Line 7 (Suzhou Rail Transit)
Appearance
Line 7 | |
---|---|
7 | |
Overview | |
Status | Under construction (one segment is operational) |
Owner | Suzhou Rail Transit Co., Ltd |
Termini | |
Stations | 33 |
Service | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Operator(s) | Suzhou Rail Transit Co., Ltd |
Technical | |
Line length | 29.6 km |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019.[1] The line will be 29.6 kilometers long.[1]
According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7.[2]
It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.[3]
Stations
References
- ^ a b "苏州轨道交通7号线开工建设". 2019-12-25.
- ^ "Archived copy". Archived from the original on 2012-07-13. Retrieved 2012-06-29.