South Harbor station

Coordinates: 41°30′33″N 81°41′18″W / 41.50917°N 81.68833°W / 41.50917; -81.68833
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Cards84664 (talk | contribs) at 03:23, 30 May 2020 (tidy). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Template:GCRTA Waterfront Line station
The station as viewed from the eastbound platform
General information
Location1300 South Marginal Road,
Cleveland, Ohio
Coordinates41°30′33″N 81°41′18″W / 41.50917°N 81.68833°W / 41.50917; -81.68833
Owned byGreater Cleveland RTA
Platforms2 side platforms
Tracks2
ConnectionsBus transport RTA: NineTwelve Trolley
Construction
Structure typeAt grade
AccessibleHandicapped/disabled access Yes
Other information
WebsiteSouth Harbor Rapid Station
History
OpenedJuly 10, 1996[1]
Services
Preceding station Rapid Transit Following station
East 9th–North Coast
toward Tower City
Waterfront Line
Terminus

South Harbor is a station on the RTA Waterfront Line in Cleveland, Ohio, USA. It is the northern terminus of the Waterfront Line and the terminus of the Blue and Green Lines.

The station is located in a rather isolated setting on the southeast side of the Cleveland Municipal Parking Lot (locally known as the "Muny Lot"), and is generally only useful to access the parking areas. Cleveland Burke Lakefront Airport is relatively close to the station, but to reach the airport one must cross the Cleveland Memorial Shoreway, and there is no pedestrian crossing.

History

The station opened on July 10, 1996,[1] when light rail service was extended 2.2 miles from Tower City through The Flats and along the lakefront. This extension was designated the Waterfront Line, although it is actually an extension of the Blue and Green Lines, as trains leaving this station toward Tower City continue along the Blue or Green Line routes to Shaker Heights.

There have been several proposals to extend the Waterfront Line beyond South Harbor station since its completion in 1996. The proposal currently under consideration would extend the line southeast from through downtown past Playhouse Square and the Cuyahoga Community College main campus, where it would reconnect with the existing line in the vicinity of East 30th Street and the Main Post Office.[2][3] The proposal is intended to improve downtown access to the rapid transit system and to “complete the loop” initiated by the Waterfront Line extension.

Another proposal, part of Cleveland's Lakefront Plan, is to extend the line east along the lakefront as far as East 88th Street and possibly out to Collinwood, where public and private sector development investments would be targeted.[2]

Station layout

P
Platform level
Street level Exit/entrance, parking, buses
Side platform Handicapped/disabled access
Inbound      Waterfront Line toward Tower City (East 9th–North Coast)
Outbound      Waterfront Line termination track →
Side platform Handicapped/disabled access
Chicago Line Norfolk Southern Railway
     Amtrak services do not stop here →
Cleveland Line Norfolk Southern Railway
Norfolk Southern Railway

Notable places nearby

Gallery

References

  1. ^ a b "History of public transit in Greater Cleveland". Cleveland, Ohio: Greater Cleveland Regional Transit Authority. 2012. Retrieved April 17, 2015.
  2. ^ a b "Transit 2025 Long Range Plan" (PDF). Greater Cleveland Regional Transit Authority. December 2004: 61. Retrieved April 17, 2015. {{cite journal}}: Cite journal requires |journal= (help)
  3. ^ "Greater Cleveland RTA rail planning updates". Transportation Choices. EcoCity Cleveland. Archived from the original on December 31, 2004. Retrieved June 20, 2007.

External links