Zhengzhou subway flooding

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Hanyangprofessor2 (talk | contribs) at 08:46, 14 June 2024 (Hanyangprofessor2 moved page Zhengzhou Metro Line 5 Flooding Incident to Zhengzhou subway flooding: simpler name). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Zhengzhou subway flooding
Details
DateJuly 20, 2021 (2021-07-20)
Time in China Around 18:00(Coordinated Universal Time10:00)
Location People's Republic of ChinaHenanZhengzhou
Zhengzhou MetroLine 5
Beach Temple Station and Shakou Road
CountryChina
LineLine 5 (Zhengzhou Metro)
OperatorZhengzhou Metro Group Co
Incident typeFlooding Incident
Cause2021 Henan floods
Statistics
Trains1
Passengers967
Deaths14
Injured5

The Zhengzhou Metro Line 5 flooding incident refers to the severe flooding that occurred on Zhengzhou Metro Line 5 on July 20, 2021, during a heavy rainstorm. Despite the weather, the metro line continued to operate, and rainwater broke through the retaining wall of the Wulongkou parking lot, flooding the train tunnel. Official reports from the government stated that the incident resulted in 14 deaths and 5 injuries.[1] However, the death toll has been widely questioned because the trains were covered with black cloth during the subsequent search and rescue operations, preventing the inspection of their interiors.

Background

Since July 17, 2021, continuous heavy rainfall has caused flooding in various locations in Henan Province, People's Republic of China, including Zhengzhou, Luohe, Kaifeng, Xinxiang, Hebi, and Anyang. Zhengzhou experienced a record-breaking maximum hourly rainfall of 201.9 mm, the highest since meteorological records began.[2] Nineteen weather stations, including Zhengzhou, recorded their highest daily rainfall totals ever.[3] According to the China Meteorological Administration, the main reason for the heavy rain was Typhoon In-fa and the subtropical high pressure system continuously directing a large amount of water vapor to the mainland. This moisture was uplifted by the terrain, such as the Taihang Mountains, leading to heavy rainfall and subsequent flooding in Henan.[4]

Zhengzhou Metro Line 5, which opened in May 2019, is a loop line and was the longest and busiest line in the Zhengzhou metro system at the time of the incident. The affected section (Yueji Park—Shakou Road—Haitansi) crosses Zhengzhou North Station. Zhengzhou North Station, known as "Asia's largest marshalling yard," is quite extensive, and the tunnel passes through this station at a considerable depth. The tunnel between the stations has a topography where the sides near the stations are higher, and the middle is lower. This results in trains descending when leaving a station and ascending when entering one, which is energy-efficient.[5]

According to a regulatory document issued by the Ministry of Transport of the People's Republic of China on October 16, 2019, titled "Urban Rail Transit Operation Management Measures" (Transport Regulation [2019] No. 14), Article 32 stipulates: In case of severe weather, relevant personnel can take measures such as enhancing surveillance, limiting speed, halting operations, or closing stations. If rainfall or flooding causes water to enter the station, severely affecting passenger services, dispatchers can issue a station closure order based on the station's application and organize train bypasses. Trains must not pass if water levels on the track exceed the rail surface.[6]

Incident

The entrance and exit line of Wulongkou parking lot, where accumulated water breaks through the retaining wall and enters the tunnel

On July 16, 2021, heavy rain began to hit Zhengzhou. From 14:00 on July 19 to 14:00 on July 20, the average rainfall in Zhengzhou reached 253 millimeters.[7] The heavy rain caused multiple stations and tunnels of the Zhengzhou Metro to flood. At 18:10 on the 20th, the entire Zhengzhou Metro network ceased operations, and a full evacuation of passengers was ordered. [8]At that time, the water depth in the Wulongkou Parking Lot of Zhengzhou Metro Line 5 was close to 2 meters.[9]

Around 18:00, floodwaters broke through the retaining wall at the entrance and exit lines of Wulongkou Parking Lot, entering the running tunnel between Shakou Road Station and Haitansi Station on Line 5. Simultaneously, train number 0501 made an emergency stop in the outer circle direction tunnel between Shakou Road Station and Haitansi Station.[10] Passengers soon noticed water accumulating on the tracks. After a period, train 0501 attempted to return to Haitansi Station but got trapped in a low-lying section of the tunnel.[11] Water began to flood the train, with water levels outside the train higher than inside. The water level rose above passengers' chests, reaching as high as their necks at its peak. Some passengers called the mayor's hotline, and others began recording video wills. Unfortunately, some passengers in the rear carriages drowned before being rescued.[12] Staff attempted to open the train doors to evacuate passengers, but the water outside was higher than inside, leaving no escape route, and they had to close the doors again.[11]

