[[Image:Inga 2006.svg|thumb|right|Inga dam projects, as of 2006.]]
[[Image:Inga 2006-projet.svg|thumb|right|Official projections for Inga III and Grand Inga, as of 2006.]]
The '''Inga Dams''' are two [[hydroelectric]] dams connected to one of the largest waterfalls in the world, [[Inga Falls]]. They are located in the western [[Democratic Republic of the Congo]] and 140&nbsp;miles southwest of [[Kinshasa]]. The [[Congo River]] drops {{convert|96|m}}.<ref>{{cite web |url=http://fizzyenergy.com/the-world-tallest-and-largest-waterfalls/ |title=The world tallest and largest waterfalls |publisher=Fizzyenergy.com |date=2009-09-23 |accessdate=2015-02-20 |archive-url=https://web.archive.org/web/20150119192402/http://fizzyenergy.com/the-world-tallest-and-largest-waterfalls/ |archive-date=19 January 2015 |url-status=live }}</ref>
The '''Inga Dams''' are two [[hydroelectric]] dams connected to one of the largest waterfalls in the world, [[Inga Falls]]. They are located in the western [[Democratic Republic of the Congo]] and 140&nbsp;miles southwest of [[Kinshasa]]. The [[Congo River]] drops {{convert|96|m}}.<ref>{{cite web |url=http://fizzyenergy.com/the-world-tallest-and-largest-waterfalls/ |title=The world tallest and largest waterfalls |publisher=Fizzyenergy.com |date=2009-09-23 |accessdate=2015-02-20 |archive-url=https://web.archive.org/web/20150119192402/http://fizzyenergy.com/the-world-tallest-and-largest-waterfalls/ |archive-date=19 January 2015 |url-status=live }}</ref>


==History==
==History==
The Belgian colonial government was considering starting what it called "The Inga Scheme" on the eve of decolonization in 1959.<ref>{{cite news |title=Economic Problems of the Congo|author= Louis Ameye|publisher=Royal African Society |date=4 June 1959}}</ref> Inga I was completed in 1972, and Inga II in 1982.<ref>{{cite web |url=http://www.internationalpolicydigest.org/2013/06/29/will-congo-benefit-from-grand-inga-dam/ |title=Will Congo Benefit from Grand Inga Dam? |author=RUDO SANYANGA |publisher=International Policy Digest |accessdate=29 June 2013 |archive-url=https://web.archive.org/web/20140404043624/http://www.internationalpolicydigest.org/2013/06/29/will-congo-benefit-from-grand-inga-dam/ |archive-date=4 April 2014 |url-status=live }}</ref>
The Belgian colonial government was considering starting what it called "The Inga Scheme" on the eve of decolonization in 1959.<ref>{{cite news |title=Economic Problems of the Congo|author= Louis Ameye|publisher=Royal African Society |date=4 June 1959}}</ref> Inga I was completed in 1972, and Inga II in 1982.<ref>{{cite web |url=http://www.internationalpolicydigest.org/2013/06/29/will-congo-benefit-from-grand-inga-dam/ |title=Will Congo Benefit from Grand Inga Dam? |author=RUDO SANYANGA |publisher=International Policy Digest |accessdate=29 June 2013 |archive-url=https://web.archive.org/web/20140404043624/http://www.internationalpolicydigest.org/2013/06/29/will-congo-benefit-from-grand-inga-dam/ |archive-date=4 April 2014 |url-status=live }}</ref>

=== Early study ===
[[File:Inga-matadi.jpg|link=https://en.wikipedia.org/wiki/File:Inga-matadi.jpg|right|thumb|356x356px|1890s map of the Inga Falls]]
The hydropower potential of the Congo River was recognized quite early on, at a time when [[Imperialism|colonial control]] was [[Scramble for Africa|expanding over Africa]] and rivers were first being harnessed to generate electricity. One early report on this potential came via the [[United States Geological Survey]] in 1921; their findings concluded that the [[Congo basin]] in its entirety possessed "more than one-fourth of the world’s potential water power". Regarding the Inga Falls location specifically, this was highlighted just four years later by the Belgian soldier, mathematician, and entrepreneur Colonel [[Van Deuren]]. He would continue survey work around Inga Falls, and during the 1920s and 1930s there was some movement towards further study of the area’s potential by the group Syneba (1929–1939), yet the outbreak of [[World War II]] and the dissolution of Syneba put a temporary end to progress on the site.<ref name="Showers">{{cite journal|last=Showers|first=Kate B.|year=2009|title=Congo River's Grand Inga hydroelectricity scheme: linking environmental history, policy and impact|journal=Water History|volume=1|issue=1|pages=31–58|doi=10.1007/s12685-009-0001-8}}</ref>

[[Atlantropa]], a scheme for integrating Europe and Africa conceived by [[Herman Sörgel|Herman Sorgel]] in the 1920s, included a proposal to dam the Congo River. In this plan, the water would have been used to irrigate the deserts of North Africa, and to generate 22.5 to 45 gigawatts of power.<ref>{{Cite journal|last=Lehmann|first=Philipp Nicolas|date=2016-02-01|title=Infinite Power to Change the World: Hydroelectricity and Engineered Climate Change in the Atlantropa Project|journal=The American Historical Review|language=en|volume=121|issue=1|pages=70–100|doi=10.1093/ahr/121.1.70|issn=0002-8762}}</ref>

=== Belgian plan ===
Despite the lack of progress during and in the immediate aftermath of the Second World War, the tantalizing possibilities offered by the Inga Falls remained prominent in engineers’ minds. The 1954 book ''Engineers’ Dreams'' listed a host of massive projects that could theoretically be accomplished (among them the future [[Channel Tunnel]]), the largest being an Inga Dam that would create a lake stretching into the [[Sahara Desert]].<ref>{{cite magazine|author=Leonard, Jonathan N.|date=May 30, 1954|title=New Sources of Power|magazine=The New York Times Book Review|page=14}}</ref>

Before Congolese independence, the Belgians still harbored the hope of constructing a massive Inga development project to generate electricity for heavy industry.<ref>{{cite news|title=Economy Gaining in Belgian Congo|date=September 28, 1957|newspaper=The New York Times|page=27}}</ref> Among those industries discussed were "aluminum, ferro-alloys, the treatment of ores, paper, and a plant for the separation of isotopes."<ref name="Pop">{{cite journal|author=Holz, Peter|date=March 1958|title=More Power Lights "Darkest Africa"|url=https://books.google.com/?id=5t0DAAAAMBAJ&dq=More+Power+Lights+%E2%80%9CDarkest+Africa%E2%80%9D|journal=Popular Mechanics|volume=109|issue=3|page=232}}</ref> Their vision, at least publicly, was bold, with one authority comparing the potential industrial development in the Congo to the [[Germany|German]] [[Ruhr]].<ref name="Pop" /> There was an important American connection the project in the form of [[Clarence E. Blee]], one of five foreigners on a 10-person study of the Inga site in 1957 and the chief engineer of the United States’ foray into federal electrical and industrial development, the [[Tennessee Valley Authority]].<ref name="Pop" /> This study would play a central role in convincing the Belgian authorities to set an Inga dam in motion.

