Klang Third Bridge

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
Klang Third Bridge

Jambatan Ketiga Klang
CarriesMotor vehicles
CrossesKlang River
Official nameJambatan Ketiga Klang
Maintained byKlang Municipal Council (MPK)
Characteristics
DesignBalanced cantilever box girder
Total length2,525 meters
Width4-lane carriageway
Longest span1,200 meters
History
DesignerMalaysian Public Works Department (JKR)
Constructed byCergas Murni Sdn Bhd
Opened2017
Entrance to the Klang third bridge from the south (Jalan Sungai Bertih)
On the Klang third bridge from the south (Jalan Sungai Bertih) towards the north (Jalan Goh Hock Huat)
Underpass U-turn at the Klang third bridge on the north side
Traffic intersection at the end of the Klang third bridge (north side) towards Jalan Goh Hock Huat, Kapar and Meru

The Klang Third Bridge, also known as Jambatan Ketiga Klang (Jambatan Ke-3 Klang) is a modern engineering infrastructure in royal town of Klang in the state of Selangor, Malaysia. Built at a cost of RM230 million, the Klang Third Bridge complements the two existing bridges in Klang, namely the Kota Bridge and the Musaeddin (Tengku Kelana) Bridge.[1] All three bridges cut across the Klang River, connecting the northern and southern parts of Klang. The Klang Third Bridge was opened for traffic on 24 May 2017.[2]

History[edit]

The Klang Third Bridge project was first mooted in early 2008. Based on the state Public Works Department survey, about 43,000 vehicles used the Musaeddin (Tengku Kelana) Bridge whilst 150,000 vehicles ply the Kota Bridge daily. With the increasing traffic, there was a dire need to construct the third bridge for Klang.[3]

A ground-breaking ceremony of the bridge project was officiated on 4 March 2008 jointly by then Selangor Menteri Besar Datuk Seri Dr Mohd Khir Toyo and Malaysian former works minister Datuk Seri S. Samy Vellu. However, the project did not take off as it was interrupted by a change of the state government following the general election which saw the collapse of the Barisan Nasional state government in Selangor.[4]

In 2014, the bridge project was resurrected when former Selangor Menteri Besar Tan Sri Khalid Ibrahim announced that the Pakatan Harapan state government had set aside RM300 million for the construction of the Klang Third Bridge. The completion of the bridge was delayed twice due to technical problems in land acquisition, relocation of a nearby temple and also the construction of a government health clinic.[5]

Features and connectivity[edit]

The Klang Third Bridge was constructed using the sophisticated balanced cantilever box girder technology, and the project was being carried out by Syarikat Cergas Murni Sdn. Bhd. through an open tender system with the contract value of RM199 million, under the close supervision of the state Public Works Department (JKR). The cantilever bridge with four-lane carriageway spans 1,200 meters with an elevation of 150 meters above the Klang River, with a total length of 2,525 meters connected to a 3.8km upgraded roads on both sides of the bridge.[6]

The 1.2km-long bridge connects the northern and southern parts of Klang through Jalan Goh Hock Huat and Jalan Sungai Bertih respectively.[7] The bridge is aimed to facilitate traffic between Klang north (Kapar, Meru, Federal Highway, NKVE) and Klang south (Port Klang, Bandar Bukit Tinggi, Bandar Botanic, KESAS, SKVE), hence re-routing the traffic from entering the Klang town centre.[8] It is expected that over 60,000 vehicles will use the bridge daily, reaching its full capacity of 120,000 vehicles daily by the year 2032.[9][10]

Gallery[edit]

References[edit]

  1. ^ "RM230m third Klang Bridge to be ready by mid-2017, Azmin says". The Malay Mail.
  2. ^ "Klang's third bridge opens". The Star, Malaysia.
  3. ^ "Jambatan Ketiga Klang Kurangkan 20% Kesesakan, Siap Julai 2016". Malaysian Digest.
  4. ^ "Klang's third bridge to be ready by year end". The Star, Malaysia.
  5. ^ "Klang's third bridge to open by March". The Star, Malaysia.
  6. ^ "Jambatan Ketiga Klang: Teknologi tanpa tiang, atasi aliran trafik". Selangorkini.
  7. ^ "Klang Bridge Faces Delay". Property Guru Malaysia.
  8. ^ "Klang's third bridge ready". The Star, Malaysia.
  9. ^ "Jambatan Ketiga Klang siap 2016" (PDF). Works Ministry, Malaysia.
  10. ^ "First phase of Klang third bridge to be completed in July 2016". The New Straits Times, Malaysia.