Rescue efforts

At around 18:00 on the 20th, the Zhengzhou Fire and Rescue Brigade received a report about the trapped train. Upon arriving at the scene, they guided passengers to safety by setting up a rope ladder. Metro employees, emergency rescue teams, police officers, soldiers from the People's Liberation Army, and volunteer rescue teams all participated in the on-site rescue operations.[12] More than 500 people were rescued, among whom 12 died despite rescue efforts and 5 were injured.[8] Some individuals went missing and were not found immediately.[13] The Henan Provincial Government and the Zhengzhou Municipal Government established a special task force to organize search and rescue operations, emergency drainage, and risk mitigation. On the afternoon of July 24 and at 6:30 a.m. on July 25, rescuers found the bodies of two missing passengers. As of the morning of the 27th, no new bodies had been discovered.[1]

Follow-up events

On July 21, 2021, the Ministry of Transport of the People's Republic of China issued an emergency notice, instructing rail transit operators to learn from the recent flooding incidents. The notice called for the adjustment and improvement of emergency plans, including measures such as suspending train operations, evacuating passengers, and closing stations in extreme conditions exceeding design rain intensities. Additionally, the notice emphasized better communication with meteorological departments and strengthened information gathering on flooding and weather disasters. The Ministry specifically stressed that in case of flooding or similar emergencies, operators must strictly follow the "Urban Rail Transit Operation Management Regulations" and suspend operations if safety cannot be ensured.[14]

Yu Yifei, a new trainee at Zhengzhou People's Hospital, was trapped during the severe flooding incident on Zhengzhou Metro Line 5. Being near the carriage exit, he was rescued earlier. Upon reaching the metro exit, he heard many citizens calling for help from behind and decided to return. From that evening until night, Yu Yifei performed CPR continuously for six hours, saving more than ten people. On July 22, in recognition of his actions, Zhengzhou People's Hospital decided to waive his probation period and directly hire him as a full-time employee.[15]

On the evening of July 22, relatives of missing passengers entered the station accompanied by the police to search for their loved ones but found nothing.[16] On July 23, officials from the Zhengzhou Municipal Government, Zhengzhou Health Commission, and Zhengzhou Metro Group held a meeting with the families of the nine confirmed deceased at the Ninth People's Hospital of Zhengzhou. During the meeting, the identities of the nine victims were confirmed. The officials expressed their deep sorrow and informed that the main leaders of Zhengzhou had instructed to expedite the investigation and follow-up actions, with the results to be publicly disclosed.[17]

The entrance and exit of Shakou Road Station are piled with flowers to mourn the victims

After the incident, the official website of Zhengzhou Metro turned black and white on the morning of July 21.[18] Many Zhengzhou citizens and witnesses placed flowers at the incident station to mourn the victims.[11][19] On the seventh day after the incident, the sidewalk in front of Shakou Road Station was piled with flowers left by mourners.[20] Subsequently, the station entrances were surrounded by 1.7-meter-high barriers enclosing the flowers placed on the ground. Later mourners placed flowers outside the barriers.[21] The next day, the barrier directly facing the entrance was removed.[22][23] On the morning of July 30, Zhengzhou Metro Group held a brief memorial ceremony for the victims at Shakou Road Station and set up a memorial area in a nearby factory yard with free flowers for the public to pay their respects.[24]

On August 2, at a flood prevention and disaster relief press conference in Henan Province, then-mayor of Zhengzhou, Hou Hong, confirmed that 39 people had drowned in underground spaces such as basements, garages, and underground pipelines during the Zhengzhou heavy rain, including 14 victims from Metro Line 5.[25] On the same day, following instructions from Premier Li Keqiang and relevant laws and regulations, the State Council of the People's Republic of China established an investigation team for the "7·20" Zhengzhou catastrophic rainstorm disaster, led by the Ministry of Emergency Management.[26]

