Dongguantounan station
Appearance
![]() Construction site | |
General information | |
Location | 3rd Ring Road, Fengtai District, Beijing China |
Coordinates | 39°51′11″N 116°19′00″E / 39.853142°N 116.316661°E |
Operated by | Beijing Mass Transit Railway Operation Corporation Limited Beijing MTR Metro Line 16 Corp., Ltd. |
Line(s) | Line 16 Fangshan line |
Platforms | 4 (2 island platforms) |
Tracks | 4 |
Construction | |
Structure type | Underground |
Accessible | Yes |
History | |
Opened | 2020 (Fangshan line)[1] 2021 (Line 16)[2] |
Fengyiqiao South station (Chinese: 丰益桥南站) is an interchange station under construction on Line 16 and Fangshan line of the Beijing Subway.
History
This station was originally known as Xiajia Hutong station.[3] The Fangshan line station will open in 2020,[1] and the Line 16 station will open in 2021.[2]
Station Layout
G | Entrances and Exits | Exits A-C |
B1 | Concourse | Faregates, Station Agent |
B2 | Northbound | ← Line 16 towards Beianhe (Lize Business District) |
Southbound | Line 16 towards Wanpingcheng (Fengtai railway station) → | |
B3 | Northbound | ← Fangshan line termination track |
Southbound | Fangshan line towards Yancun East (Shoujingmao) → |
References
- ^ a b "房山线北延阎村车辆段(新扩建区域)冷、热滑试验完成". State Owned Assets Supervision and Administration Commission of People's Government of Beijing Municipality. Retrieved 2020-04-09.
- ^ a b "地铁16号线南段全线2021年底通车". Beijing News. 2019-03-28. Retrieved 2020-04-09.
- ^ "北京:地铁16号线17座车站今起公示【2】". people.cn. Retrieved 2020-04-09.