An Inga scheme, loosely reported as consisting of a "series of power stations and dams", was finally passed by the Belgian Cabinet on November 13, 1957, and a group was slated to be created in order to study the possible uses of the project’s electricity and the ways in which to fund it. The Cabinet’s plan was estimated at the time to cost [[US$]]3.16 billion and was expected to generate 25,000 MW.<ref>{{cite news|title=Congo Plan Approved|date=November 14, 1957|newspaper=The New York Times|page=18}}</ref>

A report from late April 1958 stated that excavation work would hopefully begin by midyear, with 1964/1965 as the year set to bring the initial stage to completion. Plans called for three stages of construction, beginning with a 1,500 MW plant with a $320 million price tag, then twice that capacity, and eventually the 25,000 MW originally approved. Industrial development would advance in step, helped by a start price of $0.002 per kwh, producing 500,000 tons of aluminum with the construction of the first plant and eventually aiming for a final production goal six times that. An international syndicate named Aluminga, comprising a number of European and North American firms, was already organizing to realize this. Funding was an issue, especially once the Belgians realized that they could not accomplish such a project alone. Possible investors cited by the press included the [[International Bank for Reconstruction and Development]] and the [[European Investment Bank]].<ref>{{cite news|title=Belgium Rushes Huge Power Project on the Congo|author=Waggoner, Walter H.|date=April 26, 1958|newspaper=The New York Times|page=24}}</ref>

In February 1959 a group of prominent American investors including [[David Rockefeller]] visited the Inga Falls,<ref>{{cite news|title=U.S. Bankers View Project in Congo|author=Bracker, Milton|date=February 11, 1959|newspaper=The New York Times}}</ref> though construction was continually being pushed back from original estimates, then slated for 1961 or later.<ref>{{cite news|title=Belgian Congo Plant Delayed|date=April 7, 1959|newspaper=The New York Times}}</ref>

Congolese independence from Belgium did not suddenly erase the importance of Inga development. Belgian authorities were still pushing the project while negotiating independence with Congolese delegates, with Minister [[Raymond Scheyven]] proposing a joint Congolese-Belgian company that would fund an Inga dam. This was not a minor idea, but the main project in a five-year Congolese development plan he proposed.<ref>{{cite news|title=Congo Cautioned On Its Economy|author=Gilroy, Harry|date=February 17, 1960|newspaper=The New York Times}}</ref> That advice was apparently not heeded, as newly elected Prime Minister [[Patrice Lumumba]] signed a fifty-year contract with the Wall Street-based Congo International Management Corporation to develop the Congo on July 22, 1960, with an Inga project and associated aluminum production at the top of the list.<ref>{{cite news|title=Congo Signs Pact With U.S. Concern To Tap Resources|author=Tanner, Henry|date=July 23, 1960|newspaper=The New York Times}}</ref> PM Lumumba later backtracked and claimed that the deal was "only an agreement in principle",<ref>{{cite magazine|date=August 8, 1960|title=CONGO: Where's the War?|url=http://www.time.com/time/magazine/article/0,9171,869737,00.html|magazine=TIME|accessdate=November 19, 2009}}</ref> but regardless he was deposed by Army Chief of Staff [[Mobutu Sese Seko]] less than two months later.

=== Inga I and Inga II ===
[[File:Inga003.jpg|link=https://en.wikipedia.org/wiki/File:Inga003.jpg|right|thumb|200x200px|Inga I facility]]
Despite the ensuing [[Congo Crisis|period of instability]], rebellions, and UN interventions in the first half of the 1960s, it did not dampen leaders' hopes to harness the rapids of the Congo River. From the wreckage of the Belgian departure and the subsequent turmoil emerged Mobutu Sésé Seko, who seized full power for himself in November 1965 and would remain the Congo’s authoritarian president until May 1997. It was during his reign that the first and so far only projects were built to generate power from the Inga Falls.

Inga I was the first project brought to completion. A feasibility study was conducted by the Italian firm SICAI in 1963, which recommended the dam support domestic industrialization as opposed to export focused industry.<ref>{{cite book|url=https://archive.org/details/risedeclineofzai0000youn|title=The Rise and Decline of the Zairian State|author=Young, Crawford|author2=Turner, Thomas|publisher=The University of Wisconsin Press|year=1985|place=Madison|pages=[https://archive.org/details/risedeclineofzai0000youn/page/298 298–301]|url-access=registration}}</ref> Funded mainly by the government, construction took place from 1968 to 1972, leaving a six-turbine plant generating 351 MW.<ref name="IntRivers">{{cite web|url=http://www.internationalrivers.org/en/node/2877|title=Inga 1 and Inga 2 dams|publisher=International Rivers|accessdate=November 19, 2009}}</ref> This electricity was mainly fed to the populated areas around it and downstream; its successor was explicitly for mining activity in the south.

