Jump to content

Talk:Młodzikowice

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

This 3D-Printed Office Was Built In 17 Days

[edit]

Dubai just opened a 3D-printed office building that was built in less than three weeks. To be exact: in 17 days.

Dubai says it’s the first functioning 3D-printed office building in the world, and it cost around $140,000, Reuters reported. It was built using an industrial 3-D printer that measures 120 feet tall and 40 feet wide and has a robotic arm.

MOREIf The UAE Builds A Mountain Will It Actually Bring More Rain? Emirates part of the UAE’s state media wing, reported that the building used 3-D printing technology to offer services in the building like electricity, water, air-conditioning, and a phone line. It also reported the “latest technology” had been used “in the management of information systems” within the building, although it didn’t offer detail — Preceding unsigned comment added by Otitoloju Ayomide (talkcontribs) 12:43, 25 May 2016 (UTC)[reply]