Ceres Project
Map
CountryAustralia
LocationYork Peninsula
Coordinates34°39′11″S 137°47′31″E / 34.65306°S 137.79194°E / -34.65306; 137.79194
StatusUnder Construction
Construction cost1.6 Billion AUD
OwnerSenvion
Wind farm
TypeOnshore
Hub height140 metres (459 ft)
Rotor diameter160 metres (525 ft)
Site area~18,000 hectares (180 km2)
Power generation
Nameplate capacity600 MW
External links
Websitehttp://www.theceresproject.com.au

The Ceres Project is a wind farm under construction on the York Peninsula, in South Australia. The project includes approximately 600 MW of wind turbine generational capacity, as well as a high-voltage direct current (HVDC) transmission line to Adelaide, under Gulf St Vincent, comprising of two 300 MW connections (74 km of marine and terrestrial cable)[1].

Category:Wind farms in South Australia Category:Proposed renewable energy power stations in Australia The application for the project was initially submitted to the state government in the third quarter of 2012[1], and was approved on the 10th of February, 2014[2]. A revised application was submitted to the regulator in 2017, with minor amendments "to allow the utilisation of the most modern wind turbine technology"[3], increasing the maximum tip height to 220 metres, an increase in the maximum rotor diameter to 160 metres, a reduction in the total number of turbines (from 187 to 170, based on increases in the efficiency of turbine technology), and a capping of the output (at 630 MW)[4]. The revised plan was approved by the department on the 9th of April, 2018[5].

References

[edit]
  1. ^ a b "Senvion – Ceres Wind Farm 600 MW – South Australia - Project Profile". www.marketresearch.com. Retrieved 2021-09-12.
  2. ^ "Decision Notification Form for Crown Development and Public Infrastructure 544/V001/13" (PDF). Department of Planning Transport and Infrastructure. 10 February 2014. Retrieved 12 September 2021.{{cite web}}: CS1 maint: url-status (link)
  3. ^ "Development Approval | Ceres Project". www.theceresproject.com.au. Retrieved 2021-09-12.
  4. ^ "The Ceres Project Update" (PDF). The Ceres Project. August 2019. Retrieved 12 September 2021.{{cite web}}: CS1 maint: url-status (link)
  5. ^ "DECISION NOTIFICATION FORM CROWN DEVELOPMENT AND PUBLIC INFRASTRUCTURE (544/V001/13 V2)" (PDF). Department of Planning Transport and Infrastructure. 9 April 2018. Retrieved 12 September 2021.{{cite web}}: CS1 maint: url-status (link)
[edit]

Further Reading

[edit]