Jump to content

Tehran Metro Line 5

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Waacstats (talk | contribs) at 16:19, 6 December 2020 (–{{Metro-stub}}, +{{Iran-transport-stub}}, +{{Asia-metro-stub}} using StubSorter). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Tehran Metro Line 5
Overview
Other name(s)Karaj Metro Line 1 (Persian: خط ۱ مترو کرج)
Native nameخط ۵ مترو تهران
OwnerTehran Urban and Suburban Railways Organization (Metro)
LocaleTehran, Tehran Province
Termini
Stations12
Service
TypeCommuter rail
SystemTehran Metro
Operator(s)Tehran Urban and Suburban Railways Organization (Metro)
Depot(s)Tehran-West Depot
History
OpenedMarch 7, 1999 (Initially)[1]
December 31, 2019 (Most recent)[1]
Technical
Line length67.3 km (41.8 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Electrification25 kV AC overhead catenary
Route map

Tehran

Karaj

Line 5 is coloured green on system maps; it is a 67.3-kilometer-long (41.8 mi) regional rail line and has eleven stations.[2] Entering the area of Karaj with main stations at Karaj and Golshahr. It connects with the western end of Line 2 at Tehran (Sadeghiyeh) station. A western extension towards Hashtgerd has been inaugurated in December 2019[3]

The line is also assigned to be Karaj Metro Line 1 in Karaj's 6-line Metro expansion master plan.

Route

References

  1. ^ a b Schwandl, Robert (2010). "Asia - Iran - Tehran Metro". UrbanRail.net. Retrieved 2011-01-17.
  2. ^ "Final profile Tehran Metro Station Line 5" (pdf). Tehran Urban & Suburban Railway Operating Company. Retrieved 2015-09-05.
  3. ^ "President Rouhani inaugurates the Karaj-Hashtgerd new Metro Line". iranpress.com. Retrieved 2020-09-29.