Jump to content

Line 10 (Chengdu Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Yobot (talk | contribs) at 09:09, 27 November 2016 (→‎Phase I: WP:CHECKWIKI error fixes using AWB). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 10
Overview
Statusunder construction
OwnerCity of Chengdu
LocaleChengdu, China
Termini
  • Taipingyuan
  • Airport T2/Nanhe
Stations14
Service
Typerapid transit
SystemChengdu Metro
Services2
Operator(s)Chengdu Metro Corporation
History
Planned openingOctober 2017
Technical
Line length38.2 km (23.74 mi)
Characterunderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)

Line 10 of the Chengdu Metro (Chinese: 成都地铁10号线; pinyin: Chéngdū Dìtiě Shí Hào Xiàn) or Airport Express Line (Chinese: 机场快线; pinyin: Jīchǎng Kuàixiàn) runs from Wuhou District to Shuangliu District/Xinjin County. It starts at Taipingyuan and ends at Airport T2/Nanhe. The total length is 38.2 km. Line 10's color is sky. Airport Express Line began construction in July 2014 (Phase I) or 2016 (Phase II), and will be completed in October 2017 (Phase I)[needs update] or 2020 (Phase II).[needs update][1] from Taiping yuan to Airport T2/Nanhe.

Airport Express Line stations

  • Fast: Taipingyuan - Huaxing - Jinhua - Airport T1(T2) - Highway Shuangliu West Railway Station - Highway Xinjin Railway Station - Coach Terminal Center - Ruloin Road - Nanhe
  • Slow: Every stations stops

Phase I

Station Transfers
Taipingyuan Station
  Line 3
  Line 7
Cujing
Huaxing
  Line 9
Jinhua (planned)
Airport T1
Airport T2 (planned)

Phase II

Station Transfers
Highway Shuangliu West
  Line 3
(planned)
Baita Temple
Huayuan
Highway Xinjin
Huaqiao
Coach Terminal Center
Ruloin Road (planned)
Daxin Road
Nanhe

References

  1. ^ "成都地铁10号线开始站后施工 预计2017年通车" (in Chinese). Sichuan online. 2 June 2016. Retrieved 2016-07-04. {{cite news}}: Italic or bold markup not allowed in: |publisher= (help)