From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ZéroBot (talk | contribs) at 13:41, 4 July 2011 (r2.7.1) (robot Adding: fr:Thistle). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Thistle
a mostly destroyed building with a sandstone arch entrance still standing. The arch is being propped up with wood to prevent its collapse. Above the doorway is a wooden sign that reads Thistle; some letters have fallen off.
Remnants of the Thistle schoolhouse
Map of the United States with Utah highlighted in red
Location of Utah in the United States
CountryUnited States
StateUtah
CountyUtah
Established1878
Destroyed1983
Named forThistle
Elevation5,043 ft (1,537 m)
Zip code
84629[2]

Thistle is a ghost town in Utah County, Utah, United States, about 65 miles (105 km) southeast of Salt Lake City. During the era of steam locomotives, the town's primary industry was servicing trains for the Denver and Rio Grande Western Railroad (often shortened to D&RG, D&RGW or Rio Grande). The fortunes of the town were closely linked with those of the railroad until the changeover to diesel locomotives, when the town started to decline.

In April 1983, a massive landslide (known as a slump) dammed the Spanish Fork River. The residents were evacuated as nearly 65,000 acre-feet (80,000,000 m3) of water backed up, flooding the town. Thistle was almost completely destroyed; only a few structures were left partially standing. Federal and state government agencies have claimed this was the most costly landslide in United States history,[3][4] the economic consequences of which affected the entire region. The landslide resulted in the first presidentially declared disaster area in the state of Utah.[3][5]

U.S. Route 6 (US-6), US-89 and the railroad (now part of Union Pacific Railroad's Central Corridor) were closed for several months, until they were rebuilt on a higher alignment overlooking the area. The remains of Thistle are visible from a rest area along US-6 or from the California Zephyr passenger train.

Geography

Thistle is about 65 miles (105 km) southeast of Salt Lake City, at the confluence of the two primary tributaries to the Spanish Fork River, Thistle Creek and Soldier Creek.[6] This confluence, at an elevation of 5,043 feet (1,537 m),[1] is also the junction of two naturally formed routes across the mountains of central Utah. The primary route crosses the Wasatch Mountains, via the Wasatch Plateau and Soldier Summit. This route was carved by the tributaries of the Price River on the eastern side of the mountains and the Spanish Fork River on the west. In addition, Thistle Creek provides a route south from Thistle towards the communities of the Sanpete and Sevier Valleys.[7] The Spanish Fork River flows northwest from Thistle, towards the city of Spanish Fork, before reaching Utah Lake.[6]

These natural paths have provided the route of several transcontinental trails, highways and railroads since their discovery. The named transportation arteries passing through Thistle include: US-6 (originally numbered US-50), US-89, the Denver and Rio Grande Western Railroad's Utah Division (now part of Union Pacific Railroad's Central Corridor)[8][9] and D&RGW's Marysvale branch line (abandoned because of the landslide).[10]

History

The trade route on which Thistle lies was used by Native American tribes before the arrival of European settlers; two Ute Indian chiefs, Taby and Peteetneet, led seasonal migrations through the canyon each spring and fall.[11] The first recorded journey by Europeans to modern Thistle was the Dominguez–Escalante Expedition, which was escorted through the territory by American Indian guides.[12] A small group of Utes inhabiting the canyon frequently clashed with newcomers, and as a result were forcibly relocated in the 1870s.[7]

Historical population
CensusPop.Note
188081
1890365350.6%
1900187−48.8%
1910409118.7%
19204172.0%
1930288−30.9%
194031810.4%
1950248−22.0%
Source: U.S. Census Bureau[13]