Inga II was the second hydro project built at the site just south of Inga I. Even with just eight turbines, it was built to produce 1,424 MW, and was completed a full decade after Inga I.<ref name="IntRivers" />

=== Inga-Shaba power line ===
{{main|Inga-Shaba}}
In order to connect the power generating capacity at Inga with the [[Copper extraction techniques|copper]] and [[cobalt]] mines located near the [[Zambia|Zambian]] border in [[Shaba Province]] (now Katanga), a new project aimed to build the longest [[high-voltage direct current]] power line in existence, bypassing local communities and converting into [[alternating current]] at its final destination. The various groups involved had economic as well as political agendas; while Western investors and the Congolese government wished to support the Shaba mines during a period of elevated copper prices, the government also wanted to consolidate its power over the secessionist southern province, and the West had an interest in seeing the Congo stay firmly in the anti-communist camp. The cost for the project was constantly revised upward, eventually reaching $500 million over budget. A mix of private and public groups provided the financing, notably [[Citibank]], [[Manufacturers Hanover Trust]], and the [[U.S. Export-Import Bank]], and it was the storied [[Boise, Idaho]]-based company, [[Morrison-Knudsen]], that was contracted to do the work.<ref>{{cite news|title=Mobuto Riding High, But Possibility Raised of Guerilla Warfare|last=Randa|first=Jonathan C.|date=April 28, 1977|newspaper=The Washington Post|page=A26}}</ref><ref name="TaleofTwo">{{cite news|title=A Tale of Two Projects: One Winner, One Loser|last=Ross|first=Jay|date=April 25, 1982|newspaper=The Washington Post|page=C5}}</ref>

In 1980, the costs of the Inga-Shaba power line totaled 24% of Congo’s debt, which along with corruption, other wasteful spending, and bad decision-making, led to a debt crisis and the intervention of foreign experts.<ref>{{cite news|title=Mobutu Mortgages Nation's Future|last=Dash|first=Leon|date=January 1, 1980|newspaper=The Washington Post|page=A1}}</ref> As of 1999, Congo still owed the U.S. Export-Import Bank over $900 million, leaving American taxpayers unpaid.<ref>{{cite news|title=Abroad at Home: The Foreign Affairs Community – Ex-Im Bank Aims to Do More in Africa|last=Mufson|first=Steven|date=December 16, 1999|newspaper=The Washington Post|page=A37}}</ref> As the Inga-Shaba line neared completion in the early 1980s, many news articles poured scorn on the project. One from the ''[[Washington Post]]'' juxtaposed its failure with a successful [[Peace Corps]] project to improve the Congolese diet, noting that, "the grandiose project has so far turned out to be a white elephant, while the low-key fish-farming endeavor has already made visible improvements in the lives of several thousand people in a similar period of time."<ref name="TaleofTwo" /> [[Gécamines]], the state-owned mining company in Shaba that was founded in 1906 by the Belgians, ended up still mainly using hydroelectricity supplied locally, and thus the Inga-Shaba line found itself being used at a mere third of capacity. Furthermore, the structure itself has been degraded as local peoples have used its metal bars for a variety of domestic needs.<ref>{{cite book|url=https://archive.org/details/eastalongequator00wint|title=East Along the Equator: A Journey Up the Congo and into Zaire|author=Winternitz, Helen|publisher=Atlantic Monthly Press|year=1987|place=New York|page=[https://archive.org/details/eastalongequator00wint/page/175 175]|url-access=registration}}</ref>


==Current dams==
==Current dams==
[[Image:Inga 2006.svg|thumb|right|Inga dam projects, as of 2006.]]
{{further|History of the Inga Dams}}
The two hydroelectric dams, Inga I and Inga II, currently operate at a low output. Inga I has a total installed capacity of 351 [[Watt#Megawatt|MW]] and Inga II has 1424 MW.<ref>{{cite web|url=http://www.internationalrivers.org/africa/grand-inga-dam-dr-congo/inga-1-and-inga-2-dams|title=Inga 1 and Inga 2 dams|website=International Rivers|publisher=International Rivers|accessdate=2 January 2015|archive-url=https://web.archive.org/web/20120307172717/http://www.internationalrivers.org/africa/grand-inga-dam-dr-congo/inga-1-and-inga-2-dams|archive-date=7 March 2012|url-status=live}}</ref> They were built under former president [[Mobutu Sese Seko]] as part of the [[Inga–Shaba]] project.
The two hydroelectric dams, Inga I and Inga II, currently operate at a low output. Inga I has a total installed capacity of 351 [[Watt#Megawatt|MW]] and Inga II has 1424 MW.<ref>{{cite web|url=http://www.internationalrivers.org/africa/grand-inga-dam-dr-congo/inga-1-and-inga-2-dams|title=Inga 1 and Inga 2 dams|website=International Rivers|publisher=International Rivers|accessdate=2 January 2015|archive-url=https://web.archive.org/web/20120307172717/http://www.internationalrivers.org/africa/grand-inga-dam-dr-congo/inga-1-and-inga-2-dams|archive-date=7 March 2012|url-status=live}}</ref> They were built under former president [[Mobutu Sese Seko]] as part of the [[Inga–Shaba]] project.

=== Rehabilitation ===
The DRC has faced the problem of rehabilitating the two existing dams, which have fallen into disrepair and operate far below original capacity at roughly 40%, or just over 700 MW combined.<ref name="IntRivers2">{{cite web|url=http://www.internationalrivers.org/en/node/2877|title=Inga 1 and Inga 2 dams|publisher=International Rivers|accessdate=November 19, 2009}}</ref> In May 2001 Siemens was reportedly negotiating with the government over a billion-dollar partnership that would involve restoration and modernization of the DRC’s electrical grid, including the rehabilitation of the two existing Inga power plants,<ref>{{cite news|title=Siemens Plans to Invest $1 billion in RDC Electronics Network|date=May 24, 2001|publisher=European Report}}</ref> though work was delayed.<ref>{{cite news|title=Grand Schemes on the Congo|date=February 3, 2004|publisher=IT Week}}</ref> In mid-2003 there was also a report that the [[World Bank]] had signed a $450 million contract with [[Siemens]] to improve water and electrical distribution in the DRC, including rehabilitation of the two Inga projects (reported at the time to be at 30% capacity) and a second electrical line from Inga to the capital.<ref>{{cite news|title=Siemens flags off massive DRC project|last=Misser|first=Francois|date=June 1, 2003|publisher=African Business}}</ref> It is unclear what transpired concerning these contracts.

