SM UC-96
History | |
---|---|
German Empire | |
Name | UC-96 |
Ordered | 12 January 1916[1] |
Builder | Blohm & Voss, Hamburg[2] |
Yard number | 330[1] |
Launched | 17 March 1918[1] |
Commissioned | 25 September 1918[1] |
Fate | surrendered, November 1918; broken up in Morecambe in 1919–20[1] |
General characteristics | |
Class and type | German Type UC III submarine |
Displacement |
|
Length |
|
Beam | 5.54 m (18 ft 2 in) (o/a) |
Draft | 3.77 m (12 ft 4 in) |
Propulsion |
|
Speed |
|
Range |
|
Test depth | 75 m (246 ft) |
Complement | 32 |
Armament |
|
Notes | 15-second diving time |
SM UC-96 was a German Type UC III minelaying submarine or U-boat in the German Imperial Navy (German: Kaiserliche Marine) during World War I.
Design
A German Type UC III submarine, UC-96 had a displacement of 491 tonnes (483 long tons) when at the surface and 571 tonnes (562 long tons) while submerged. She had a length overall of 56.51 m (185 ft 5 in), a beam of 5.54 m (18 ft 2 in), and a draught of 3.77 m (12 ft 4 in). The submarine was powered by two six-cylinder four-stroke diesel engines each producing 300 metric horsepower (220 kW; 300 shp) (a total of 600 metric horsepower (440 kW; 590 shp)), two electric motors producing 770 metric horsepower (570 kW; 760 shp), and two propeller shafts. She had a dive time of 15 seconds and was capable of operating at a depth of 75 metres (246 ft).[3]
The submarine was designed for a maximum surface speed of 11.5 knots (21.3 km/h; 13.2 mph) and a submerged speed of 6.6 knots (12.2 km/h; 7.6 mph). When submerged, she could operate for 40 nautical miles (74 km; 46 mi) at 4.5 knots (8.3 km/h; 5.2 mph); when surfaced, she could travel 9,850 nautical miles (18,240 km; 11,340 mi) at 7 knots (13 km/h; 8.1 mph). UC-96 was fitted with six 100 centimetres (39 in) mine tubes, fourteen UC 200 mines, three 50 centimetres (20 in) torpedo tubes (one on the stern and two on the bow), seven torpedoes, and one 10.5 cm (4.1 in) SK L/45 or 8.8 cm (3.5 in) Uk L/30 deck gun . Her complement was twenty-six crew members.[3]
Construction and career
The U-boat was ordered on 12 January 1916 and was launched on 17 March 1918. She was commissioned into the German Imperial Navy on 25 September 1918 as SM UC-96.[Note 1] As with the rest of the completed UC III boats, UC-96 conducted no war patrols and sank no ships. She was surrendered on 24 November 1918 and broken up in Morecambe in 1919–20.[1]
References
Notes
- ^ "SM" stands for "Seiner Majestät" (English: His Majesty's) and combined with the U for Unterseeboot would be translated as His Majesty's Submarine.
Citations
Bibliography
- Bendert, Harald (2001). Die UC-Boote der Kaiserlichen Marine 1914-1918. Minenkrieg mit U-Booten (in German). Hamburg, Berlin, Bonn: Mittler. ISBN 3-8132-0758-7.
{{cite book}}
: Invalid|ref=harv
(help) - Gröner, Erich; Jung, Dieter; Maass, Martin (1991). U-boats and Mine Warfare Vessels. Vol. 2. Translated by Thomas, Keith; Magowan, Rachel. London: Conway Maritime Press. ISBN 0-85177-593-4.
{{cite book}}
:|work=
ignored (help); Cite has empty unknown parameter:|last-author-amp=
(help) - Gardiner, Robert, ed. (1985). Conway's All the World's Fighting Ships, 1906–1921. Annapolis, Maryland: Naval Institute Press. ISBN 978-0-87021-907-8. OCLC 12119866.
{{cite book}}
:|first=
has generic name (help)CS1 maint: multiple names: authors list (link) - Tarrant, V. E. (1989). The U-Boat Offensive: 1914–1945. Annapolis, Maryland: Naval Institute Press. ISBN 978-0-87021-764-7. OCLC 20338385.