Most of Thistle's residents were railroad employees sent to live in the town, but there were some who had settled before the railroads arrived. The first Europeans were part of the Mormon migration to Utah, and the first of these was the Pace family, who migrated from Nauvoo, Illinois, reaching Thistle in 1848. Fifth-generation descendants of the Pace settlers continued to operate a family-owned cattle ranch until the town was evacuated.[14] Other settlers included Mormons who originally settled elsewhere in Utah but subsequently arrived to homestead fertile ground on Billies Mountain, on the north wall of the canyon. Among them was the mountain's presumed namesake, William Johnson. Homesteading was practiced in Thistle until the early 1900s. Until the arrival of the railroads the town's economy was based mainly on farming and ranching, although there was also some mining activity in the region, including a vein of asphaltum that was mined between 1892 and 1914.[15]

Railroads

The first railroad track laid through Thistle was a narrow-gauge spur line servicing coal mines near today's Scofield Reservoir, built in 1878 by the Utah and Pleasant Valley Railway. By 1890, the Denver and Rio Grande Western, which acquired the line in a foreclosure sale in 1882,[16] had rebuilt the line to standard gauge. The D&RGW connected this line with one they had built west from Colorado, completing a link from Salt Lake City to Denver.[17]

The railroad built several facilities in Thistle to service and prepare trains for the change in grade and curvature of the line. The railroad placed helper engines on eastbound trains at Thistle for the ascent to Soldier Summit. The town provided a meal service for the trains until the use of on-board dining cars eliminated the need for meal stops.[17]

An aerial picture of a de-stabilized mountain sliding and creating a dam and lake. Various construction activity is present to the left of the slide area.
Aerial photo of the Thistle area in spring 1983 showing the dam formed by the landslide, "Lake Thistle" over the submerged town, and the construction to re-route US-6 and the D&RGW around the landslide area

Thistle saw more rail traffic with the construction of the Marysvale branch line. This line branched from the main at Thistle, following modern US-89 towards mines near Marysvale. Another line through Thistle, paralleling the D&RGW main, was built by the Utah Railway. The two lines were later combined into a dual-track main line, as part of a trackage rights agreement between the two companies.[18]

Rail traffic through Thistle continued to increase as the Rio Grande partnered with connecting railroads, making the rail line through Thistle a bridge line for transcontinental rail traffic. The growth of Thistle was closely tied to the success of the Denver and Rio Grande Railroad throughout the era of steam locomotives.[10]

At its peak, around 1917, Thistle had about 600 residents. The town's railroad infrastructure included a five-stall roundhouse, depot, machine shop, and structures to restock passing trains with sand, coal and water. Non-railroad infrastructure included general stores, a post office, barber shop, saloon, pool hall, bakeries and restaurants. The largest building was a two-story schoolhouse, built in 1911.[19]

In the 1950s, the Denver & Rio Grande Western began to phase out steam locomotives in favor of diesel locomotives. With the change in technology, Thistle faded in importance.[18] Gradually the town shrank in population; the passenger depot was torn down in 1972 and the post office closed in 1974. By 1983, only a few families remained in Thistle.[10]

Landslide

View through a dirty window, showing power lines in the foreground and a scarred mountain with the scar leading to an earthen dam.
A view from the California Zephyr, after the slide, showing the dam formed by the landslide and the scar from where the dirt slid

Rio Grande maintenance personnel noticed unstable ground downstream from Thistle years before the landslide occurred. The maintenance crew repaired the track on several occasions, but did not fully investigate the problem.[18] Beginning with the remnants of Hurricane Olivia, the autumn and winter of 1982–83 featured record-breaking snow and rainfall. As the spring thaw melted the winter snow, the mountains in the area became saturated with water.[20]

