Tuhobić Tunnel
Tuhobić Tunnel (Croatian: Tunel Tuhobić) is one of the most significant structures on the Croatian A6 motorway route. As it is 2,143 metres (7,031 ft) long (southbound tube), Tuhobić Tunnel is the longest tunnel on the A6 motorway route. The tunnel is located at 700 metres (2,300 ft) above sea level, connecting Gorski Kotar and Croatian Littoral regions.[1] The tunnel is located between Vrata and Oštrovica interchanges.[2]
Tunnel excavation started in 1996, and the first tunnel tube opened in 1997, along with some sections of Rijeka–Zagreb motorway. Since the motorway was initially executed as a semi-motorway, the second tunnel tube was not excavated for a decade — its construction started August 2006, excavation was completed in August 2007, and the completed motorway, including the second Tuhobić Tunnel tube was opened on October 22, 2008.[1][3][4] The tunnel is tolled within the A6 motorway closed toll collection system. There are no other toll plazas related to use of the tunnel.[5][6]
Safety
European Tunnel Assessment Program (EuroTAP), a tunnel safety assessment program supported by the European Commission, coordinated by FIA and led by German motoring club ADAC, tested Tuhobić Tunnel twice — once in 2004, when it achieved poor results, and once again in 2009 after implementation of EuroTAP safety recommendations. Unlike the first inspection, in the 2009 test, the tunnel ranked the second safest in Europe.[7]
Traffic volume
Traffic is regularly counted and reported by Autocesta Rijeka–Zagreb, operator of the A6 motorway and the tunnel, and published by Hrvatske ceste.[8] Substantial variations between annual (AADT) and summer (ASDT) traffic volumes are attributed to the fact that the motorway carries substantial tourist traffic to Istria and Kvarner Gulf resorts. The traffic count is performed using analysis of toll ticket sales.
Tuhobić Tunnel traffic volume | ||||
Road | Counting site | AADT | ASDT | Notes |
A6 | 2915 Vrata west | 12,413 | 20,891 | Between Vrata and Oštrovica interchanges. |
See also
References
- ^ a b "Probijena druga cijev tunela Tuhobić" (in Croatian). Ministry of the Sea, Transport and Infrastructure. August 9, 2007. Retrieved October 8, 2010.
{{cite web}}
: Unknown parameter|trans_title=
ignored (|trans-title=
suggested) (help) - ^ Croatian Motorways (PDF). Hrvatske autoceste. 2007. pp. 362–363. ISBN 978-953-7491-09-3. Retrieved September 5, 2010.
- ^ Branko Nadilo (August 11, 2003). "Posljednje dionice na autocesti Rijeka - Zagreb" (PDF). Građevinar (in Croatian). Retrieved October 8, 2010.
{{cite news}}
: Unknown parameter|trans_title=
ignored (|trans-title=
suggested) (help) - ^ "Otvoren puni profil autoceste Rijeka-Zagreb" (in Croatian). Ministry of Sea, Transport and Infrastructure. October 22, 2008. Retrieved October 7, 2010.
{{cite web}}
: Unknown parameter|trans_title=
ignored (|trans-title=
suggested) (help) - ^ Damir Herceg (August 10, 2007). "Tunel Tuhobić probijen dva mjeseca prije roka" (PDF). Vjesnik (in Croatian). Retrieved October 7, 2010.
{{cite news}}
: Unknown parameter|trans_title=
ignored (|trans-title=
suggested) (help) - ^ "Autocesta A6, Rijeka-Zagreb otvorena i puštena u promet u punom profilu" (PDF) (in Croatian). HUKA. November 1, 2008. Retrieved October 7, 2010.
{{cite web}}
: Unknown parameter|trans_title=
ignored (|trans-title=
suggested) (help) - ^ "EuroTAP testiranje tunela: Sveti Rok dio europske elite". Hrvatski Autoklub. July 15, 2010. Retrieved June 8, 2010.
{{cite web}}
: Unknown parameter|trans_title=
ignored (|trans-title=
suggested) (help) - ^ "Traffic counting on the roadways of Croatia in 2009 - digest" (PDF). Hrvatske Ceste. May 1, 2010.