Xilin MRT station
DT36
Xilin 锡林 சீலின் | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
General information | |||||||||||
Owned by | Land Transport Authority | ||||||||||
Operated by | SBS Transit DTL | ||||||||||
Line(s) | |||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Depth | 25m | ||||||||||
Platform levels | 2 | ||||||||||
Parking | Yes | ||||||||||
Bicycle facilities | Yes | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | DT36 | ||||||||||
History | |||||||||||
Opening | 2024 | ||||||||||
Services | |||||||||||
|
Xilin MRT station (DT36) is an underground Mass Rapid Transit station on the Downtown Line in Tampines planning area, Singapore.[1]
The station is located at the junction of Xilin Avenue, Changi South Avenue 3 and Laguna Golf Green.
History
The extension to the Downtown MRT Line was first announced during the revealing of the Land Transport Master Plan 2013 on 17 January 2013. The line will be extended to what was known as the Eastern Region Line (presently the Thomson-East Coast MRT Line) by 2025, so as to enhance the accessibility between the two rail lines and allow commuters to conveniently make transfers.[2]
This station was first announced on 15 August 2014 [3] and is targeted for completion in 2024, a year earlier than initially scheduled.[4]
To facilitate the construction for the Downtown Line 3 Extension Xilin station and tunnels, part of Changi South Avenue 3 between Xilin Avenue and Changi South Avenue 2 will be temporarily closed to traffic from 31 January 2017 until the end of construction in 2024.[5]
Station layout
L1 | Street Level | Xilin Districentre, Tangs Logistics Centre |
B1 | Concourse | Faregates, Ticketing Machines, Station Control, Transitlink Counter |
B2 | Platform B | Template:SMRT lines towards DT37 TE31 Template:SMRT stations → |
Island platform | ||
Platform A | Template:SMRT lines (future service) towards DT1 Bukit Panjang via DT35 CG1 Template:SMRT stations ← |
Transport connections - Rail
Destination | First Train | Last Train | |||
---|---|---|---|---|---|
Mon – Sat | Sunday & Public Holiday |
Daily | |||
colspan="7" style="background-color:#Template:SMRT color;color:white; height:25px" | Downtown Line | |||||
to DT1 Bukit Panjang | – | – | – | ||
to DT37 Sungei Bedok | – | – | – |
References
- ^ "Stages of Thomson-East Coast Line". Land Transport Authority. 15 August 2014.
- ^ "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030". Land Transport Authority. 17 January 2013.
- ^ "Joint News Release by the Land Transport Authority & Singapore Land Authority - Thomson-East Coast Line: New MRT Links In The East". Land Transport Authority. 15 August 2014. Archived from the original on 19 August 2014.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help) - ^ Lim, Adrian. "Korea-based firm to build 4-in-1 bus and rail depot". The Straits Times. Retrieved 2016-03-22.
- ^ "ROAD CLOSURE BETWEEN XILIN AVENUE AND CHANGI SOUTH AVENUE 2". Land Transport Authority. 25 January 2017.
External links
Template:Downtown MRT Line navbox