Jump to content

Template talk:Warrington and Altrincham Junction Railway

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Wrong

[edit]

The diagram is wrong. After Baugley the loop is still in service, the line runs parallel to the Meterolink, where the metrolink terminates at the next station and the mainline continues to Chester & Northwich. The line the is in darker red from Skelton junction is closed, it was a CLC line the Glazebrook East Junction to Skelton Junction Line.--Kitchen Knife (talk) 23:43, 3 June 2015 (UTC)[reply]