By April 1983, track deformation was a serious issue. On April 13, the division trackmaster flew to Denver to explain the situation at a specially-called staff meeting. That same day, a Utah Highway Patrol officer struck a newly created buckle in the highway that threw him against the roof of his vehicle. By the end of the day, a full maintenance crew was struggling to keep US-6 open. All trains were limited to speeds less than 10 miles per hour (16 km/h), and were accompanied by maintenance personnel who had to continually work to keep the tracks in-line. The last train to pass through downtown Thistle was the westbound Rio Grande Zephyr, on April 14, 1983 at about 8:30 p.m. That evening, both US-6 and the rail line were closed. One westbound freight train that had already left Denver was turned back. All through trains between Denver and Salt Lake City were rerouted to Union Pacific Railroad's Overland Route through Wyoming. By April 16, the tracks were completely buried.[21][22]

a river is in the center of the picture, with a canyon wall and mountains visible on the right side. To the left of the river is a black streak, remains of a rail line. To the right of the river is an abandoned road, with a new road and rail line in cuts along the canyon wall.
Looking northwest from the rest area along U.S. Route 6 showing the abandoned railroad and highway grades next to the replacement alignments

On April 17, a final attempt to keep the landslide from blocking the flow of the river failed. That day, the Utah Department of Transportation and the Rio Grande announced plans to abandon the existing transportation arteries and build new corridors. Both the highway and railroad would be re-routed by blasting a path scaling the north wall of Spanish Fork Canyon. The new arteries would pass the slide by dynamiting through Billies Mountain, also along the north canyon wall. Concerned the dam could fail, the state of Utah eventually decided to build a tunnel to re-route the flow of the Spanish Fork River.[10] Engineers estimated the dam created by the toe of the landslide would eventually reach between 200 feet (60 m) and 300 feet (90 m) tall. A mandatory evacuation order was issued for the town of Thistle. Volunteers transported as many people and belongings as possible to the small town of Birdseye, about 5 miles (8.0 km) south. Most residents were able to recover only a fraction of their belongings; some had less than two hours notice before the water reached their house.[23] Thistle's oldest resident celebrated her 90th birthday at the evacuation center in Birdseye.[24] By the 18th, the waterline had reached the rooftops of the 22 previously occupied houses. By the 19th, an entire mountain was moving at about 2 feet (0.6 m) per hour and US-6 was buried by 50 feet (15 m) of soil.[25]

Governor Scott Matheson requested federal aid to deal with the situation. After a visit to the area by the director of the Federal Emergency Management Agency, U.S. president Ronald Reagan issued the first presidential disaster area declaration for the state of Utah.[3][5] The landslide eventually formed a dam that created a lake 3 miles (5 km) long and over 200 feet (60 m) deep.[5] The residents of downstream Spanish Fork were told to be prepared to evacuate. Engineers estimated that if the dam failed, they would have 30 to 45 minutes notice before the water reached the city.[25]

Aftermath

A partially submerged house covered in overgrown vegetation and with a deteriorating roof
One of the few houses at Thistle to survive the landslide

Thistle was almost completely destroyed. Most wooden buildings were carried away in the floodwaters. The state installed a temporary pumping station to prevent the lake from overflowing the dam; patrol boats skimmed up the floating remains of the town to prevent the debris from blocking the pumps. Most remains were either naturally deposited or placed on the eastern shore of the lake.[26]

By autumn, the tunnels to restore the flow of the river and drain the lake were operational. Shortly after, debates between former residents, neighboring residents and government agencies began on what to do with the dam created by the landslide; some wanted make the lake permanent. A study commissioned by the state engineer, to determine if the landslide dam could be used to retain water, recommended to build a new dam upstream from the landslide, rather than attempt engineering work on the landslide dam.[27]

In the years following, the former residents of Thistle filed various lawsuits to recover their losses. In one, they claimed that their property was taken to rebuild the road and railroad without just compensation.[28] Another lawsuit claimed negligence on the part of the D&RGW. The residents argued the railroad's maintenance workers knew the ground was unstable; however, they only repaired the track. The residents contended the slide could have been prevented by using a water drainage system to relieve pressure at the head of the unstable area. They further contended that such a system could have been put in place had the railroad thoroughly investigated the problem upon first noticing it. The engineering firm employed by the Rio Grande claimed their studies indicated the crown of the landslide was about 300 feet (90 m) above the level of the tracks, and did not know the true size of the unstable area until the slide was in motion. A jury absolved the D&RGW of responsibility.[29][30] The plaintiffs appealed the decision, and a second trial in 1993 resulted in a $1.1 million award for the landowners (equivalent to $3 million in 2024).[31] The D&RGW filed suit against the Utah Railway over sharing the costs from the landslide. The Utah Railway has an ownership interest in the line, resulting from an older track sharing agreement.[32]