Investigation

On January 21, 2022, the State Council investigation team released the "Investigation Report on the '7.20' Catastrophic Rainstorm Disaster in Zhengzhou." The report identified the fatalities on Metro Line 5 as "a responsibility incident caused by extreme rainstorms leading to severe urban flooding. The floodwater destroyed the water barrier wall of the Wulongkou parking lot and inundated the metro tunnel. The Zhengzhou Metro Group Co., Ltd. and relevant parties responded inadequately, mismanaged train operations, illegally altered the Wulongkou parking lot design, and failed to ensure the quality of the water barrier wall construction, resulting in significant casualties." The investigation team identified the following issues:[27]

  1. Inadequate Response. Zhengzhou Metro Group failed to take timely pre-warning actions. Multiple sections of Metro Line 5 were flooded in the afternoon, but it was not taken seriously until 18:04 when the train lost power supply, leading to the suspension of the entire network. Passenger evacuation was forcibly interrupted at 18:37, but the metro operation sub-company reported to the headquarters one hour later, delaying the rescue efforts.
  2. Train Operation Command and Dispatch Errors. After floodwater entered the metro tunnel, a train was held at Haitansi Station but was later allowed to proceed. When the water reached the track surface, the driver stopped the train, but the dispatcher ordered the train to reverse. Shortly after, the train lost power and was forced to stop, causing the water level inside the train to rise.
  3. Illegal Design and Construction. Unauthorized Design Changes: The metro company altered the design to accommodate property development by relocating the Wulongkou parking lot to a low-lying area without proper approval. Substandard Water Barrier Wall: The construction unit used temporary barriers instead of a new wall on the western section of the parking lot, which had almost no water-blocking function. Severely Impaired Drainage Function: The drainage function near the Wulongkou parking lot was significantly compromised. The construction debris from the road on the west side of the open ditch was not cleared, obstructing drainage; additionally, some parts of the open ditch were covered, reducing its water collection capacity.

The responsible individuals, including Wei Ping'an, the project leader for the Wulongkou parking lot construction of Zhengzhou Metro Line 5 from Zhengzhou Metro Group Co., Ltd., and Wang Peng, the project leader of Zhengzhou Metro Line 5 from Beijing Urban Construction Design & Development Group Co., Ltd., were investigated and arrested by the public security authorities for major engineering safety accident crimes and major responsibility accident crimes. Ren Ligong, Party Secretary and Director of the Zhengzhou Emergency Management Bureau; Zhao Yuncheng, Deputy General Manager, Chief Engineer, and Head of the Technical Management Department of Zhengzhou Metro Group Co., Ltd.; and Sun Hongliang, Deputy Section Chief of the Rail Transit Section of the Zhengzhou Construction Quality Supervision Station, were investigated by the disciplinary inspection and supervision agencies and subjected to retention measures for serious disciplinary and legal violations. Additionally, Hou Hong, Deputy Secretary of the Zhengzhou Municipal Committee of the Chinese Communist Party and Mayor, received a serious intra-Party warning and was demoted in administrative rank. Wu Fumin, a member of the Party Leadership Group and Deputy Mayor of the Zhengzhou Municipal Government, was dismissed from his Party and administrative positions. Li Xian and Chen Hongwei, members of the Party Leadership Group and Deputy Mayors of the Zhengzhou Municipal Government, received major demerits in administrative discipline. Other related responsible persons were also subjected to Party and administrative disciplinary actions or admonitions.[28][29]

Controversies

Delayed Suspension of Operations

In response to public concerns about the delayed suspension of operations on the Zhengzhou Metro, the Director of the Safety Department of Zhengzhou Metro Group stated, "For citizens, the metro is the only hope of getting home during severe weather." He mentioned that the goal was to avoid suspension of operations, with ongoing efforts to pump out water and reinforce barriers until 18:00 when they could no longer manage. He also noted that the decision to suspend operations was made by the operating division of the metro company but required approval from the Transportation Commission and the Emergency Management Bureau.[30] A metro operations employee from a southern province of China, interviewed by Southern Weekly, indicated that there is a mechanism for suspending metro operations during heavy rain, but it takes time and often requires approval from higher authorities because "suspension is a social event".[31] Another metro industry professional, interviewed by Duowei News, argued that while natural disasters occur, human error was the primary cause. He criticized the decision-makers for their lack of understanding of the situation and slow response, stating that there were multiple opportunities to address the flooding before it became life-threatening.[32]

