Jump to content

Earthquake Memorial Bridge

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Tec15 (talk | contribs) at 14:13, 24 January 2016 (added Category:Japan–Pakistan relations using HotCat). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Earthquake Memorial Bridge is a 246 meter long extradosed bridge in Muzaffarabad connecting Naluchi and Chattar on the banks of Jhelum River. The bridge costing over Rs. 1.5 billion is funded by Japan Bank for International Cooperation and was completed on August, 2014. The bridge also features 15-metre sidewalks on either side.[1][2][3]

References