Xilin MRT station

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Morrisonjohn022 (talk | contribs) at 06:28, 20 April 2018. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

 DT36 
Xilin
锡林
சீலின்
Rapid transit
General information
Owned byLand Transport Authority
Operated bySBS Transit DTL
Line(s)
PlatformsIsland
Tracks2
Construction
Structure typeUnderground
Depth25m
Platform levels2
ParkingYes
Bicycle facilitiesYes
AccessibleYes
Other information
Station code DT36 
History
Opening2024; 0 years ago (2024)
Services
Preceding station   Mass Rapid Transit   Following station
Template:SMRT lines

Xilin MRT station (DT36) is an underground Mass Rapid Transit station on the Downtown Line in Tampines planning area, Singapore.[1]

The station is located at the junction of Xilin Avenue, Changi South Avenue 3 and Laguna Golf Green.

History

The extension to the Downtown MRT Line was first announced during the revealing of the Land Transport Master Plan 2013 on 17 January 2013. The line will be extended to what was known as the Eastern Region Line (presently the Thomson-East Coast MRT Line) by 2025, so as to enhance the accessibility between the two rail lines and allow commuters to conveniently make transfers.[2]

This station was first announced on 15 August 2014 [3] and is targeted for completion in 2024, a year earlier than initially scheduled.[4]

To facilitate the construction for the Downtown Line 3 Extension Xilin station and tunnels, part of Changi South Avenue 3 between Xilin Avenue and Changi South Avenue 2 will be temporarily closed to traffic from 31 January 2017 until the end of construction in 2024.[5]

Station layout

L1 Street Level Xilin Districentre, Tangs Logistics Centre
B1 Concourse Faregates, Ticketing Machines, Station Control, Transitlink Counter
B2 Platform B Template:SMRT lines towards  DT37  TE31  Template:SMRT stations
Island platform
Platform A Template:SMRT lines (future service) towards  DT1  Bukit Panjang via  DT35  CG1  Template:SMRT stations

Transport connections - Rail

Destination First Train Last Train
Mon – Sat Sunday &
Public Holiday
Daily
colspan="7" style="background-color:#Template:SMRT color;color:white; height:25px" | Downtown Line
to DT1 Bukit Panjang
to DT37 Sungei Bedok

References

  1. ^ "Stages of Thomson-East Coast Line". Land Transport Authority. 15 August 2014.
  2. ^ "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030". Land Transport Authority. 17 January 2013.
  3. ^ "Joint News Release by the Land Transport Authority & Singapore Land Authority - Thomson-East Coast Line: New MRT Links In The East". Land Transport Authority. 15 August 2014. Archived from the original on 19 August 2014. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  4. ^ Lim, Adrian. "Korea-based firm to build 4-in-1 bus and rail depot". The Straits Times. Retrieved 2016-03-22.
  5. ^ "ROAD CLOSURE BETWEEN XILIN AVENUE AND CHANGI SOUTH AVENUE 2". Land Transport Authority. 25 January 2017.

External links

Template:Downtown MRT Line navbox