Separately in May 2005 the Canadian company [[MagEnergy]] signed an agreement with SNEL to rehabilitate some of Inga II’s turbines, with a completion goal of 2009.<ref>{{cite news|title=MagEnergy Concludes Inga II Rehabilitation Agreement|date=May 31, 2005|publisher=Marketwire}}</ref> Actual work to rehabilitate Inga II finally began April 27, 2006, just under a year after the initial agreement with MagEnergy was signed.<ref>{{cite news|title=MagEnergy Announces Start of Inga II Hydroelectric Plant Work Program|date=May 1, 2006|publisher=Marketwire}}</ref> This first phase, which involved fixing a single 168 MW turbine and other emergency repair work, was reported 90% complete in April 2009, and the second phase (four other turbines) was estimated to take five additional years.<ref>{{cite news|url=http://www.hydroworld.com/index/display/article-display/5902182322/articles/hrhrw/hydroindustrynews/rehabilitationandrepair/MagEnergy_nears_completion_of_unit_rehab_at_DR_Congos_1424-MW_Inga_2.html|title=MagEnergy nears completion of unit rehab at DR Congo's 1,424-MW Inga 2|date=April 20, 2009|accessdate=November 22, 2009|publisher=Hydroworld.com}}</ref> However, there is doubt over whether the government accepts the validity of the contract, and in the meantime the Canadian company [[First Quantum]] was hired to rehabilitate two separate Inga II turbines.<ref>{{cite news|title=Everyone Plugs Into Inga|date=February 11, 2009|publisher=Africa Energy Intelligence}}</ref> To carry out the repairs, the SNEL has received funding from the Regional and Domestic Power Markets Development Project, which is itself supported by the World Bank, [[African Development Bank]], and European Investment Bank.<ref name="IntRivers2" />


==Expansion plans==
==Expansion plans==
[[Image:Inga 2006-projet.svg|thumb|right|Official projections for Inga III and Grand Inga, as of 2006.]]
There are expansion plans to create a third Inga dam, Inga III. Projections indicate that once completed, Inga III would generate 4,500 [[watt#megawatt|MW]] of electricity. Inga III is the centerpiece of the [[Western Power Corridor|Westcor]] partnership which envisions the interconnection of the electric grids of the [[Democratic Republic of the Congo]] (DRC), [[Namibia]], [[Angola]], [[Botswana]], and [[South Africa]]. The [[World Bank]], the [[African Development Bank]], the [[European Investment Bank]], bilateral donors, and the southern African power companies, have all expressed interest in pursuing the project which is estimated to cost US$80&nbsp;billion.
There are expansion plans to create a third Inga dam, Inga III. Projections indicate that once completed, Inga III would generate 4,500 [[watt#megawatt|MW]] of electricity. Inga III is the centerpiece of the [[Western Power Corridor|Westcor]] partnership which envisions the interconnection of the electric grids of the [[Democratic Republic of the Congo]] (DRC), [[Namibia]], [[Angola]], [[Botswana]], and [[South Africa]]. The [[World Bank]], the [[African Development Bank]], the [[European Investment Bank]], bilateral donors, and the southern African power companies, have all expressed interest in pursuing the project which is estimated to cost US$80&nbsp;billion.


One enthusiastic backer of Inga development has been [[South Africa]]. In July 1999, newly elected South African President [[Thabo Mbeki]] gave a speech to the [[Organisation of African Unity]], highlighting development of the Inga Falls for hydropower as an example of necessary development of Africa’s economic infrastructure.<ref>{{cite news|url=https://www.independent.co.uk/arts-entertainment/podium-the-globalisation-of-africa-1107512.html|title=Podium: The globalization of Africa|last=Mbeki|first=Thabo|date=July 20, 1999|newspaper=The Independent|accessdate=November 17, 2009|location=London}}</ref> For South Africa’s public utility [[Eskom]], Inga fit into a broader plan to turn an interconnected African grid into an electricity-exporting powerhouse, eventually supplying Europe and the Middle East.<ref>{{cite news|url=http://news.bbc.co.uk/2/hi/business/2307057.stm|title=Africa's grand power exporting plans|last=Hale|first=Briony|date=October 17, 2002|work=BBC News|accessdate=November 17, 2009}}</ref> In 2002 Inga was highlighted by the AU’s [[New Partnership for Africa's Development]] (NEPAD)<ref>{{cite news|title=Hard Talk, Charm Carries the Day for NEPAD|date=June 13, 2002|work=All Africa}}</ref> and Eskom was reported to be investigating a $6 billion run-of-the-river type Inga project which would be developed by an Eskom and [[Hydro-Québec]]-led consortium of national utility companies.<ref>{{cite news|title=Eskom's Secret Project|date=May 19, 2002|publisher=Africa Energy Intelligence}}</ref>

Such a consortium, dubbed the [[Western Power Corridor]] (Westcor) was finally organized in February 2003. Involving five of the region’s major utility companies (Eskom, SNEL, Angola’s [[Empresa Nacional de Electricidade]], Namibia’s [[NamPower]], and the [[Botswana Power Corporation]]) it projected initial costs at $1.5 billion and the eventual construction of a 44,000 MW run-of-the-river project.<ref>{{cite news|title=Pan African Consortium for Inga|date=February 19, 2003|publisher=Africa Energy Intelligence}}</ref> A memorandum of understanding for Westcor was finally signed on October 22, 2004, for the construction of a 3,400 MW Inga III.<ref>{{cite news|title=Africa plans new Congo generator, seeks investment|author=Thomson, Alistair|date=October 22, 2004|work=Reuters}}</ref> The following February Eskom unveiled a new $50 billion run-of-the-river scheme.<ref>{{cite news|url=https://www.theguardian.com/world/2005/feb/25/congo.jeevanvasagar|title=Could a $50bn plan to tame this mighty river bring electricity to all of Africa?|author=Vasagar, Jeevan|date=February 25, 2005|newspaper=The Guardian|accessdate=November 17, 2009|location=London}}</ref> That September 2005 a shareholder agreement for Westcor was signed, giving each party 20%.<ref>{{cite news|title=Landmark Agreement to Satisfy Regional Power Needs|date=September 8, 2005|work=All Africa}}</ref>

The DRC appeared to move away from the regional development approach offered by Westcor and instead manage the construction of Inga III on its own. In June 2009 it opened bidding for a $7 billion, 4320 MW Inga III project.<ref>{{cite news|url=http://in.reuters.com/article/fundsNews/idINLJ8022720090619|title=Congo opens bidding for Inga 3 hydro dam investors|date=June 19, 2009|work=Reuters|accessdate=November 17, 2009}}</ref> Snubbing Westcor, the DRC chose [[BHP Billiton]], which intended to use 2,000 MW for itself, notably for an [[aluminum smelter]].