Train Design Flaws

Metro trains usually have emergency escape doors located at both ends, which, when manually opened, deploy a rescue ladder for passengers to escape through the tracks. Most metro trains in mainland China have this design, but Zhengzhou metro trains do not. Since the launch of Zhengzhou Metro Line 1 in 2012, the absence of escape doors has been controversial. Zhengzhou Metro Group argued that instead of escape doors, they had installed parallel evacuation platforms in the tunnels, allowing passengers to directly evacuate through the train doors, which they claimed to be "more scientific, reasonable, and humane".[33]

According to the China Business Journal, public transport researcher Meng Yi suggested that the lack of escape doors on Zhengzhou metro trains made rescue operations more difficult. He argued that more evacuation channels lead to faster evacuations. The escape door design also helps with air circulation and balancing water pressure inside and outside the train during emergencies, preventing suffocation. During the flooding, the train's buoyancy and movement could have damaged the evacuation platforms, while derailed trains might have blocked these platforms, hindering evacuation. Other urban rail transit researchers believe that having both escape doors and evacuation platforms would provide better emergency evacuation options. Additionally, the sliding doors on Zhengzhou Metro Line 5 trains require outward pushing to open, which becomes difficult under high water pressure in the tunnel.[34]

Drainage Conditions Around Wulongkou Parking Lot

According to Jiemian News, the flooding at Wulongkou parking lot and surrounding areas was not accidental, as this area was known for waterlogging issues even ten years ago. After some improvements, the situation had somewhat bettered. The base of the brick wall at Wulongkou parking lot was higher than the entrance of the open ditch opposite the road. Under normal circumstances, floodwaters should first flow into the ditch and be discharged. During heavy rain, excess water would overflow the roadbed into the ditch, eventually flowing into the Jialu River and the Huai River. However, before this storm, several dozen meters of concrete cover had been added to the open ditch, converting it into an underground river and obstructing drainage.[35]

Passengers Forced to Self-Rescue

According to Henan Business Daily, Mr. Zong, the husband of a trapped passenger, received a call from his wife around 6 p.m. on the 20th, saying that the train stopped near Shakoulu Station, and water was seeping into the carriage. Zong immediately ran to Shakoulu Station, which was four metro stations away. By 7:30 p.m., his wife informed him that the water in the carriage was up to her neck. Zong encountered flood control personnel on his way and requested to be taken to Shakoulu, but was refused with the explanation that they were "performing a task" and advised to call the fire department or mayor's hotline. Eventually, Zong got onto a city management vehicle, and while on the way, his wife mentioned she was starting to suffocate. When he arrived at Shakoulu Station, staff at the entrance initially refused him entry, claiming there was no one in the carriage. Zong then made a video call to his wife to show the staff the emergency, but they still denied entry. He had to force his way in. He mentioned that before he arrived, the staff on the second basement level were unaware of the critical situation in the carriage. Meanwhile, passengers in the carriage began breaking windows to self-rescue, and Zong's wife eventually made it back to the platform safely.[36]

Obstructed Public Mourning

On July 26, the seventh day after the tragic flooding on Zhengzhou Metro Line 5, many citizens spontaneously went to the entrance of Shakoulu Station to lay flowers in memory of the victims. However, the entrance was surrounded by a 1.7-meter-high barrier, confining the flowers laid by mourners. Later mourners placed flowers outside the barrier.[21] The following day, the barrier directly facing the entrance was removed, allowing citizens to continue laying flowers[22][23]. Regarding the barrier, Zhengzhou Metro told Urban Express that they were verifying who erected it and would provide details through their official account.[23]

According to Radio France Internationale, on July 26, Chen Liang, a photographer from Caixin Media, was detained by police after photographing people laying flowers at the metro entrance. Another Caixin journalist, Wang Heyan, first reported this incident. Meanwhile, Southern Metropolis Daily journalist Chen Chong was asked by police to delete photos of the flower-laying scene but later restored them at his hotel. On July 28, at Shakoulu Station, a young man from Xi'an using a UAV to film the flower tribute was beaten by unidentified individuals, but local citizens intervened to recover his equipment. Video footage showed people questioning why the young man was not allowed to film and why the truth could not be revealed to the public.[37]

