15 at the Wayback Machine
  16. ^ Department of National Defense Bids & Awards Committee – Invitation to Bid for JCPV Phase 3B Acquisition Project of the Philippine Navy [3] Archived 2015-01-15 at the Wayback Machine
  17. ^ a b "Upgraded Jacinto-class patrol vessels PS-35 and PS-36 to re-enter Philippine Navy service soon". MaxDefense Philippines. 19 May 2019. Archived from the original on 22 June 2019. Retrieved 23 June 2019.
  18. ^ "Upgraded Jacinto-class patrol vessels PS-35 and PS-36 to re-enter Philippine Navy service soon". Defense Aerospace. 14 June 2006. Archived from the original on 22 June 2019. Retrieved 23 June 2019.
  19. ^ Navy Document [dead link]
  20. ^ "Propmech and SAAB wins Philippine Navy's Jacinto-class Patrol Vessel Upgrade Phase 3B Project". MaxDefense Philippines. 14 March 2016. Archived from the original on 24 April 2018. Retrieved 23 June 2019.
  21. ^ "Saab Naval Capabilities - IMDEX ASIA 2017" (PDF). Archived (PDF) from the original on 14 June 2017. Retrieved 22 June 2019.