Jump to content

Line 5 (Mumbai Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 111.91.75.243 (talk) at 08:49, 13 October 2018. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Metro 5
Overview
StatusPlanned
OwnerMumbai Metropolitan Region Development Authority (MMRDA)
LocaleThane, Mumbai, Maharashtra, India
Termini
  • Thane
  • Kalyan
Stations17
Websitehttps://mmrda.maharashtra.gov.in/metro-line-5
Service
TypeMetro
SystemMumbai Metro
History
Commenced2017; 7 years ago (2017)
Planned opening2022; 2 years ago (2022)
Technical
Line length24.9 km (15.5 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

Template:BS-map

Metro 5 of the Mumbai Metro, also referred to as the Thane-Bhiwandi-Kalyan corridor, is part of the metro system for the city of Mumbai, India. This line is fully elevated.

The 24.9 km-long Thane-Bhiwandi-Kalyan Metro-V corridor will have 17 stations and will cost Rs. 8,416 crore. It will be totally an elevated corridor. It will connect Thane to Bhiwandi and Kalyan in the eastern suburbs. The stations include Kapurbawdi in Thane (West), Balkum Naka, Kasheli, Kalher, Purna, Anjur Phata, Dhamankar Naka, Bhiwandi, Gopal Nagar, Temghar, Rajnouli Village, Govegaon MIDC, Kongaon, Durgadi Fort, Sahajanand Chowk, Kalyan railway station and Kalyan APMC. The line was approved by the Maharashtra Cabinet on 24 October 2017.[1]

The MMRDA began carrying out survey work for the line by December 2017.[2] Survey work was interrupted due to protests by some shopkeepers and residents of Bhiwandi.[3]

It will be ready by 2021-22.

Stations

There will be 17 stations on Line 5.

Line 5
# Station Names Connections
1 Kapurbawdi Line 4 (Mumbai Metro)
2 Balkum Naka None
3 Kasheli None
4 Kalher None
5 Purna None
6 Anjur Phata None
7 Dhamankar Naka None
8 Bhiwandi None
9 Gopal Nagar None
10 Temghar None
11 Rajnouli Village None
12 Govegaon MIDC None
13 Kongaon None
14 Durgadi Fort None
15 Sahajanand Chowk None
16 Kalyan railway station None
17 Kalyan APMC None

References

  1. ^ "Mumbai Metro's corridor 5 and 6 gets Maharashtra cabinet approval". Livemint. 24 October 2017. Retrieved 9 October 2018.
  2. ^ "Mumbai Metro-5 to move through crowded areas of Thane". The Asian Age. 28 December 2017. Retrieved 9 October 2018.
  3. ^ "Bhiwandi residents oppose Metro 5". The Asian Age. 1 August 2018. Retrieved 9 October 2018.