Yellow Line
Overview
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
LocaleBangalore, Karnataka, India
Termini
Stations16
Websitebmrc.co.in
Service
TypeMetro
SystemNamma Metro
Depot(s)Hebbagodi
History
Planned openingPhase 1 (CSB-Bommasandra) - June 2023; 11 months ago (2023-06)
Phase 2 (RV Road-CSB) - December 2023; 5 months ago (2023-12)
Technical
Line length18.82 km (11.69 mi)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Yellow Line Map (TBC)

Rashtreeya Vidyalaya Road
Ragigudda
Jayadeva Hospital
Pink Line
Under Construction
BTM Layout
Central Silk Board
Blue Line
Under Construction
Bommanahalli
Hongasandra
Kudlu Gate
Singasandra
Hosa Road
Beratena Agrahara
Konappana Agrahara
Electronic City
Huskur Road
Hebbagodi
Mainline rail interchange Hebbagodi Depot (U/C)
Bommasandra

The Yellow Line of Namma Metro is under construction and will form part of the metro rail network for the city of Bangalore, Karnataka, India. The 18.82 km line connects R.V. Road with Bommasandra and is fully elevated with 16 stations.[1] R.V. Road station is the terminal station on city side where an interchange is being provided with the Green Line. Jayadeva Hospital station will, in future serve as another interchange station with the Pink Line[2] that is also under construction in Phase ll of Namma Metro's expansion. Silkboard station will be another interchange station between Yellow Line and Blue Line. The other end of Yellow Line was initially planned to terminate at Bommasandra but on 9 June 2022, the Karnataka government gave approval for the extension of this line from Bommasandra to Hosur in Tamil Nadu.[3]

Planning

Namma Metro's Phase ll includes two new lines - Yellow and Pink Lines, as well as extensions of Purple Line and Green Line.[1] Phase II spans a length of 72.095 km (13.79 km underground, 0.48 km at grade and 57.825 km elevated) and adds 61 stations to the network of which 12 are underground.[4]

Tenders for the construction of Yellow Line (between R V Road and Bommasandra) were floated in 3 packages.[5] On 9 December 2016, BMRC floated tenders for the construction of 6.418 km stretch from Bommasandra to Hosa Road station. The work involves construction of viaduct with five stations and includes construction of the depot entry line leading to Hebbagodi depot.[6] Tenders for the 6.385 km stretch from Hosa Road to Bommanahalli (previously HSR Layout) were floated the next day.[7] Both packages were awarded to Thai-based ITD Cementation India in May 2017 for ₹511.35 and 485.52 crores (US$140 mil totally).[8] Civil works began in November 2017.

The third tender for construction of the 6.34 km elevated section and 5 stations was awarded to a joint venture between Hindustan Construction Company (HCC) and URC Construction Pvt Ltd. on 3 July 2017 for 797.29 crore (US$100 million).[9]

Yellow Line
Section Length

(km)

Stations (All Elevated) Contract cost Contractor(s) Expected completion
Bommasandra - Hosa Road 6.418 Bommasandra, Hebbagodi, Huskur Road, Electronics City, Konappana Agrahara, Beratena Agrahara ₹511.35, 485.52 crores

(US$140 mil totally)

ITD-ITD Cem India JV June 2023
Hosa Road -

Central Silk Board

6.385 Hosa Road, Singasandra, Kudlu Gate, Hongasandra, Bommanahalli, CSB
Central Silk Board - RV Road 6.340 Central Silk Board, BTM Layout, Jayadeva Hospital, Ragigudda, RV Road ₹797.27 crores

(US$110 mil)

HCC-URC JV December 2023

Funding

For Phase-2 of Namma Metro, the Central and State Governments will fund around ₹15,000 crore. The State and Central Governments will bear 30% and 20% of the project cost respectively. The remaining will be obtained through senior term loans. BMRCL is permitted to raise up to ₹9,000 crore through loans.