Economic effects

a mostly tree covered mountain side with a zig-zag shaped stripe void of trees, only grass and some fresh dirt visible.
The Thistle landslide, as seen from a rest area along U.S. Route 6

The landslide closed the main railroad for three months, and U.S. Route 6 and U.S. Route 89 for eight months, during which time the communities of eastern and southeastern Utah were cut off from the rest of the state. Security for the isolated part of Utah County was temporarily assigned to the Utah Highway Patrol.[33]

The economic effects of the closure of these transportation arteries were felt throughout the western United States and devastated rural Utah. The operations of coal mines, uranium mines, turkey farms, animal feed companies, gypsum mines, and cement and clay factories were severely impacted. At least two trucking firms and one oil-producing firm suspended or ceased operations. Southeastern Utah's tourism industry suffered without access for visitors from the north and west. Some people who lived and worked on opposite sides of the landslide area suddenly had commutes exceeding 100 miles (160 km).[10][34] The highway patrol temporarily closed a weigh station at Peerless (a location along the US-6 corridor near Helper) and built a temporary weigh station near Salina (along I-70 about 90 miles (140 km) south of Thistle), which saw a sudden increase in truck traffic. The highway patrol estimates the temporary facilities inspected 57,000 trucks and made 80 arrests.[33]

The direct cost of the landslide was estimated at $200 million (equivalent to $612 million in 2024). However, some estimates of the total cost reached as high as $400 million (equivalent to $1224 million in 2024).[34][35] The D&RGW estimated the slide cost them $80 million in lost revenue (equivalent to $245 million in 2024), averaging $1 million per day the tracks were out-of-service. This figured included $19 million in payments to the Union Pacific for the use of their lines.[10] The United States Geological Survey and the state of Utah have called the Thistle landslide the most costly ever in the United States.[3][4]

Railroad

To expedite construction, the railroad had crews in Utah focused on grading the new path and boring a 3,000-foot (910 m) tunnel, while crews in Colorado built track segments that were transported to site. On July 4, 1983, at 3:05 p.m., safety inspectors declared the line ready for operation. At 3:12 p.m., the centralized traffic control signals gave a green light to the first train to pass through the Thistle area since the slide began, an eastbound freight train coming from the Southern Pacific Railroad at Ogden, destined for Herington, Kansas. Although the line's re-opening on Independence Day was coincidental, the first train became part of the local holiday celebrations. The first passenger train to use the new alignment was the California Zephyr, on July 16.[32]

Debates ensued over the fate of the Marysvale branch line. The mines at the end of the line had long closed; the last train to traverse the entire length of the line passed through in 1970. Still, farmers and industry in the Sevier and Sanpete Valleys had generated enough traffic that the line broke even most years. However, this line was severely damaged, with several washed-out bridges and railroad tracks draping over the sides of newly created cliffs. The railroad determined that at best it would take years to recover the cost of rebuilding the line.[36]

Map showing an area of Utah County circled and enlarged to the southeast of Utah Lake. The enlarged area shows an abandoned rail and highway grades to the west and south of replacement rail and highway grades.
Map of Utah County showing the pre- and post-landslide alignments of US-6, US-89, and the area railroads

The residents of Richfield pressured the Rio Grande to use the portion of the line that was still intact and build a connection to an existing Union Pacific line near Nephi, roughly parallel to State Route 28. However, the railroad determined with land acquisition, the cost would be comparable to rebuilding the old route. In addition, the Rio Grande would have to pay trackage rights to the Union Pacific for the connection from Nephi, which would further erode profits on a line that was barely profitable. In the end, the Rio Grande sold the line to a scrap dealer who dismantled it.[36] A 2002 study placed the cost of rebuilding the modified routing of the Marysvale branch line at $80 million (equivalent to $136 million in 2024).[35]