=== Grand Inga ===
The [[Grand Inga Dam]] would generate 39,000 MW{{spaced ndash}}and would significantly boost the energy available to the African continent at a cost of $80&nbsp;billion. Connecting Inga to a continent-wide electricity grid for main population centers would cost $10&nbsp;billion more (est. 2000), and would be the world's largest hydroelectric project. Critics contend the huge amounts of money required for the project would be better spent with smaller scale, localized energy projects that would better meet the needs of Africa's poor majority. A study from Oxford University supports this cautious approach by showing that the average cost overrun for 245 large dams in 65 countries across six continents is 96% in real terms.<ref>{{cite web|ssrn=2406852 |title=Should We Build More Large Dams? The Actual Costs of Hydropower Megaproject Development by Atif Ansar, Bent Flyvbjerg, Alexander Budzier, Daniel Lunn :: SSRN |publisher=Papers.ssrn.com |date= }}</ref>
The [[Grand Inga Dam]] would generate 39,000 MW{{spaced ndash}}and would significantly boost the energy available to the African continent at a cost of $80&nbsp;billion. Connecting Inga to a continent-wide electricity grid for main population centers would cost $10&nbsp;billion more (est. 2000), and would be the world's largest hydroelectric project. Critics contend the huge amounts of money required for the project would be better spent with smaller scale, localized energy projects that would better meet the needs of Africa's poor majority. A study from Oxford University supports this cautious approach by showing that the average cost overrun for 245 large dams in 65 countries across six continents is 96% in real terms.<ref>{{cite web|ssrn=2406852 |title=Should We Build More Large Dams? The Actual Costs of Hydropower Megaproject Development by Atif Ansar, Bent Flyvbjerg, Alexander Budzier, Daniel Lunn :: SSRN |publisher=Papers.ssrn.com |date= }}</ref>



Revision as of 06:27, 31 January 2020

Inga Dams
Inga I dam, with the feeding canal for Inga II in the foreground.
Inga dams is located in Democratic Republic of the Congo
Inga dams
Location of Inga Dams in Democratic Republic of the Congo
CountryDemocratic Republic of the Congo
Coordinates5°31′09″S 13°37′19″E / 5.51917°S 13.62194°E / -5.51917; 13.62194
StatusOperational
Construction beganInga I: 1968
Inga II:
Opening dateInga I: 1972
Inga II: 1982
Power Station
TurbinesInga I: 6 x 58.5 MW
Inga II: 8 x 178 MW
Installed capacityInga I: 351 MW
Inga II: 1,424 MW

The Inga Dams are two hydroelectric dams connected to one of the largest waterfalls in the world, Inga Falls. They are located in the western Democratic Republic of the Congo and 140 miles southwest of Kinshasa. The Congo River drops 96 metres (315 ft).[1]

History

The Belgian colonial government was considering starting what it called "The Inga Scheme" on the eve of decolonization in 1959.[2] Inga I was completed in 1972, and Inga II in 1982.[3]

Early study

1890s map of the Inga Falls

The hydropower potential of the Congo River was recognized quite early on, at a time when colonial control was expanding over Africa and rivers were first being harnessed to generate electricity. One early report on this potential came via the United States Geological Survey in 1921; their findings concluded that the Congo basin in its entirety possessed "more than one-fourth of the world’s potential water power". Regarding the Inga Falls location specifically, this was highlighted just four years later by the Belgian soldier, mathematician, and entrepreneur Colonel Van Deuren. He would continue survey work around Inga Falls, and during the 1920s and 1930s there was some movement towards further study of the area’s potential by the group Syneba (1929–1939), yet the outbreak of World War II and the dissolution of Syneba put a temporary end to progress on the site.[4]

Atlantropa, a scheme for integrating Europe and Africa conceived by Herman Sorgel in the 1920s, included a proposal to dam the Congo River. In this plan, the water would have been used to irrigate the deserts of North Africa, and to generate 22.5 to 45 gigawatts of power.[5]

Belgian plan

Despite the lack of progress during and in the immediate aftermath of the Second World War, the tantalizing possibilities offered by the Inga Falls remained prominent in engineers’ minds. The 1954 book Engineers’ Dreams listed a host of massive projects that could theoretically be accomplished (among them the future Channel Tunnel), the largest being an Inga Dam that would create a lake stretching into the Sahara Desert.[6]

Before Congolese independence, the Belgians still harbored the hope of constructing a massive Inga development project to generate electricity for heavy industry.[7] Among those industries discussed were "aluminum, ferro-alloys, the treatment of ores, paper, and a plant for the separation of isotopes."[8] Their vision, at least publicly, was bold, with one authority comparing the potential industrial development in the Congo to the German Ruhr.[8] There was an important American connection the project in the form of Clarence E. Blee, one of five foreigners on a 10-person study of the Inga site in 1957 and the chief engineer of the United States’ foray into federal electrical and industrial development, the Tennessee Valley Authority.[8] This study would play a central role in convincing the Belgian authorities to set an Inga dam in motion.

An Inga scheme, loosely reported as consisting of a "series of power stations and dams", was finally passed by the Belgian Cabinet on November 13, 1957, and a group was slated to be created in order to study the possible uses of the project’s electricity and the ways in which to fund it. The Cabinet’s plan was estimated at the time to cost US$3.16 billion and was expected to generate 25,000 MW.[9]

A report from late April 1958 stated that excavation work would hopefully begin by midyear, with 1964/1965 as the year set to bring the initial stage to completion. Plans called for three stages of construction, beginning with a 1,500 MW plant with a $320 million price tag, then twice that capacity, and eventually the 25,000 MW originally approved. Industrial development would advance in step, helped by a start price of $0.002 per kwh, producing 500,000 tons of aluminum with the construction of the first plant and eventually aiming for a final production goal six times that. An international syndicate named Aluminga, comprising a number of European and North American firms, was already organizing to realize this. Funding was an issue, especially once the Belgians realized that they could not accomplish such a project alone. Possible investors cited by the press included the International Bank for Reconstruction and Development and the European Investment Bank.[10]

In February 1959 a group of prominent American investors including David Rockefeller visited the Inga Falls,[11] though construction was continually being pushed back from original estimates, then slated for 1961 or later.[12]

Congolese independence from Belgium did not suddenly erase the importance of Inga development. Belgian authorities were still pushing the project while negotiating independence with Congolese delegates, with Minister Raymond Scheyven proposing a joint Congolese-Belgian company that would fund an Inga dam. This was not a minor idea, but the main project in a five-year Congolese development plan he proposed.[13] That advice was apparently not heeded, as newly elected Prime Minister Patrice Lumumba signed a fifty-year contract with the Wall Street-based Congo International Management Corporation to develop the Congo on July 22, 1960, with an Inga project and associated aluminum production at the top of the list.[14] PM Lumumba later backtracked and claimed that the deal was "only an agreement in principle",[15] but regardless he was deposed by Army Chief of Staff Mobutu Sese Seko less than two months later.

