Jump to content

Jurong West MRT station

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ZKang123 (talk | contribs) at 13:18, 9 April 2020. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

 JS6 
Jurong West
裕廊西
ஜூரோங் வெஸ்ட்
Mass Rapid Transit (MRT) station
General information
Owned byLand Transport Authority
Line(s)
PlatformsIsland
Tracks2
Construction
Structure typeElevated
Platform levels1
Bicycle facilitiesYes
AccessibleYes
Other information
Station code JS6 
History
Opening2026; 2 years' time (2026)
ElectrifiedYes
Services
Preceding station   Mass Rapid Transit   Following station
One-way operation
Template:SMRT lines
S1 North aft Bahar
Future Service
One-way operation
Template:SMRT lines
S1 South bef Bahar
Future Service

Jurong West MRT station (JS6) is a proposed Mass Rapid Transit (MRT) station on the Jurong Region Line in Jurong West, Singapore.[1][2][3]

History

On 9 May 2018, LTA announced that Jurong West station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 1, JRL (West), consisting of 10 stations between Choa Chu Kang, Boon Lay and Tawas, and is expected to be completed in 2026[4].

On 20 November 2019, the Contract J105 for the design and construction of Jurong West Station and associated viaducts was awarded to China Railway 11 Bureau Group (Singapore Branch) at a sum of S$210.1 million. Construction starts in 2020, with completion in 2026.[5][6]. The Contract J105 also includes the design and construction of Bahar Junction Station, and associated viaducts.[7][8]

Location

The station will be straddled over the existing Jurong West Avenue 2, just west of the junction with Jurong West Street 23, and east of the junction with Jurong West Avenue 4, Jalan Bahar and Jalan Boon Lay. It is located within the Jurong West planning area between the Boon Lay Place and Wenya Subzones[9], with a St. Joseph's Home and Singapore Boy's Home to the north, and a housing estate to the south.

Access to the station will be via 3 exits on each side of Jurong West Avenue 2.[10]

References

  1. ^ "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". web.archive.org. 2019-09-21. Retrieved 2019-09-21.
  2. ^ "Residents and students welcome Jurong Region Line but find it confusing". web.archive.org. 2019-09-21. Retrieved 2019-09-21.
  3. ^ "Jurong Region Line". web.archive.org. 2019-09-21. Retrieved 2019-09-21.
  4. ^ "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". web.archive.org. 2019-09-21. Retrieved 2019-09-21.
  5. ^ "LTA | News Room | 1 | LTA Awards Civil Contract to Construct Two Stations for the Jurong Region Line". web.archive.org. 2019-12-09. Retrieved 2019-12-09.
  6. ^ "Wayback Machine" (PDF). web.archive.org. 2019-12-09. Retrieved 2019-12-09.
  7. ^ "Tender information | Land Transport Authority". web.archive.org. 2019-09-21. Retrieved 2019-09-21.
  8. ^ "Construction of Jurong West, Bahar Junction stations on Jurong Region Line to start in 2020, end in 2026, Singapore News & Top Stories - The Straits Times". web.archive.org. 2019-12-09. Retrieved 2019-12-09.
  9. ^ "Singapore's Jurong West Planning Area". Key Location. Retrieved 2019-09-21.
  10. ^ "Jurong Region Line". web.archive.org. 2019-09-21. Retrieved 2019-09-21.