Jump to content

Luogang station

Coordinates: 23°10′42″N 113°28′32″E / 23.178356°N 113.475572°E / 23.178356; 113.475572
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by GMB205 (talk | contribs) at 16:00, 12 January 2024. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Luogang

萝岗
Guangzhou Metro
Line 7 platform
Chinese name
Simplified Chinese萝岗站
Traditional Chinese蘿崗站
Transcriptions
Standard Mandarin
Hanyu PinyinLuógǎng Zhàn
Yue: Cantonese
Jyutpinglo4gong1 zaam6
General information
LocationKaichuang Avenue (开创大道) and Xiangxue No. 3 Road (香雪三路) / Kaida Road (开达路)
Huangpu District, Guangzhou, Guangdong
China
Coordinates23°10′42″N 113°28′32″E / 23.178356°N 113.475572°E / 23.178356; 113.475572
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 6
     Line 7
Platforms4 (2 island platforms)
Tracks4
ConnectionsTrams in China THP1  (Civic Square)
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code6 31 (Line 6)
7 18 (Line 7)
History
Opened28 December 2016; 7 years ago (2016-12-28) (Line 6)
28 December 2023; 10 months ago (2023-12-28) (Line 7)
Services
Preceding station Guangzhou Metro Following station
Suyuan
towards Xunfenggang
Line 6 Xiangxue
Terminus
Kefeng Lu
towards Meidi Dadao
Line 7 Shuixi
towards Yanshan

Luogang station (Chinese: 萝岗站), is an interchange station between Line 6 and Line 7 of the Guangzhou Metro. Line 6 opened on 28 December 2016,[1] whilst Line 7 opened on 28 December 2023.[2]

Station layout

Line 6

G - Exits A, C, D
L1
Concourse
Lobby Customer Service, Shops, Vending machines, ATMs
Transfer passageway to Line  7 
L2
Platforms
Platform 2 arrow for L  6  towards Xunfenggang (Suyuan)
Island platform, doors will open on the left
Platform 1  6  towards Xiangxue (terminus) arrow for R

Line 7

G - Exits B, E, F
L1
Concourse
Lobby Customer Service, Shops, Vending machines, ATMs
Transfer Node Transfer passageway to Line  6 
L2
Equipment Area
- Station equipment
L3
Platforms
Platform 4 arrow for L  7  towards Meidi Dadao (Kefeng Lu)
Island platform, doors will open on the left
Platform 3  7  towards Yanshan (Shuixi) arrow for R

Exits

Exit number Exit location
Exit A Kaichuang Dadao
Exit C Xiangxue Sanlu
Exit D Huixing Lu
Exit E Xiangxue Sanlu
Exit F Xiangxue Sanlu
Exit G Xiangxue Sanlu

References

  1. ^ "Line 6 Service Time". Guangzhou Metro. Guangzhou Metro. Retrieved 31 December 2017.
  2. ^ "广州地铁七号线二期和五号线东延段开通运营,长洲岛派出舞狮喜迎开通". 新快报 (in Simplified Chinese). 2023-12-28. Archived from the original on 2023-12-28. Retrieved 2024-01-05.