Baihetan Dam: Difference between revisions
8,000 MW operational as of may 2022 |
Change tense from future to present Tags: Visual edit Mobile edit Mobile web edit |
||
Line 38: | Line 38: | ||
== Power generation == |
== Power generation == |
||
The facility |
The facility generates power by utilizing 16 [[water turbine|turbines]], each with a generating capacity of {{nowrap|1.0 [[Gigawatt|GW]]}}, taking the generating capacity to {{nowrap|16,000 MW}}.<ref>{{Cite web|url=http://www.dongfang.com/data/v/201507/4714.html|title=中国东方电气集团有限公司|website=www.dongfang.com}}</ref> In terms of generating capacity, it is the second largest [[hydroelectric]] power plant in the world, after the [[Three Gorges Dam]].<ref>{{Cite web|title=环保部审批金沙江白鹤滩水电站环境影响报告书(附文) - 北极星水力发电网|url=http://news.bjx.com.cn/html/20151202/687530.shtml|access-date=2020-12-17|website=news.bjx.com.cn}}</ref> |
||
== Construction == |
== Construction == |
Revision as of 01:52, 24 October 2022
Baihetan Dam | |
---|---|
Official name | 白鹤滩大坝 |
Coordinates | 27°13′07″N 102°54′22″E / 27.21861°N 102.90611°E |
Construction began | 2017 |
Opening date | July 2022 |
Construction cost | CN¥220 billion[1] |
Dam and spillways | |
Type of dam | double-curvature arch dam |
Impounds | Jinsha River |
Height | 289 metres (948 ft)[2] |
Width (crest) | 13 metres (43 ft) |
Width (base) | 72 metres (236 ft) |
Reservoir | |
Total capacity | 17,924,000,000 m3 (14,531,223 acre⋅ft)[3] |
Power Station | |
Turbines | 16 × 1,000 MW |
Installed capacity | 8,000 MW (operational) 8,000 MW (under construction) |
Annual generation | 60.24 TWh[4] |
The Baihetan Dam (simplified Chinese: 白鹤滩大坝; traditional Chinese: 白鶴灘大壩; pinyin: Báihètān Dàbà) is a large hydroelectric dam on the Jinsha River, an upper stretch of the Yangtze River in Sichuan and Yunnan provinces, in the southwest of China. The dam is a 289 m tall double-curvature arch dam with a crest elevation of 827 m, and a width of 72 m at the base and 13 m at the crest.[4] It is considered the last large hydropower project in China to be completed since a series of projects starting with the Three Gorges Dam,[5] the third largest dam in China and the fourth in the world, in terms of dam volume.
Power generation
The facility generates power by utilizing 16 turbines, each with a generating capacity of 1.0 GW, taking the generating capacity to 16,000 MW.[6] In terms of generating capacity, it is the second largest hydroelectric power plant in the world, after the Three Gorges Dam.[7]
Construction
Surveying of the dam site was done in 1992.[8] The dam was originally scheduled to be constructed between 2009 and 2018.[9] Actual construction started in 2017.[10] The reservoir started filling in April 2021, with the dam to start partial electricity generation in July of the same year. By July 2022, the dam should be fully operational.[11] Experts have noted the 4-year construction period as being exceptionally fast for a project of its type.[12]
On June 28, 2021, the Baihetan Dam began generating electricity, when the project's first two turbines started operating.[13] The third turbine followed in July and the fourth in November.[14]
Impact
The dam and reservoir have particularly affected upstream Qiaojia County, providing thousands of jobs to local residents, while also requiring resettlement of 32 villages totaling 50,178 residents. Coinciding with the dam construction, the road network was also improved.[15][16]
See also
- Wudongde Dam, the next dam upstream
- Xiluodu Dam, the next dam downstream
- List of power stations in China
- List of largest power stations
References
- ^ Xie, Echo (28 June 2021). "China turns on world's first giant hydropower turbines". South China Morning Post. Retrieved 6 July 2021.
- ^ "Baihetan Hydropower Project, China - World's second biggest power plant".
- ^ "Baihetan Hydropower" (in Chinese). Baihetan. Archived from the original on 19 April 2014. Retrieved 23 August 2011.
- ^ a b "Baihetan Hydropower Project". CWE. Archived from the original on 2016-03-02. Retrieved 2016-02-20.
- ^ "China's Era of Mega-Dams Is Ending as Solar and Wind Power Rise". Bloomberg.com. 2020-07-03. Retrieved 2021-04-09.
- ^ "中国东方电气集团有限公司". www.dongfang.com.
- ^ "环保部审批金沙江白鹤滩水电站环境影响报告书(附文) - 北极星水力发电网". news.bjx.com.cn. Retrieved 2020-12-17.
- ^ Chen, Houqun; Wu, Shengxin; Dang, Faning (2015-11-10). Seismic Safety of High Arch Dams. Elsevier. ISBN 978-0-12-803627-3.
- ^ "A Brief History of Hydropower Development Baihetan" (in Chinese). Baihetan China - Ningxia County Public Information Network. 2 December 2009. Archived from the original on 23 August 2011. Retrieved 20 March 2011.
- ^ "巧家政府网-巧家县人民政府门户网站". www.qiaojia.gov.cn. Retrieved 2020-12-17.
- ^ "New mega hydropower station to begin operations - China.org.cn". www.china.org.cn. Retrieved 2021-04-09.
- ^ "How China built the world's largest arch dam in just four years". South China Morning Post. 2021-03-16. Retrieved 2021-04-09.
- ^ "China starts Baihetan hydro project, biggest since Three Gorges". Reuters. 28 June 2021.
- ^ "白鹤滩水电站4号机组投运 左岸机组投产发电任务完成过半_四川在线". sichuan.scol.com.cn. Retrieved 2021-12-05.
- ^ "白鹤滩水电站巧家库区5万多移民陆续搬新家". m.yunnan.cn. Retrieved 2022-03-03.
- ^ "巧家县:一个因白鹤滩水电站而巨变的县城". www.ztnews.net. Retrieved 2022-03-03.