South Dakota Highway 100
Route information | ||||
---|---|---|---|---|
Maintained by City of Sioux Falls | ||||
Major junctions | ||||
South end | I-29 south of Sioux Falls | |||
SD 11 in Sioux Falls SD 11 / SD 42 in Sioux Falls | ||||
North end | I-90 north of Sioux Falls | |||
Location | ||||
Country | United States | |||
State | South Dakota | |||
Counties | Lincoln, Minnehaha | |||
Highway system | ||||
| ||||
|
South Dakota Highway 100 (SD 100) is the designation of a future state highway that will be built south and east of Interstate 229 (I-229) as a second eastern bypass of Sioux Falls. The highway will run from exit 73 on I-29 east and north to exit 402 on I-90.
Route description
SD 100 is expected to facilitate commercial and residential growth in the eastern section of the city of Sioux Falls. It will also serve as a second eastern bypass of the city, running roughly parallel to I-229 and about 2.5 miles (4.0 km) outside of it.
As proposed, SD 100 will begin at the single-point urban interchange (SPUI) at exit 73 along I-29. It will run in a general northeasterly direction just outside of the southern extremities of Sioux Falls and enter the Sioux Falls city limits just west of its intersection with SD 115 (Minnesota Avenue).[1] The route is to continue to the northeast past this intersection until it reaches what is now 69th Street; at that point, the route will curve to the east and follow that alignment. It will continue to follow 69th Street until east of an intersection with Sycamore Avenue, at which point it is to bend to the northeast.[2] While heading northeast, the road will meet SD 11, and the two routes will together curve due north along Powder House Road. The road will meet 57th Street at a SPUI that is yet to be constructed and cross from Lincoln County into Minnehaha County.
After intersecting 57th Street, SD 100 and SD 11 will continue north to an intersection with SD 42 (Arrowhead Parkway). At this intersection, SD 11 will leave SD 100 and turn east along SD 42.[3] SD 100 is to continue north of this intersection along Powder House Road until just south of Madison Street, where it will curve slightly to the northeast. The highway will continue northeast until intersecting a proposed extension of Benson Road at another SPUI. Here, the road will curve northwest to intersect Rice Street, then back to the north before crossing the Big Sioux River and intersecting 60th Street North. Just north of 60th Street North, SD 100 will end at what is currently a diamond interchange, but is proposed to be upgraded to a SPUI, at exit 402 on I-90.[4]
History
Proposed major intersections
This section is missing mileposts for junctions. |
County | Location | mi | km | Destinations | Notes |
---|---|---|---|---|---|
Lincoln | | I-29 | Exit 73 on I-29; single-point urban interchange (SPUI) | ||
Sioux Falls | SD 115 (Minnesota Avenue) | ||||
Minnehaha | SD 11 south (Powder House Road) | Southern end of SD 11 concurrency | |||
SD 11 north / SD 42 (Arrowhead Parkway) | Northern end of SD 11 concurrency | ||||
| I-90 | Exit 402 on I-90; diamond interchange, proposed SPUI | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- ^ Segment 0 - I-29 to SD115 (Minnesota Ave.) (PDF) (Map) (Revised ed.). Cartography by Brenda Miller. South Dakota Department of Transportation (published November 22, 2011). April 1, 2009. Retrieved March 4, 2015.
- ^ Segment 1 - SD115 (Minnesota Ave.) to Sycamore Ave (PDF) (Map) (Revised ed.). Cartography by Brenda Miller. South Dakota Department of Transportation (published November 22, 2011). April 1, 2009. Retrieved March 4, 2015.
- ^ Segment B(2) - Sycamore Ave. to SD42 (10th Street) (PDF) (Map) (Revised ed.). Cartography by Brenda Miller. South Dakota Department of Transportation (published November 22, 2011). April 1, 2009. Retrieved March 4, 2015.
- ^ Segment C(3) - Madison Street to Interstate 90 (PDF) (Map) (Revised ed.). Cartography by Brenda Miller. South Dakota Department of Transportation (published November 22, 2011). April 1, 2009. Retrieved March 4, 2015.