On the first anniversary of the 2021 Henan floods in July 2022, despite the absence of official commemorative events, many citizens laid flowers near the metro station and Jingguang Road Tunnel, where the flooding occurred, to mourn the victims. On Chinese social media, images and videos related to the commemoration were removed or blocked, and the Weibo topic "#One Year Anniversary Of The Henan Zhengzhou 720 Catastrophic Rainstorm" and related images were censored. Several flower shop owners reported being questioned by authorities while delivering flowers, and some flower arrangements were removed shortly after being placed.[38][39][40]

See also

Reference

  1. ^ a b Zhang, Bing (2021-07-27). "郑州地铁5号线"7·20事件"中有14人不幸遇难 名单公布!" [The list of 14 unfortunate deaths in the 7.20 incident on Zhengzhou Metro Line 5 has been announced!]. m.news.cctv.com. Retrieved 2024-06-04.
  2. ^ Chen, Jianhui (2021-07-20). "郑州气象局:郑州特大暴雨千年一遇,三天下了以往一年的量" [Zhengzhou Meteorological Bureau: The extreme rainstorm in Zhengzhou is a once-in-a-millennium event, with three days of rainfall equivalent to the usual annual total.]. www.thepaper.cn. Retrieved 2024-06-04.
  3. ^ "河南:19个国家级气象站日降水量突破建站以来历史日极值" [Henan: Daily precipitation of 19 national level meteorological stations has exceeded historical daily extremes since the establishment of the stations]. www.jiemian.com. 2021-07-21. Retrieved 2024-06-04.
  4. ^ Zhang, Lin (2021-07-21). "解读:雨到底多大?还要下多久?五问河南极端强降雨" [Interpretation: How much rain is it? How much longer will it take? Five Questions on Extreme Heavy Rainfall in Henan Province]. web.archive.org. Retrieved 2024-06-04.
  5. ^ Li, Xiuli; Wang (2021-07-21). "郑州地铁5号线:为什么乘客被困两站之间?" [Zhengzhou Metro Line 5: Why are passengers trapped between two stations?]. Sanlian Lifeweek.
  6. ^ State Council Communique of the People's Republic of China (2019-10-16). "交通运输部关于印发《城市轨道交通行车组织管理办法》的通知_2020年第4号国务院公报_中国政府网" [Notice of the Ministry of Transport on Issuing the Measures for the Organization and Management of Urban Rail Transit Operations (Jiao Yun Gui [2019] No. 14, October 16, 2019)]. web.archive.org. Retrieved 2024-06-14.
  7. ^ Tian, Meng; Zhao, Lei; Ping, Fan; Zhao, Kunxian; Fan, Bingshan (2021-07-20). "河南持续强降雨 郑州启动防汛应急Ⅰ级响应". m.news.cctv.com. Retrieved 2024-06-07.
  8. ^ a b Mayerhaba (2021-07-21). "罕见暴雨致郑州地铁全线停运 12人死亡" [A rare rainstorm caused 12 deaths due to the suspension of the whole Zhengzhou subway line]. CCTV-13.
  9. ^ Li, Hao; Hu, Yuwei (2021-07-21). "武警参与郑州地铁轨道淤泥清理工作" [Armed Police Participate in Zhengzhou Metro Track Mud Cleaning Work]. Global Times.
  10. ^ Li, Xiuli; Wang, Haiyan (2021-07-21). "郑州地铁5号线:为什么乘客被困两站之间?" [Zhengzhou Metro Line 5: Why are passengers trapped between two stations?]. Sanlian Lifeweek.
  11. ^ a b c Zheng, Yuxin (2021-07-21). "郑州地铁五号线亲历者:真的很可怕" [Experiencers of Zhengzhou Metro Line 5: It's really scary]. The Economic Observer.
  12. ^ a b Geng, Xueqing; Yang, Jie; Lin, Zilu; Gong, Ayuan (2021-07-24). "0501号地铁没有终点" [Subway 0501 has no endpoint]. China Youth Daily.
  13. ^ Zeng, Lingke; Liu, Qin (2021-07-21). "丈夫寻妻一天一夜后获噩耗,郑州地铁5号线有乘客至今失联" [After a day and night of searching for his wife, the husband received bad news that a passenger on Zhengzhou Metro Line 5 has been lost to this day]. Chutian Metropolis Daily.
