Geothermal power in Portugal

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by BG19bot (talk | contribs) at 06:18, 27 April 2014 (WP:CHECKWIKI error fix for #61. Punctuation goes before References. Do general fixes if a problem exists. - using AWB (10084)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Portugal's main investment into this type of energy is in the Azores. While electricity is only produced on São Miguel, Azores, direct-use applications are also at Chaves in northern Portugal, at S. Pedro do Sul in central Portugal and at the Lisbon Air Force Hospital.

Azores

In the Azores, five geothermal power plants exist on São Miguel, one near Pico Vermelho (in operation since 1981) and four binary cycle power plants in Ribeira Grande, which have together an installed capacity of 16 MWe. A third one is built on Terceira (12 MWe) and will be completed in 2008. In 2003, 25% of the electricity consumed on São Miguel was produced by geothermal energy.[1]

Capacity (in MWt):[1]
Island Total (MWt)
S. Miguel 173
Terceira 25
Faial 12
Pico 8,9
S. Jorge 8
Graciosa 5
Flores 2.5
Corvo 1,1
Total 235,5