Jump to content

Jakarta–Serpong Toll Road: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Tags: Mobile edit Mobile web edit
Rescuing 1 sources and tagging 0 as dead. #IABot (v1.3beta6)
Line 26: Line 26:


==Fee==
==Fee==
Fees are charged in Rupiah as regulated by Minister of Public Work Act No. 514/KPTS/M/2009 31 August 2009 in the table shown below.<ref>http://www.bpjt.net/website/main.php?stateid=jartol&parentid=4&pageid=12&strlang=id{{dead link|date=September 2016}}</ref>
Fees are charged in Rupiah as regulated by Minister of Public Work Act No. 514/KPTS/M/2009 31 August 2009 in the table shown below.<ref>{{cite web|url=http://www.bpjt.net/website/main.php?stateid%3Djartol%26parentid%3D4%26pageid%3D12%26strlang%3Did |title=Archived copy |accessdate=2009-12-26 |deadurl=yes |archiveurl=https://web.archive.org/web/20090925190132/http://www.bpjt.net/website/main.php?stateid=jartol&parentid=4&pageid=12&strlang=id |archivedate=2009-09-25 |df= }}</ref>
{| class="wikitable" border="1"
{| class="wikitable" border="1"
|-
|-

Revision as of 14:50, 17 April 2017

Jakarta–Serpong Toll Road
Route information
Maintained by PT Jasa Marga (Persero) Tbk & PT Nusantara Infrastructure Tbk
Length12 km (7.5 mi)
Major junctions
Northeast endUlujami
Major intersectionsJakarta Outer Ring Road
Jakarta Outer Ring Road 2 (Planned)
Serpong-Balaraja Toll Road (Planned)
Southwest endSerpong
Location
CountryIndonesia
Major citiesSouth Tangerang
Highway system

Jakarta-Serpong toll road is a toll road connecting South Tangerang (mainly BSD City and Bintaro Jaya) and Jakarta. The length of the toll road is 13.5 Kilometres (8.4 miles). The toll road was built by Indonesia's largest toll road company, PT. Jasamarga Tbk.

Bintaro-BSD Toll Road at Dusk

It is divided into two parts which operated now and other parts planned. The first part is from Ulujami to Pondok Ranji which is owned and operated by PT Jasamarga Tbk, whereas the second part lies from Pondok Ranji to Serpong. This part is owned by PT Bintaro Serpong Damai (BSD) but operated by PT Jasamarga (Persero) Tbk. From Ulujami to Serpong, there are 3 exits, the first being the main Pondok Ranji toll gate, the second being East BSD, and last being Serpong. From Serpong to Ulujami, 3 exits are available. First is East BSD, second is West Pondok Ranji Toll Gate, the last is Bintaro sector 3. Another part of this highway will be built soon. The third part is from Rawabuntu to Malang Nengah, whereas the fourth part lies from Malang Nengah to Citra Raya and the fifth part lies from Citra Raya to Pasar Kemis. From Pasar Kemis, the toll road will continue until Soekarno–Hatta International Airport, passing Sepatan & Teluk Naga. On April 19, 2012 afternoon till night, the BSD toll road around Pondok Ranji was flooded with 80 centimeters of water from the Deker River. This caused a heavy traffic jam until the flood receded.[1]

Fee

Fees are charged in Rupiah as regulated by Minister of Public Work Act No. 514/KPTS/M/2009 31 August 2009 in the table shown below.[2]

No. Entry Exit Group I Group II Group III Group IV Group V
1 Serpong Pondok Aren 4500 8000 9500 11500 14000
2 Ulujami Pondok Aren 2500 4500 5000 6500 7500

Routes

KM Exit Interchange Jakarta To Serpong Serpong To Jakarta Remarks
0 Ulujami Interchange Entry from
Jakarta Outer Ring Road
North
Kebon Jeruk
South East
Pondok Indah
Exit to
Jakarta Outer Ring Road
North
Kebon Jeruk
Jakarta Outer Ring Road
Jakarta–Serpong Toll Road
1 DKI Jakarta Province Border
South Jakarta City Border
1 Banten Province Border
South Tangerang City Border
3 ? Jalan Bintaro Utama 1 Entry from
Bintaro Jaya Sector 3
Exit to
Bintaro Jaya Sector 3
5 Pondok Ranji Toll Gate
Pay Toll
Cash
Opened Toll System
5 ? Jalan Bulevar Bintaro Jaya Exit to
Pondok Ranji
Bintaro Jaya Sector 7
Entry from
Pondok Ranji
Bintaro Jaya Sector 7
Trumpet interchange
6 ? Jalan Tegal Rotan Entry From
Pondok Aren
Bintaro Jaya Sector 7
Ciputat
Exit to
Pondok Aren
Bintaro Jaya Sector 7
Ciputat
Half diamond interchange
? Jakarta–Serpong Toll Road
PT Jasa Marga limit
? Jakarta–Serpong Toll Road
PT Bintaro Serpong Damai limit
10 ? Jalan Letnan Sutopo Exit to
BSD City
Ciater
Entry from
BSD City
Ciater
Half cloverleaf interchange
12 ? Jalan Kapten Soebiano Djohohadikusumo Exit to
BSD City
Serpong
Entry from
BSD City
Serpong
12 Jakarta–Serpong Toll Road
PT Bintaro Serpong Damai limit
12 Serpong-Balaraja Toll Road (planned)

Exits

Exit KM Destination
Ulujami Interchange 00 Jakarta Outer Ring Road
Pondok Ranji 05 Main Toll Gate
Pondok Aren 05 Pondok Aren, Bintaro, Ciputat
Serpong 10 Serpong, Pamulang, Ciputat
Serpong 12 Serpong, Tangerang, Parung

West:
Serpong
Parung
East:
BSD City
Jelupang
Tangerang

See also

References

  1. ^ "Banjir di Tol BSD, Kemacetan Mengular Hingga 15 Km". Media Indonesia. April 19, 2012. Archived from the original on 2012-04-26.
  2. ^ "Archived copy". Archived from the original on 2009-09-25. Retrieved 2009-12-26. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)CS1 maint: archived copy as title (link)