Jump to content

Line 7 (Suzhou Rail Transit)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Garuda3 (talk | contribs) at 22:36, 12 February 2021 (removed Category:Suzhou Rail Transit; added Category:Suzhou Rail Transit lines using HotCat). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 7
 7 
Overview
StatusUnder construction (one segment is operational)
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations33
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
Technical
Line length29.6 km
Track gauge1,435 mm (4 ft 8+12 in)

Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019.[1] The line will be 29.6 kilometers long.[1]

According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7.[2]

It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.[3]

Stations

Station name Connections Distance
km
Location
English Chinese
Template:SZRT stations 莫阳 0.000 0.000 Xiangcheng
Template:SZRT stations 相城大道北
Template:SZRT stations 高铁苏州北  2 
Template:SZRT stations 会展中心
Template:SZRT stations 青龙港
Template:SZRT stations 富元路
Template:SZRT stations 蠡塘河路
Template:SZRT stations 春申湖东路
Template:SZRT stations 相城区行政中心北
Template:SZRT stations 相城区行政中心南  8 
Template:SZRT stations 白荡南 SIP
Template:SZRT stations 扬东路
Template:SZRT stations 扬华路
Template:SZRT stations 现代大道西
Template:SZRT stations 中央公园  1 
Template:SZRT stations 中新大道西  6 
Template:SZRT stations 黄天荡  5 
Template:SZRT stations 娄葑
Template:SZRT stations 东兴路西  8 
Template:SZRT stations 通园路南  3 
Template:SZRT stations 林家潭路 Wuzhong
Template:SZRT stations 郭巷  2 
Template:SZRT stations 尹中路南
Template:SZRT stations 澄湖东路
Template:SZRT stations 枫津路
Template:SZRT stations 红庄  4 
Template:SZRT stations 蠡墅
Template:SZRT stations 石湖莫舍
Template:SZRT stations 越溪
Template:SZRT stations 文溪路
Template:SZRT stations 天鹅荡路
Template:SZRT stations 苏州湾北
Template:SZRT stations 木里

References

  1. ^ a b "苏州轨道交通7号线开工建设". 2019-12-25.
  2. ^ "Archived copy". Archived from the original on 2012-07-13. Retrieved 2012-06-29.{{cite web}}: CS1 maint: archived copy as title (link) (Website of the subway operator "SZ-Transit" (苏州轨道交通/Suzhou Guidao Jiaotong) (information retrieved on Oct. 16th, 2010))[dead link]
  3. ^ 顾蕾 (2012-02-10). 苏州轨交4号线及支线今年6月动工. 苏州日报 (in Chinese). Archived from the original on 2012-07-14. Retrieved 2012-06-19.