Inga I and Inga II

Inga I facility

Despite the ensuing period of instability, rebellions, and UN interventions in the first half of the 1960s, it did not dampen leaders' hopes to harness the rapids of the Congo River. From the wreckage of the Belgian departure and the subsequent turmoil emerged Mobutu Sésé Seko, who seized full power for himself in November 1965 and would remain the Congo’s authoritarian president until May 1997. It was during his reign that the first and so far only projects were built to generate power from the Inga Falls.

Inga I was the first project brought to completion. A feasibility study was conducted by the Italian firm SICAI in 1963, which recommended the dam support domestic industrialization as opposed to export focused industry.[16] Funded mainly by the government, construction took place from 1968 to 1972, leaving a six-turbine plant generating 351 MW.[17] This electricity was mainly fed to the populated areas around it and downstream; its successor was explicitly for mining activity in the south.

Inga II was the second hydro project built at the site just south of Inga I. Even with just eight turbines, it was built to produce 1,424 MW, and was completed a full decade after Inga I.[17]

Inga-Shaba power line

In order to connect the power generating capacity at Inga with the copper and cobalt mines located near the Zambian border in Shaba Province (now Katanga), a new project aimed to build the longest high-voltage direct current power line in existence, bypassing local communities and converting into alternating current at its final destination. The various groups involved had economic as well as political agendas; while Western investors and the Congolese government wished to support the Shaba mines during a period of elevated copper prices, the government also wanted to consolidate its power over the secessionist southern province, and the West had an interest in seeing the Congo stay firmly in the anti-communist camp. The cost for the project was constantly revised upward, eventually reaching $500 million over budget. A mix of private and public groups provided the financing, notably Citibank, Manufacturers Hanover Trust, and the U.S. Export-Import Bank, and it was the storied Boise, Idaho-based company, Morrison-Knudsen, that was contracted to do the work.[18][19]

In 1980, the costs of the Inga-Shaba power line totaled 24% of Congo’s debt, which along with corruption, other wasteful spending, and bad decision-making, led to a debt crisis and the intervention of foreign experts.[20] As of 1999, Congo still owed the U.S. Export-Import Bank over $900 million, leaving American taxpayers unpaid.[21] As the Inga-Shaba line neared completion in the early 1980s, many news articles poured scorn on the project. One from the Washington Post juxtaposed its failure with a successful Peace Corps project to improve the Congolese diet, noting that, "the grandiose project has so far turned out to be a white elephant, while the low-key fish-farming endeavor has already made visible improvements in the lives of several thousand people in a similar period of time."[19] Gécamines, the state-owned mining company in Shaba that was founded in 1906 by the Belgians, ended up still mainly using hydroelectricity supplied locally, and thus the Inga-Shaba line found itself being used at a mere third of capacity. Furthermore, the structure itself has been degraded as local peoples have used its metal bars for a variety of domestic needs.[22]

Current dams

Inga dam projects, as of 2006.

The two hydroelectric dams, Inga I and Inga II, currently operate at a low output. Inga I has a total installed capacity of 351 MW and Inga II has 1424 MW.[23] They were built under former president Mobutu Sese Seko as part of the Inga–Shaba project.

Rehabilitation

The DRC has faced the problem of rehabilitating the two existing dams, which have fallen into disrepair and operate far below original capacity at roughly 40%, or just over 700 MW combined.[24] In May 2001 Siemens was reportedly negotiating with the government over a billion-dollar partnership that would involve restoration and modernization of the DRC’s electrical grid, including the rehabilitation of the two existing Inga power plants,[25] though work was delayed.[26] In mid-2003 there was also a report that the World Bank had signed a $450 million contract with Siemens to improve water and electrical distribution in the DRC, including rehabilitation of the two Inga projects (reported at the time to be at 30% capacity) and a second electrical line from Inga to the capital.[27] It is unclear what transpired concerning these contracts.

Separately in May 2005 the Canadian company MagEnergy signed an agreement with SNEL to rehabilitate some of Inga II’s turbines, with a completion goal of 2009.[28] Actual work to rehabilitate Inga II finally began April 27, 2006, just under a year after the initial agreement with MagEnergy was signed.[29] This first phase, which involved fixing a single 168 MW turbine and other emergency repair work, was reported 90% complete in April 2009, and the second phase (four other turbines) was estimated to take five additional years.[30] However, there is doubt over whether the government accepts the validity of the contract, and in the meantime the Canadian company First Quantum was hired to rehabilitate two separate Inga II turbines.[31] To carry out the repairs, the SNEL has received funding from the Regional and Domestic Power Markets Development Project, which is itself supported by the World Bank, African Development Bank, and European Investment Bank.[24]

Expansion plans

Official projections for Inga III and Grand Inga, as of 2006.

There are expansion plans to create a third Inga dam, Inga III. Projections indicate that once completed, Inga III would generate 4,500 MW of electricity. Inga III is the centerpiece of the Westcor partnership which envisions the interconnection of the electric grids of the Democratic Republic of the Congo (DRC), Namibia, Angola, Botswana, and South Africa. The World Bank, the African Development Bank, the European Investment Bank, bilateral donors, and the southern African power companies, have all expressed interest in pursuing the project which is estimated to cost US$80 billion.

