Jump to content

Chenani–Nashri Tunnel

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Rao Ravindra (talk | contribs) at 23:42, 7 August 2018. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Chenani-Nashri Tunnel
Chenani-Nashri Highway Tunnel at night
Overview
Other name(s)Patnitop Tunnel
LocationJammu and Kashmir, India
StatusActive
RouteNH 44
CrossesPatnitop, Kud, and Batote
StartChenani
EndNashri
Operation
Work begunJuly 2011 [1]
Opened2 April 2017 [2]
OwnerNational Highways Authority of India
TrafficAutomotive
CharacterPassenger and freight
Technical
Design engineerIL&FS Transportation Networks Ltd
Length9.2 kilometres (5.7 mi)[3]
No. of lanes2[3]
Operating speed50km/h[4]
Highest elevation1,200 m (3,937 ft)
Width13 m (43 ft)

Chenani-Nashri Tunnel, also known as Patnitop Tunnel, is a road tunnel in the Indian state of Jammu and Kashmir on NH 44 (former name NH 1A before renumbering of all national highways). The work was started in 2011[1] and was inaugurated on 2 April 2017 by Prime Minister Mr. Narendra Modi.[2]

It is India's longest road tunnel with a length of 9.28 km (5.8 mi).[4] It is the first tunnel in the India with a fully integrated tunnel control system.[5] The tunnel reduces the distance between Jammu and Srinagar by 30 km and travel time by two hours. The all-weather tunnel bypasses snowfall and avalanche prone areas in winter at places like Patnitop, Kud, and Batote that obstruct NH 44 every winter and cause long queues of vehicles - sometimes for days at length.[4]

Location

The tunnel is located on the lower Himalayan range at an altitude of 1,200 m (3,937 ft).[4] The Southern portal (end) of the tunnel is at 33°02′47″N 75°16′45″E / 33.0463°N 75.2793°E / 33.0463; 75.2793 and the Northern portal (end) of the tunnel is at coordinates 33°07′43″N 75°17′34″E / 33.1285°N 75.2928°E / 33.1285; 75.2928. The tunnel has been excavated starting from about 2 km (1 mi) from Chenani town south of Patnitop to Nashri village north of Patnitop.

Construction

The foundation was laid for the project in July 2011 by the then Jammu and Kashmir Chief Minister Omar Abdullah with Union Health Minister Ghulam Nabi Azad, under the ruling UPA government.[1][6] The original estimate to build this two-lane tunnel was 2,520 crore (US$300 million), but escalated to a total of 3,720 crore (US$450 million).[7][4] The scheduled date of completion for the project was May 2016 and the executing agency was hopeful of finishing the job by December 2015, which was around five months ahead of the deadline. Later, due to a dispute between the construction workers and the executing agency, the work was delayed and the target of completion ahead of schedule couldn't be achieved. The next planned date was June 2016 which was then further extended to July 2016.[8]

On 12 October 2016, it was reported that almost all the work had been completed and the remaining work was planned to be finished in a few days and that "98 percent civil work including construction of 9 km tunnel and its approach road has been completed while the installation of equipment and gadgets like sound diffusers, ventilators, fans, firefighter equipment, electrical panels, transformers, lighting etc. inside the tunnel is under progress and likely to be completed in next 20-30 days." They added that after the completion of remaining work, it has to pass the quality and commuters’ safety tests, and that the entire process would be completed by last week of November and authorities will either inaugurate the "ambitious" project in last week or November of first week of December, depending upon the availability of representatives from Union Government.[8]

However the project had not been completed by January 2017 and there was an uproar in the Jammu and Kashmir Assembly, where the opposition legislators demanded to know why the tunnel was not opened stating that both Jammu-Srinagar and Jammu-Kishtwar National Highways are closed at various places due to land sliding and added that several passengers were trapped on both the Highways at various places.[9]

On 3 February 2017, official sources said that the project was getting delayed due to bad weather conditions and snowfall on the highway, which snapped the electricity supply to the area and so the executing agency was unable to continue with the required testing and inspection processes.[10]

According to a news article on 1 March 2017, the Independent Engineers (IEs) reported that the demonetization on 8 November 2016 resulted in work getting affected drastically as the contractors failed to pay the labour involved in the work. Their report said that the contractors were unable to collect the tools and tackles of small amount due to the restrictions of amount withdrawal from the Bank accounts, and the subcontractors were not able to pay to daily labour wage which was around Rs.200, besides being unable to purchase the essential material from local market due to non-availability of cash." The Construction Company's Executive, Shafaq Syed also confirmed, "Demonetization crippled our working. We were unable to make payments to our subcontractors. Paying wages had become impossible."[11]

The tunnel was inaugurated by the Prime Minister Narendra Modi on 2 April 2017. The construction involved nearly 1,500 engineers, geologists and labourers, besides skilled workers. The National Highways Authority of India has spent Rs.3,720 crore on the project.[2][12]

