Luogang station
Appearance
Chinese name | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 萝岗站 | |||||||||||||||
Traditional Chinese | 蘿崗站 | |||||||||||||||
| ||||||||||||||||
General information | ||||||||||||||||
Location | Kaichuang Avenue (开创大道) and Xiangxue No. 3 Road (香雪三路) / Kaida Road (开达路) Huangpu District, Guangzhou, Guangdong China | |||||||||||||||
Coordinates | 23°10′42″N 113°28′32″E / 23.178356°N 113.475572°E | |||||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | |||||||||||||||
Line(s) | Line 6 Line 7 | |||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Connections | THP1 (Civic Square) | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Station code | 6 31 (Line 6) 7 18 (Line 7) | |||||||||||||||
History | ||||||||||||||||
Opened | 28 December 2016 28 December 2023 (Line 7) | (Line 6)|||||||||||||||
Services | ||||||||||||||||
|
Luogang station (Chinese: 萝岗站), is an interchange station between Line 6 and Line 7 of the Guangzhou Metro. Line 6 opened on 28 December 2016,[1] whilst Line 7 opened on 28 December 2023.[2]
Station layout
Line 6
G | - | Exits A, C, D |
L1 Concourse |
Lobby | Customer Service, Shops, Vending machines, ATMs Transfer passageway to Line 7 |
L2 Platforms |
Platform 2 | 6 towards Xunfenggang (Suyuan) |
Island platform, doors will open on the left | ||
Platform 1 | 6 towards Xiangxue (terminus) |
Line 7
G | - | Exits B, E, F |
L1 Concourse |
Lobby | Customer Service, Shops, Vending machines, ATMs |
Transfer Node | Transfer passageway to Line 6 | |
L2 Equipment Area |
- | Station equipment |
L3 Platforms |
Platform 4 | 7 towards Meidi Dadao (Kefeng Lu) |
Island platform, doors will open on the left | ||
Platform 3 | 7 towards Yanshan (Shuixi) |
Exits
Exit number | Exit location | |
---|---|---|
Exit A | Kaichuang Dadao | |
Exit C | Xiangxue Sanlu | |
Exit D | Huixing Lu | |
Exit E | Xiangxue Sanlu | |
Exit F | Xiangxue Sanlu | |
Exit G | Xiangxue Sanlu |
Gallery
-
Line 6 platform
-
Line 6 concourse
-
Transfer passageway
-
Line 7 concourse
References
- ^ "Line 6 Service Time". Guangzhou Metro. Guangzhou Metro. Retrieved 31 December 2017.
- ^ "广州地铁七号线二期和五号线东延段开通运营,长洲岛派出舞狮喜迎开通". 新快报 (in Simplified Chinese). 2023-12-28. Archived from the original on 2023-12-28. Retrieved 2024-01-05.