One enthusiastic backer of Inga development has been South Africa. In July 1999, newly elected South African President Thabo Mbeki gave a speech to the Organisation of African Unity, highlighting development of the Inga Falls for hydropower as an example of necessary development of Africa’s economic infrastructure.[32] For South Africa’s public utility Eskom, Inga fit into a broader plan to turn an interconnected African grid into an electricity-exporting powerhouse, eventually supplying Europe and the Middle East.[33] In 2002 Inga was highlighted by the AU’s New Partnership for Africa's Development (NEPAD)[34] and Eskom was reported to be investigating a $6 billion run-of-the-river type Inga project which would be developed by an Eskom and Hydro-Québec-led consortium of national utility companies.[35]

Such a consortium, dubbed the Western Power Corridor (Westcor) was finally organized in February 2003. Involving five of the region’s major utility companies (Eskom, SNEL, Angola’s Empresa Nacional de Electricidade, Namibia’s NamPower, and the Botswana Power Corporation) it projected initial costs at $1.5 billion and the eventual construction of a 44,000 MW run-of-the-river project.[36] A memorandum of understanding for Westcor was finally signed on October 22, 2004, for the construction of a 3,400 MW Inga III.[37] The following February Eskom unveiled a new $50 billion run-of-the-river scheme.[38] That September 2005 a shareholder agreement for Westcor was signed, giving each party 20%.[39]

The DRC appeared to move away from the regional development approach offered by Westcor and instead manage the construction of Inga III on its own. In June 2009 it opened bidding for a $7 billion, 4320 MW Inga III project.[40] Snubbing Westcor, the DRC chose BHP Billiton, which intended to use 2,000 MW for itself, notably for an aluminum smelter.

Grand Inga

The Grand Inga Dam would generate 39,000 MW – and would significantly boost the energy available to the African continent at a cost of $80 billion. Connecting Inga to a continent-wide electricity grid for main population centers would cost $10 billion more (est. 2000), and would be the world's largest hydroelectric project. Critics contend the huge amounts of money required for the project would be better spent with smaller scale, localized energy projects that would better meet the needs of Africa's poor majority. A study from Oxford University supports this cautious approach by showing that the average cost overrun for 245 large dams in 65 countries across six continents is 96% in real terms.[41]

The NEPAD (New Partnership for Africa's Development), with significant involvement of South African electric power company ESKOM, has suggested to start the Grand Inga project in 2010.[42][43] At an installed capacity of 39,000 MW, the Grand Inga Dam alone could produce 250 TWh annually, or a total of 370 TWh annually for the whole site. In 2005, Africa's annual electricity production was 550 TWh (600 kWh per capita). If the dam were to be completed it would not happen until sometime after 2024[44]

Africa's electric energy disparity

Africa produces a very low amount of electric energy per capita compared to other regions of the world. Projects such as the Grand Inga Dam, which can generate 43.5 GW, can help solve Africa's electricity shortage. In 2005, South Africa and North Africa produced 70% of the 550 TWh (63 GW) electric output of the continent.

South Africa: 230 TWh p.a. / 26.2 GW (4500 kWh p.a. per capita / 513 W per capita)

North Africa: 150 TWh p.a. / 17.1 GW (1000 kWh p.a. per capita /114 W per capita)

Sub Saharan Africa (South Africa excluded): 170 TWh p.a. / 19.4 GW (250 kWh p.a. per capita / 29 W per capita)

There is speculation that the Grand Inga Dam can produce enough electricity for the whole continent. That was true before the 1990s.[45][46] The continent has annual economic and population growth respectively of 5% and 2.5%. In 2005, electricity usage was 600 kWh per capita for the 910 million Africans. The region with chronic power shortages is Sub Saharan Africa (South Africa excluded), where production was only 250 kWh per capita for 700 million people. An African average of at least 1000 kWh per capita requires a total continental production of more than 1000 TWh p.a. / 120 GW. This is equivalent to three times the maximum capacity of Grand Inga Dam. The world average per capita was 3044 kWh in 2012 (The World Bank: 2014 The Little Data Book).

According to some, Grand Inga would be too large a proportion of the African demand (43.5 GW combined output compared to a load of 63 GW) to be a practical power source without interconnection by a wide area synchronous grid for example, as well as other power grids.[citation needed] Any large-scale failure of the dam, or its connections to the grid, such as the 2009 Brazil and Paraguay blackout (17 GW), or the 2009 Sayano–Shushenskaya power station accident in Siberia (6.4 GW), would plunge large parts of Africa into a power failure with potentially serious consequences. The Siberia failure, for example, had a disastrous effect on local aluminium smelters. By this argument, full utilization requires interconnection with Europe, so that power to Europe can then be back fed to Africa. This increases the stability of both systems and reduces overall costs.[47][48]

Three international consortia are bidding for the contract to build the dam, known as Inga III, and to sell the power it generates, estimated at 4,800 MW. This is nearly three times the power produced from Inga's two existing dams, which are decades old and have been crippled by neglect because of government debt and risk-averse investors. The World Bank said, under the current plan, South Africa would buy 2,500 MW from Inga III, and another 1,300 MW would be sold to Congo's power-starved mining industry. The remaining 1000 megawatts would go to the national utility SNEL, helping provide power to an estimated 7 million people around Kinshasa, Congo's capital, and covering all the projected unmet electricity needs there by 2025.[49]