Highways

The new alignment of US-6 was opened on December 30, 1983. The dedication was planned for the next day, but lines of cars formed at the barricades as soon as news broke that the highway was complete. Some were residents anxious to see the area or visit relatives they had not seen since the slide; others were truckers frustrated by the long detours. The highway patrol requested the ceremony be canceled and the highway opened early, as they were unable to disperse the crowds. When the first traffic flowed crews had not finished some final tasks, such as painting stripes. Motorists saw a relocation with several mountain cuts built high up the canyon wall, with a view of the slide and former lake. The roadbed was not expected to last, due to the uncooperative weather when the asphalt was laid. Two mountain cuts were unstable, requiring several months of work before they could be left unattended. During this time, the state stationed two full-time watches at the cuts, who would close the road while falling rocks were cleared. The cut through Billies Mountain was described by the construction crews as a new, man-made mountain pass. The pending completion of the again rebuilt US-6, with properly laid asphalt and stable rock cuts, was announced in November 1984, 18 months after the closure of the original alignment.[37][38] Starting in 1993, the Utah Department of Transportation began discussions with former Thistle residents to build a memorial to the town.[39][40] The department maintains a view area overlooking the townsite along US-6.[41]

Geology and climate

The landslide area near Thistle is a paleovalley formed in a depression in an area of bedrock known as the Charleston–Nebo thrust plate. The rock in this plate dates from the Permian and Pennsylvanian to the Jurasic eras, but the plate appears to have formed elsewhere and moved to the modern Thistle area during the Late Cretaceous era. The layers of soil above the bedrock are younger, dating to the Cretaceous and Tertiary eras.[27] The soil in the landslide itself comes from the North Horn and Ankareh Formations.[3]

The area around Thistle has always been prone to landslides. Pre-historic landslides created the more gentle slopes that made the area usable as a transportation corridor across the Wasatch Mountains.[3][10] Minor landslides have been frequently observed, and continue to occur. The largest recorded landslides are the 1983 slide which destroyed the town, and a smaller one in 1998.[3]

The climate at downstream Spanish Fork is classified as arid with four distinct seasons.[42] Temperatures range from an average high of 92 °F (33 °C) in July and an average low of 20 °F (−7 °C) in January. Except for the spring months, precipitation averages less than 2 inches (5.1 cm) per month.[43]