  14. ^ Tang, Jun (2021-07-21). "交通部紧急通知:地铁淹水倒灌时,不具备安全运行条件的应坚决停运" [Urgent notice from the Ministry of Transportation: When the subway is flooded and backfilled, those that do not meet the conditions for safe operation should be resolutely shut down]. Jiemian News.
  15. ^ Xie, Yanpeng (2021-07-24). "免试用期!郑州地铁逆行救人的试工医生被直接录用" [No probation period! The trial doctor for rescuing people in the reverse direction of Zhengzhou Metro has been directly hired]. CCTV-13.
  16. ^ Pan, Junwen (2021-07-23). "郑州地铁5号线6名失联者家属在警方陪同下进入地铁站寻人:对着隧道呼喊,没有回应". Chengdu Economic Daily.
  17. ^ Lv, Xinwen; Feng, Yinlun; Wu, Qi; Geng, Siyu; Chen, Yiran (2021-07-23). "亲属讲述郑州地铁五号线9位遇难者失联前最后一刻" [Relatives recount the last moment before the 9 victims of Zhengzhou Metro Line 5 were lost to each other]. The Paper (newspaper).
  18. ^ Li, Guo (2021-07-21). "郑州地铁官网页面换为黑白色,暴雨致乘客12死5伤" [The official website of Zhengzhou Metro changed to black and white, and 12 passengers were killed and 5 injured in rainstorm]. 21st Century Business Herald.
  19. ^ Chang'an Street Governor (2021-07-27). "哀悼!郑州地铁5号线事故遇难者名单公布,市民为遇难者献花吊唁" [Mourning! The list of victims of the Zhengzhou Metro Line 5 accident has been announced, and citizens offer flowers as condolences to the victims]. Beijing Evening News.
  20. ^ Du, Jiangqian; Liu, Hu; Yang, Jiyue; Liang, Jiaqi (2021-07-28). "郑州大雨七日后: 地铁五号线外鲜花成路 亲历者现身送别" [Seven days after heavy rain in Zhengzhou: Outside Line 5 of the subway, flowers bloom on the road, and visitors show up to bid farewell]. West China City Daily.
  21. ^ a b Liu, Qin (2021-07-27). "愿天堂没有洪水!郑州地铁遇难者"头七",沙口路站摆满鲜花" [May heaven have no floods! The first seven victims of the Zhengzhou Metro are covered in flowers at Shakou Road Station]. Chutian Metropolis Daily.
  22. ^ a b Liu, Hu; Yang, Jiyue; Liang, Jiaqi; Yang, Feng; Guo, Jie; Chao, Fengju (2021-07-27). "郑州地铁5号线"7.20"事件致14人遇难 沙口路站围挡拆除学生献花吊唁" [14 people died in the Zhengzhou Metro Line 5 "7.20" incident. Shakou Road Station fence was dismantled, and students offered flowers as condolences]. Fengmian News.
  23. ^ a b c 网易 (2021-07-27). "橙柿现场:郑州市民为地铁遇难者献的花,为什么被围挡?郑州地铁方刚刚回应:具体是哪个部门竖的围挡还在核实中" [Orange Persimmon Scene: Why were the flowers presented by Zhengzhou citizens to the subway victims surrounded? Zhengzhou Metro just responded: The specific department that erected the fence is still being verified]. www.163.com. Retrieved 2024-06-07.
  24. ^ Li, Guigang; Li, Chaoqing (2021-07-30). "郑州地铁5号线设追思处 便利民众祭奠罹难者" [Zhengzhou Metro Line 5 has set up a memorial office to facilitate the public's memorial service for the victims]. China News Service.
  25. ^ Qu, Xiaoyan; Li, Hong (2021-08-02). "郑州暴雨因地下空间溺亡39人 包括京广路隧道6人" [39 people drowned in underground space due to rainstorm in Zhengzhou, including 6 in Jingguang Road Tunnel]. Henan Daily.
  26. ^ Qiu, Lifang (2021-08-02). "国务院成立河南郑州"7·20"特大暴雨灾害调查组" [The State Council established the "July 20" extremely heavy rainstorm Disaster Investigation Team in Zhengzhou, Henan]. Xinhua News Agency.
  27. ^ The Disaster Investigation Group of the State Council (2022-01-21). "Investigation Report on the '7.20' Catastrophic Rainstorm Disaster in Zhengzhou" (PDF). Archived from the original (PDF) on 2022-01-21.
