ASU Stadium (Alabama)

Coordinates: 32°21′50″N 86°17′26″W / 32.36389°N 86.29056°W / 32.36389; -86.29056
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by DB1729 (talk | contribs) at 23:27, 10 October 2022 (Restored revision 1115171993 by DB1729 (talk): Restore). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

ASU Stadium
ASU Stadium
Map
LocationMontgomery, Alabama
Coordinates32°21′50″N 86°17′26″W / 32.36389°N 86.29056°W / 32.36389; -86.29056
OwnerAlabama State University
OperatorAlabama State University
Capacity26,500
SurfaceAstroTurf[3]
Construction
Broke groundFebruary 4, 2011[1]
OpenedNovember 22, 2012[2]
Construction cost$62 million
ArchitectBrown Chambless Architects[4]
Convergence Design[4]
Project managerTCU Consulting Services[7]
Structural engineerBlackburn Daniels O'Barr[5]
Services engineerCRS Engineering, Inc.[6]
General contractorRabren General Contractors, Inc.[8]
Tenants
Alabama State Hornets (NCAA) (2012–present)

The ASU Stadium on the campus of Alabama State University in Montgomery, Alabama is a 26,500-seat stadium that replaces the Cramton Bowl as the host venue for the Alabama State Hornets football team. The first game in the second ASU Stadium was the 89th Turkey Day Classic on November 22, 2012 in which the Hornets hosted the Tuskegee Golden Tigers. The game was a sell-out and was televised nationally on ESPNU. The Hornets lost the first ever game in their new stadium 27-25 due to a late two-point conversion by Tuskegee.

The stadium's current capacity sits at 26,500 but the project was designed to allow for future expansion that can expand the capacity to 55,000.[9]

Other uses

The stadium also holds a restaurant and retail space which welcome visitors to the stadium and area 365 days a year.[10] The stadium itself will be used year-round with other events such as concerts, band competitions, as well as soccer matches and other sporting events by partnering with the Central Alabama Sports Commission.[9]


Attendance records

Rank Attendance Date Game Result
1 27,828 September 7, 2019 Alabama State 38, Tuskegee 31
2 27,500 November 22, 2012 Alabama State 25, Tuskegee 27
3 26,222 September 1, 2018 Alabama State 26, Tuskegee 20OT
4 25,442 September 2, 2017 Alabama State 6, Tuskegee 14
5 20,703 August 31, 2013 Alabama State 22, Jacksonville State 24
6 18,972 November 24, 2016 Alabama State 53, Miles 20
7 17,560 November 8, 2014 Alabama State 26, Jackson State 10
8 17,309 September 21, 2019 Alabama State 23, Grambling State 20
9 15,887 September 14, 2019 Alabama State 7, 9 Kennesaw State 42
10 15,725 September 6, 2014 Alabama State 27, 14 Tennessee State 21
11 15,553 October 5, 2017 Alabama State 10, Alcorn State 24
12 15,322 November 23, 2017 Alabama State 37, Edward Waters 3
13 15,252 November 28, 2019 Alabama State 17, Prairie View A&M 20
14 15,201 November 21, 2015 Alabama State 26, Miles 7
15 15,143 November 9, 2013 Alabama State 28, Southern 31
16 14,428 November 10, 2018 Alabama State 2, Jackson State 20
17 14,396 November 28, 2013 Alabama State 41, Stillman 28
18 14,199 September 24, 2016 Alabama State 27, Texas Southern 31
19 13,865 September 13, 2014 Alabama State 47, Mississippi Valley State 22
20 13,156 November 22, 2014 Alabama State 30, Stillman 27

See also

References

  1. ^ Flanagan, Ben (February 3, 2011). "ASU Football Stadium Groundbreaking, Baseball Complex Ribbon Cutting Friday". Alabama Live LLC. Retrieved July 8, 2012.
  2. ^ Kneidinger Hull, Christine (September 14, 2011). "ASU 'Clock and Block' Party to Count Down Days Until Stadium Play". Alabama Live LLC. Retrieved July 8, 2012.
  3. ^ "Alabama State to debut new AstroTurf field on Thanksgiving Day". AstroTurf USA. November 20, 2012. Retrieved February 27, 2018.
  4. ^ a b Muret, Don (October 3, 2011). "Alabama St. Sees New $50M Stadium As First Step to FBS Status". SportsBusiness Journal. Retrieved July 8, 2012.
  5. ^ "Engineering Projects". Blackburn Daniels O'Barr. Retrieved July 8, 2012.
  6. ^ "ASU Football Stadium". Auburn Electrical Construction Co., Inc. Retrieved July 8, 2012.
  7. ^ "Clients". TCU Consulting Services. Archived from the original on December 8, 2013. Retrieved July 8, 2012.
  8. ^ "Pulse". Engineering News-Record. January 28, 2012. Retrieved July 8, 2012.
  9. ^ a b "$62 million Alabama State stadium sets stage for growth across Montgomery". AL.com. November 21, 2012. Retrieved June 11, 2013.
  10. ^ "NewASUStadium.com: About Us". NewASUStadium.com. Archived from the original on October 12, 2013. Retrieved June 11, 2013.

External links