See also

References

  1. ^ a b "Thistle". Geographic Names Information System. United States Geological Survey. Retrieved April 6, 2010.
  2. ^ "Zip Code Lookup". United States Postal Service. Retrieved March 11, 2010.
  3. ^ a b c d e f g Milligan, Mark (May, 2005). "Thistle Landslide Revisited, Utah County, Utah". Survey Notes. 37 (2). Utah Geological Survey. Retrieved October 28, 2009. {{cite journal}}: Check date values in: |date= (help)
  4. ^ a b "Frequently Asked Question – Landslides Hazard Program". United States Geological Survey. August 10, 2010. Retrieved November 12, 2010.
  5. ^ a b c Gore, Rick (June 1985). "The Rising Great Salt Lake–No Way to Run a Desert". National Geographic Magazine. 167 (6). National Geographic Society: 710.
  6. ^ a b Utah Road and Recreation Atlas (Map) (2002 ed.). 1:250000. Benchmark Maps. 2002. p. 51. § G12. ISBN 0-929591-74-7.
  7. ^ a b Sumsion, p. 3
  8. ^ UPRR Common Line Names (PDF) (Map). Union Pacific Railroad. Retrieved January 4, 2009.
  9. ^ "UP: Chronological History". Union Pacific Railroad. Retrieved September 21, 2010.
  10. ^ a b c d e f g Atwood, Genevieve. "Thistle". Utah History Encyclopedia. University of Utah Press. Retrieved October 28, 2009.
  11. ^ Sumsion, p. 98
  12. ^ Silvestre Vélez de Escalante (1995). Warner, Ted J. (ed.). The Domínguez – Escalante Journal: Their Expedition Through Colorado, Utah, Arizona and New Mexico in 1776. Salt Lake City, Utah: University of Utah Press. p. 64. ISBN 0874804477.
  13. ^ "Census of Population and Housing". U.S. Census Bureau. Retrieved March 10, 2010.
  14. ^ Sumsion, p. 99
  15. ^ Sumsion, pp. 94, 118
  16. ^ Sumsion, p. 5
  17. ^ a b Carr, p. 157
  18. ^ a b c Carr, p. 158
  19. ^ Sumsion, p. 93
  20. ^ Sumsion, pp. 13–15
  21. ^ Carr, p. 159
  22. ^ Sumsion, pp. 17–19
  23. ^ Sumsion, p. 23
  24. ^ Sumsion, p. 123
  25. ^ a b Polly, Ron (April 19, 1983). "Thistle's way of life washed away". Deseret News.
  26. ^ Sumsion, p. 52
  27. ^ a b Witkind, Irving J. (1986). "Potential Geologic Hazards Near the Thistle Landslide, Utah County, Utah". United States Geological Survey. Retrieved November 20, 2010.
  28. ^ "County seeks dismissal for Thistle residents' suit". Deseret News. May 13, 1987. p. B3. Retrieved March 10, 2010.
  29. ^ Rayburn, Ray (August 22, 1989). "Was Thistle Landslide Preventable?". Deseret News. p. B4.
  30. ^ "D&RGW Wasn't at Fault in Thistle Slide, Jury Rules". Deseret News. August 30, 1989.
  31. ^ "Thistle landowners win suit against railroad". Salt Lake Tribune. May 22, 1993. p. C3.
  32. ^ a b Sumsion, pp. 73–75
  33. ^ a b "1980–1989 Thistle Mud Slide". Utah Department of Public Safety. Retrieved March 10, 2010.
  34. ^ a b Schuster, Robert L. (2001). "Socioeconomic Impacts of Landslides in the Western Hemisphere". United States Geological Survey. Retrieved November 12, 2010. {{cite web}}: Unknown parameter |coauthors= ignored (|author= suggested) (help)
  35. ^ a b Ashland, Francis X. (2003). "The Feasibility of Collecting Accurate Landslide-Loss Data in Utah" (PDF). Utah Geological Survey. p. 17.
  36. ^ a b Carr, p. 161
  37. ^ Fackrell, Jerrie (January 1, 1984). "Eager travelers line up to cruise newly reopened road to Thistle". Deseret News.
  38. ^ Fackrell, Jerrie (November 6, 1984). "Crews have nearly finished U.S. 6 over Billies Mountain". Deseret News.
  39. ^ "Meeting Minutes – Utah Transportation Commission". Utah Department of Transportation. October 15, 1993. Retrieved April 6, 2010.
  40. ^ "Meeting Minutes – Utah Transportation Commission". Utah Department of Transportation. January 15, 1993. Retrieved April 6, 2010.
  41. ^ "Highway Reference Information" (PDF). Utah Department of Transportation. 2008. Retrieved April 6, 2010.
  42. ^ "Spanish Fork – About the City". City of Spanish Fork. Retrieved August 16, 2010.
  43. ^ "Monthly Averages for Spanish Fork, UT". The Weather Channel. Retrieved August 16, 2010.

Works cited

  • Carr, Stephen L. (1989). Utah Ghost Rails. Salt Lake City, Utah: Western Epics. ISBN 0914740342. {{cite book}}: Unknown parameter |coauthor= ignored (|author= suggested) (help)
  • Sumsion, Oneita Burnside (1983). Thistle – Focus on Disaster. Springville, Utah: Art City Publishing Company. ISBN 0936860146.