  28. ^ Bai, Yu; Zhao, Xinyue (2022-01-21). "河南严肃查处郑州"7·20"特大暴雨灾害相关责任人 公安机关对8名涉案人员立案侦查并依法逮捕 纪检监察机关严肃问责89名公职人员" [Henan seriously investigated and dealt with the persons responsible for the "July 20" extremely heavy rainstorm disaster in Zhengzhou. The public security organ put 8 persons involved in the case on file for investigation and arrested 89 public officials held accountable by the discipline inspection and supervision organ according to law]. Xinhua News Agency.
  29. ^ "郑州市委正副书记因暴雨防灾不力被降级副市长被撤职" [The Deputy Secretary of the CPC Zhengzhou Municipal Committee was demoted due to poor rainstorm disaster prevention, and the Deputy Mayor was dismissed]. Lianhe Zaobao. 2022-01-21.
  30. ^ Li, Xi (2021-07-21). "网友质疑郑州地铁停运不及时,地铁公司安全部门:地铁是恶劣天气下市民回家的希望,我们一直在撑" [Netizens question the untimely suspension of the Zhengzhou subway. The safety department of the subway company says that the subway is the hope for citizens to go home in bad weather, and we have been supporting it]. www.163.com. Retrieved 2024-06-08.
  31. ^ Luo, Huanhuan; Jing, Yibu; Wang, Shiqi; Qiu, Wenxue (2021-07-21). ""大水如浪涌来",郑州地铁五号线的生死三小时" [The Three Hours of Life and Death of Zhengzhou Metro Line 5: "The Big Waters Rush Like Waves"]. Southern Weekly.
  32. ^ Lin, Jin (2021-07-27). "河南暴雨|遇难者妻子揭郑州地铁惨案背后细节 中国应急部警醒|多维新闻|中国" [Rainstorm in Henan | The Wife of the Victims Uncovers the Details Behind the Zhengzhou Metro Massacre China's Emergency Response Department Awakens]. web.archive.org. Retrieved 2024-06-08.
  33. ^ Li, Yichuan (2012-10-20). "郑州地铁未设逃生门 回应有疏散平台更利于逃生" [Zhengzhou Metro does not have an escape door, responding that having an evacuation platform is more conducive to escape]. Dahe Daily.
  34. ^ Huang, Yulu (2021-07-25). "专家详解郑州地铁事故:"200年一遇"标准破防 缺乏联动停运机制 列车无逃生门" [Expert's Explanation of Zhengzhou Metro Accident: "Once in 200 Years" Standard Breakthrough Lack of Linkage and Shutdown Mechanism Trains Without Escape Doors]. China Business Journal.
  35. ^ Zhao, Meng (2021-07-25). "【调查】重走郑州地铁5号线:积水区十年前上"黑榜",排水明沟变暗渠" [【 Investigation 】 Returning to Zhengzhou Metro Line 5: Ten years ago, the waterlogged area was listed as a "black list", and the drainage ditch became a hidden channel]. Jiemian News.
  36. ^ Wu, Xiaodong (2021-07-21). "郑州暴雨亲历者讲述:四个小时,我终于在地铁5号线里找到了妻子" [The person who experienced the rainstorm in Zhengzhou said: I finally found my wife in the subway line 5 after four hours]. Henan Business Daily.
  37. ^ Andre (2021-07-29). "鄭州咄咄怪事" [Zhengzhou's Bizarre Events]. Radio France Internationale.
  38. ^ "鄭州雨災一周年 傳當局禁賣花供市民悼念" [On the one-year anniversary of the Zhengzhou rain disaster, authorities have announced a ban on selling flowers for citizens to mourn]. on.cc東網 (in Chinese (Hong Kong)). 2022-07-21. Retrieved 2024-06-08.
  39. ^ 許祺安 (2022-07-21). "鄭州水災1周年|網民憶地鐵站獻花:近400生命,今祭奠也鴉雀無聲" [1st Anniversary of Zhengzhou Flood | Netizens Remembering Subway Station Flowers: Nearly 400 Lives, Today's Sacrifice is Silent]. 香港01 (in Chinese (Hong Kong)). Retrieved 2024-06-08.
  40. ^ "中国河南郑州水灾一周年:官方审查下仍有民众悼念逝者" [The First Anniversary of Floods in Zhengzhou, Henan, China: Under Official Review, People Still mourn the Past]. BBC News. 2022-07-21.