Segamat railway station
| Inter-city rail station | ||||||||||||||||
General information | ||||||||||||||||
Location | Segamat, Segamat District Johor Malaysia | |||||||||||||||
Coordinates | 2°30′25″N 102°48′51″E / 2.50698°N 102.81412°E | |||||||||||||||
Owned by | Railway Assets Corporation | |||||||||||||||
Operated by | Keretapi Tanah Melayu | |||||||||||||||
Line(s) | West Coast Line | |||||||||||||||
Platforms | 2 side platforms | |||||||||||||||
Tracks | 2 | |||||||||||||||
Connections | Local transportation | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated | |||||||||||||||
Parking | Available, free. | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Status | Reopened as new station on 14 May 2024 | |||||||||||||||
History | ||||||||||||||||
Opened | 1909 (Reopened on 14 May 2024) | |||||||||||||||
Opening | 14 May 2024 (new station) | |||||||||||||||
Closed | 28 April 2021 | (old station)|||||||||||||||
Rebuilt | 1 June 2023 | (completed)|||||||||||||||
Electrified | Yes | |||||||||||||||
Services | ||||||||||||||||
|
The Segamat railway station is a Malaysian train station located at and named after the town of Segamat, Segamat District, Johor.
This station provides KTM Intercity train services. Adjacent to the railway station is the bus & taxi terminal.
KTM ETS train services to Padang Besar and Butterworth will be extended to the new station on 1 July 2024.
History
The station was first built in 1909 when the West Coast Line was extended from Gemas to Segamat. In 1924, the station was reconstructed with a bigger building at the same place.
The old station ceased operations on 28 April 2021 and was temporarily transferred to the Segamat Temporary Railway Station located 3.7 km (2.3 mi) away. The old station will be demolished to make way for a new station to be constructed as part of the Gemas-Johor Bahru Double Tracking and Electrification Project.[1] As of October 2023, the new station building had already been completed with KTMB testing the station's internal and external lighting, passenger announcement and information systems, as well as the station's signalling.
Railway operations were transferred from the temporary station to the new station when it was opened at 7:00am on 15 May 2024.[2]
Around the station
- Pejabat Penerangan Daerah Segamat
- Kilometre Zero (KM0) Monument of Segamat
- Segamat Roundabout
- Segamat Bus and Taxi Terminal and Bazaar
- Segamat Central Mall(Formerly UO)
References
- ^ Zain, Nabilah (3 May 2021). "Operasi Stesen Keretapi Segamat Ditamatkan" [Segamat Railway Station Operation Ended]. Sintok News (in Malay). Retrieved 20 October 2021.
- ^ Tan, Danny (15 May 2024). "New KTM Segamat station starts operations today". Paultan.org. Retrieved 23 May 2024.
External links