Indian firms Biocon and Infosys announced that they would provide funding construction of the Hebbagodi and Konappana Agrahara (now renamed 'Infosys Foundation Konappana Agrahara') metro stations respectively on the Yellow Line. Each firm will contribute 100 crore (US$13 million) towards the project. Biocon CMD Kiran Mazumdar Shaw stated that the company wanted to fund the project because it would help de-congest the city. Both Biocon and Infosys have offices located near the stations.[10]

Infrastructure

Rolling stock

BMRC plans to operate driverless trains on the Yellow Line with Communication Based Train Control (CBTC) signaling system.[11] On 2 December 2019, BMRC awarded a contract for supplying 90 coaches (15 rakes) to CRRC Nanjing Puzhen Co.Ltd with CBTC signaling for the Yellow Line.[12]

The contract for construction of Hebbagodi depot was awarded to Parnika Commercial & Estates(P) Ltd in July 2019.[13]

Stations

The Yellow Line is fully elevated and will have 16 stations.

Yellow Line
# Station Name Connections Alignment
English Kannada
Phase 2 (Operational from December 2023)
1 Rashtreeya Vidyalaya Road ರಾಷ್ಟ್ರೀಯ ವಿದ್ಯಾಲಯ ರಸ್ತೆ Subway interchange      Green Line Elevated
2 Ragigudda ರಾಗಿಗುಡ್ಡ Elevated
3 Jayadeva Hospital ಜಯದೇವ ಆಸ್ಪತ್ರೆ Subway interchange      Pink Line (Under Construction) Elevated
4 BTM Layout ಬಿಟಿಎಂ ವಿನ್ಯಾಸ Elevated
Phase 1 (Operational from June 2023)
5 Central Silk Board ಕೇಂದ್ರ ರೇಷ್ಮೆ ಮಂಡಳಿ Subway interchange      Blue Line (Under Construction) Elevated
6 Bommanahalli ಬೊಮ್ಮನಹಲ್ಲಿ Elevated
7 Hongasandra ಹೊಂಗಸಂದ್ರ Elevated
8 Kudlu Gate ಕುಡ್ಲು ಕಣಿವೆಮಾರ್ಗ Elevated
9 Singasandra ಸಿಂಗಸಂದ್ರ Elevated
10 Hosa Road ಹೊಸ ರಸ್ತೆ Elevated
11 Beratena Agrahara ಬೆರಾಟೆನಾ ಅಗ್ರಹಾರ Elevated
12 Electronic City ಎಲೆಕ್ಟ್ರಾನಿಕ್ ಸಿಟಿ Elevated
13 Konappana Agrahara ಕೊನಪ್ಪನ ಅಗ್ರಹಾರ Elevated
14 Huskuru Road ಹುಸ್ಕುರು ರಸ್ತೆ Elevated
15 Hebbagodi ಹೆಬ್ಬಗೋಡಿ Elevated
16 Bommasandra ಬೊಮ್ಮಸಂದ್ರ Elevated

See also

References

  1. ^ a b bmrc.co.in/pdf/phase2/phase2forweb.pdf
  2. ^ "Know the location of new Red Line metro stations". The Hindu. 15 July 2017. Retrieved 19 January 2019.
  3. ^ "Karnataka approves plan to extend metro rail from Bommasandra to Hosur". The New Indian Express. Retrieved 10 June 2022.
  4. ^ "Metro gets poll push for Phase II". Deccan Chronicle. 4 June 2013. Retrieved 28 September 2013.
  5. ^ "Tender for Electronics City metro reach issued – Bangalore Mirror -". Bangalore Mirror. Retrieved 7 March 2017.
  6. ^ "Metro floats tenders for Electronics City route". The New Indian Express. Retrieved 11 December 2016.
  7. ^ Staff Reporter. "Electronics City inches closer to being on metro map". The Hindu. Retrieved 11 December 2016.
  8. ^ "Thai company ITD will build stations on e-city line in Bengaluru". The Economic Times. Retrieved 11 May 2017.
  9. ^ "HCC-URC JV Lowest Bidder for Bangalore Metro's RV Rd – HSR Layout". TheMetroRailGuy. 16 May 2017. Retrieved 26 January 2017.
  10. ^ "Biocon, Infy to Adopt Two Metro Stations – ETtech". ETtech.com. Retrieved 18 May 2017.
  11. ^ Shah, Narendra (13 April 2019). "First Driverless trains likely to run on the Namma Metro's Yellow line by 2021". Metro Rail News. Retrieved 4 May 2019.
  12. ^ "BMRCL Tenders". tenderb.bmrc.co.in. Retrieved 8 September 2020.
  13. ^ "Delhi-based firm gets Namma Metro's Hebbagodi depot contract | Bengaluru News". Times of India. Retrieved 19 December 2020.