Features and benefits

The Chenani-Nashri tunnel comprises two tubes that run parallel to each other — the main traffic tunnel of diameter 13 m and a separate safety or escape tunnel of diameter 6 m alongside. The two tubes — each approximately 9 km long — are connected by 29 cross passages at regular intervals of every 300 meters along the entire length of the tunnel. These passages add up to about 1 km of tunnel length, and the main and escape tubes, plus the cross passages make up about 19 km of tunnel length. Since such a long tunnel could present the problem of a lack of oxygen, to ensure that there is no excessive carbon-dioxide build-up inside, there are several exhaust meters that will check the air all through the length of the tunnel. With inlets, every 8 meters, bringing fresh air into the main tube, and exhaust outlets every 100 m opening into the escape tube, the tunnel is the country’s first — and the world’s sixth — road tunnel with a transverse ventilation system. Transverse ventilation will keep tailpipe smoke inside the tunnel at a minimum level in order to prevent suffocation and keep visibility at acceptable levels, especially since the tunnel is so long. The 29 cross passages between the two tunnels will be used to evacuate, through the escape tunnel, a user who might be in distress or to tow away any vehicle that might have broken down in the main tunnel. A total of 124 cameras and a linear heat detection system inside the tunnel will alert the Integrated Tunnel Control Room (ITCR) located outside the tunnel to the need for intervention. In the case of a traffic violation, the Control Room informs the traffic police deployed outside the tunnel, who shall impose a fine on errant drivers on the spot.[5][4][13]

SOS boxes installed every 150 m will act as emergency hotlines for commuters in distress. To connect to the ITCR to seek help, one would only need to open the door of the SOS box and say ‘Hello’, said an executive of the project. Commuters can use their mobile phones inside the tunnel. To prevent diminution of vision as a result of change in the light while going in or coming out of the tunnel, the lighting inside has been adjusted at a gradient of luminous strength. The tunnel is built with fire safety measures. As soon as sensors detect fire, a safety protocol will kick in, and the pushing of fresh air will stop and only exhausts will function. Longitudinal exhaust fans installed at regular intervals will concentrate on 300 m on either side of the fire, pushing the smoke upward. Ambulances or vehicles carrying foam will rush through the escape tunnel to evacuate commuters and fight the fire.[5]

The heat detection system inside the tunnel will record rises in temperature in the tunnel — the result of excessive emissions which may be caused by one or more vehicles. In such cases, the ITCR will get in touch with staff inside the tunnel, and the offending vehicle will be pulled over into a lay-by and subsequently removed by a crane through the parallel escape tunnel.[5]

The tunnel is located at an altitude of nearly 4,000 feet in difficult Himalayan terrain. Despite having been excavated in such geographic conditions, both tubes are completely waterproof.[5]

Because of this two-lane tunnel, the distance between Chenani and Nashri and hence between Jammu and Srinagar is reduced by 30 km and travel time is cut by two hours. The tunnel bypasses 44 avalanche and landslide-prone spots on the highway. It is an "all-weather" tunnel and enables an increase in trade and tourism in the state. The tunnel also has parking spots in case of vehicle breakdowns.[12]

See also

References

  1. ^ a b c "Centre unveils Rs 10,000 cr road projects for J&K - The Hindu". Retrieved 3 April 2017.
  2. ^ a b c "PM Modi inaugurates Indias longest road tunnel in J&K - The Hindu". Retrieved 3 April 2017.
  3. ^ a b "IL&FS Transportation Networks Ltd - Chenani-Nashri Tunnel Project Page". Retrieved 24 March 2017.
  4. ^ a b c d e f "PM Narendra Modi to inaugurate India's longest tunnel: 10 facts about the 'engineering marvel'". Hindustan Times. 27 March 2017. Retrieved 27 March 2017.
  5. ^ a b c d e "Chenani-Nashri tunnel: Through the heart of the Himalayas, a shorter, safer route to the Valley". The Indian Express. 30 March 2017. Retrieved 3 April 2017.
  6. ^ "CENTRE UNVEILS RS 10,000 Cr ROAD PROJECTS FOR JK". Greater Kashmir. Retrieved 3 April 2017. {{cite news}}: Cite has empty unknown parameter: |dead-url= (help)
  7. ^ "PM to inaugurate Chenani Nashri tunnel, read the facts". Retrieved 19 March 2017. [dead link]
  8. ^ a b "9-km Chenani-Nashri tunnel to be thrown open in November". Greater Kashmir. Retrieved 3 April 2017. {{cite news}}: Cite has empty unknown parameter: |dead-url= (help)
  9. ^ "Uproar in Assembly on Jammu Srinagar Highway". Kashmir Observer. 18 January 2017. Retrieved 3 April 2017.
  10. ^ "Finally, light at end of Chenani-Nashri tunnel". Greater Kashmir. Retrieved 3 April 2017. {{cite news}}: Cite has empty unknown parameter: |dead-url= (help)
  11. ^ "Demonization delayed opening of Chenani-Nashri tunnel". Kashmir Life. Retrieved 3 April 2017. {{cite web}}: Cite has empty unknown parameter: |dead-url= (help)
  12. ^ a b "New tunnel between Srinagar, Jammu to shorten distance by 2 hours - Times of India". The Times of India. Retrieved 3 April 2017.
  13. ^ Upadhyay, Abhishek. "Asia's Longest Bi-directional Tunnel – Chenani-Nashri-Tunnel". Shared Machine. {{cite web}}: Cite has empty unknown parameter: |dead-url= (help)

Further reading