Racecourse-class minesweeper

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by BD2412 (talk | contribs) at 20:33, 7 January 2021 (Fixing links to disambiguation pages, replaced: AdmiraltyAdmiralty). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

HMS Plumpton
Class overview
NameRacecourse class
Operators Royal Navy
Succeeded byHalcyon class
Built1916 & 1918
Completed
  • 24 Racecourse class
  • 8 Improved Racecourse class
General characteristics
Displacement
  • Racecourse class: 810 long tons (823 t)
  • Improved class: 820 long tons (833 t)
Length235 ft (72 m)
Beam
  • Racecourse class: 29 ft (8.8 m)
  • Improved class: 29 ft 3 in (8.92 m)
  • 58 ft (18 m) at the paddles (both types)
Draught6.75–7 ft (2.06–2.13 m)
PropulsionInclined compound. Cylindrical return tube. 1,400 hp (1,000 kW).
Speed15 knots (17 mph; 28 km/h)
Range156 tons coal
Complement50-52 men
Armament
  • Racecourse class:
  • 2 × 12-pounder guns
  • Improved class:
  • 1 × 12-pounder gun
  • 1 × 3-inch AA gun
For the class of ships sometimes known as the "Racehorse" class see 24-class sloop

The Racecourse-class minesweepers were 32 ships delivered to the Royal Navy during the First World War. They were built to two related designs as paddlewheel coastal minesweeping sloops under the Emergency War Programme. The vessels were reasonable sea-boats, but lost speed badly in a seaway when the paddle boxes tended to become choked with water. The class is also widely referred to as the Ascot class and Improved Ascot class.

Initial design

The original design was by the Ailsa Shipbuilding Company. The ships were completed between April and October 1916. Launch dates are shown below.

On this type the foremast is stepped before the fore bridges and have derricks abeam of the second funnel.

Improved Racecourse type

These paddle minesweepers were designed by the Admiralty, adapted from the Ailsa Company design for the first type. They were completed between January and June 1918. All were built under the Emergency War Programme.

The foremast on this type is stepped through the chart house, there are two high ventilators abaft fore funnel and no derricks abeam of the second funnel.

Notes and references

External links