See also

References

  1. ^ "The world tallest and largest waterfalls". Fizzyenergy.com. 23 September 2009. Archived from the original on 19 January 2015. Retrieved 20 February 2015.
  2. ^ Louis Ameye (4 June 1959). "Economic Problems of the Congo". Royal African Society.
  3. ^ RUDO SANYANGA. "Will Congo Benefit from Grand Inga Dam?". International Policy Digest. Archived from the original on 4 April 2014. Retrieved 29 June 2013.
  4. ^ Showers, Kate B. (2009). "Congo River's Grand Inga hydroelectricity scheme: linking environmental history, policy and impact". Water History. 1 (1): 31–58. doi:10.1007/s12685-009-0001-8.
  5. ^ Lehmann, Philipp Nicolas (1 February 2016). "Infinite Power to Change the World: Hydroelectricity and Engineered Climate Change in the Atlantropa Project". The American Historical Review. 121 (1): 70–100. doi:10.1093/ahr/121.1.70. ISSN 0002-8762.
  6. ^ Leonard, Jonathan N. (30 May 1954). "New Sources of Power". The New York Times Book Review. p. 14.
  7. ^ "Economy Gaining in Belgian Congo". The New York Times. 28 September 1957. p. 27.
  8. ^ a b c Holz, Peter (March 1958). "More Power Lights "Darkest Africa"". Popular Mechanics. 109 (3): 232.
  9. ^ "Congo Plan Approved". The New York Times. 14 November 1957. p. 18.
  10. ^ Waggoner, Walter H. (26 April 1958). "Belgium Rushes Huge Power Project on the Congo". The New York Times. p. 24.
  11. ^ Bracker, Milton (11 February 1959). "U.S. Bankers View Project in Congo". The New York Times.
  12. ^ "Belgian Congo Plant Delayed". The New York Times. 7 April 1959.
  13. ^ Gilroy, Harry (17 February 1960). "Congo Cautioned On Its Economy". The New York Times.
  14. ^ Tanner, Henry (23 July 1960). "Congo Signs Pact With U.S. Concern To Tap Resources". The New York Times.
  15. ^ "CONGO: Where's the War?". TIME. 8 August 1960. Retrieved 19 November 2009.
  16. ^ Young, Crawford; Turner, Thomas (1985). The Rise and Decline of the Zairian State. Madison: The University of Wisconsin Press. pp. 298–301.
  17. ^ a b "Inga 1 and Inga 2 dams". International Rivers. Retrieved 19 November 2009.
  18. ^ Randa, Jonathan C. (28 April 1977). "Mobuto Riding High, But Possibility Raised of Guerilla Warfare". The Washington Post. p. A26.
  19. ^ a b Ross, Jay (25 April 1982). "A Tale of Two Projects: One Winner, One Loser". The Washington Post. p. C5.
  20. ^ Dash, Leon (1 January 1980). "Mobutu Mortgages Nation's Future". The Washington Post. p. A1.
  21. ^ Mufson, Steven (16 December 1999). "Abroad at Home: The Foreign Affairs Community – Ex-Im Bank Aims to Do More in Africa". The Washington Post. p. A37.
  22. ^ Winternitz, Helen (1987). East Along the Equator: A Journey Up the Congo and into Zaire. New York: Atlantic Monthly Press. p. 175.
  23. ^ "Inga 1 and Inga 2 dams". International Rivers. International Rivers. Archived from the original on 7 March 2012. Retrieved 2 January 2015.
  24. ^ a b "Inga 1 and Inga 2 dams". International Rivers. Retrieved 19 November 2009.
  25. ^ "Siemens Plans to Invest $1 billion in RDC Electronics Network". European Report. 24 May 2001.
  26. ^ "Grand Schemes on the Congo". IT Week. 3 February 2004.
  27. ^ Misser, Francois (1 June 2003). "Siemens flags off massive DRC project". African Business.
  28. ^ "MagEnergy Concludes Inga II Rehabilitation Agreement". Marketwire. 31 May 2005.
  29. ^ "MagEnergy Announces Start of Inga II Hydroelectric Plant Work Program". Marketwire. 1 May 2006.
  30. ^ "MagEnergy nears completion of unit rehab at DR Congo's 1,424-MW Inga 2". Hydroworld.com. 20 April 2009. Retrieved 22 November 2009.
  31. ^ "Everyone Plugs Into Inga". Africa Energy Intelligence. 11 February 2009.
  32. ^ Mbeki, Thabo (20 July 1999). "Podium: The globalization of Africa". The Independent. London. Retrieved 17 November 2009.
  33. ^ Hale, Briony (17 October 2002). "Africa's grand power exporting plans". BBC News. Retrieved 17 November 2009.
  34. ^ "Hard Talk, Charm Carries the Day for NEPAD". All Africa. 13 June 2002.
  35. ^ "Eskom's Secret Project". Africa Energy Intelligence. 19 May 2002.
  36. ^ "Pan African Consortium for Inga". Africa Energy Intelligence. 19 February 2003.
  37. ^ Thomson, Alistair (22 October 2004). "Africa plans new Congo generator, seeks investment". Reuters.
  38. ^ Vasagar, Jeevan (25 February 2005). "Could a $50bn plan to tame this mighty river bring electricity to all of Africa?". The Guardian. London. Retrieved 17 November 2009.
  39. ^ "Landmark Agreement to Satisfy Regional Power Needs". All Africa. 8 September 2005.
  40. ^ "Congo opens bidding for Inga 3 hydro dam investors". Reuters. 19 June 2009. Retrieved 17 November 2009.
  41. ^ "Should We Build More Large Dams? The Actual Costs of Hydropower Megaproject Development by Atif Ansar, Bent Flyvbjerg, Alexander Budzier, Daniel Lunn :: SSRN". Papers.ssrn.com. SSRN 2406852. {{cite web}}: Missing or empty |url= (help)
  42. ^ "IRIN Africa | SOUTHERN AFRICA: New plant to bring regional power on stream | SOUTHERN AFRICA | Economy | Environment | Other". Irinnews.org. 14 November 2003. Archived from the original on 11 January 2008. Retrieved 15 September 2013.
  43. ^ "businessinafrica.net". businessinafrica.net. Archived from the original on 7 August 2011. Retrieved 15 September 2013.
  44. ^ "GCR - News - DR Congo's Inga 3 dam to double in size to 12GW". www.globalconstructionreview.com. Archived from the original on 16 July 2017. Retrieved 17 September 2017.
  45. ^ "IEEE Xplore – African electricity infrastructure interconnections and electricity exchanges" (PDF). Ieeexplore.ieee.org. doi:10.1109/60.900510. Retrieved 15 September 2013. {{cite journal}}: Cite journal requires |journal= (help)
  46. ^ "SciTech Connect". Osti.gov. OSTI 479422. {{cite journal}}: Cite journal requires |journal= (help)
  47. ^ Andrews, Dave (1 August 2009). "Vision 2020 and beyond – Dr. Gregor Czisch Ex Kassell University discussed the integration of African Power production internally and with Europe to fully exploit the vast hydro power available at the Inga Dam site". Claverton-energy.com. Archived from the original on 28 September 2013. Retrieved 13 September 2013.
  48. ^ Andrews, Dave (1 August 2009). "Vision 2020 and beyond - Dr. Gregor Czisch Ex Kassell University discussed the integration of African Power production internally and with Europe to fully exploit the vast hydro power available at the Inga Dam site | Claverton Group". Claverton-energy.com. Archived from the original on 14 August 2009. Retrieved 20 February 2015.
  49. ^ "World Bank approves funds to study Congo's Inga dam". Reuters.com. Archived from the original on 31 March 2015. Retrieved 20 February 2015.