Jump to content

Aqua Line (Pune Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 101.108.249.25 (talk) at 18:04, 22 January 2021. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Aqua Line
Overview
StatusUnder Construction
LocalePune
Termini
Stations16
Service
TypeRapid Transit
SystemPune Metro
Operator(s)MahaMetro
Technical
Line length14.66 km (9.11 mi)
CharacterElevated
Route map

Vanaz
Mainline rail interchange Vanaz Depot
Anand Nagar
Ideal Colony
Nal Stop
Garware College
Deccan Gymkhana
Chhatrapati Sambhaji Udyan
PMC Bhavan
Civil Court
Mangalwar Peth
Pune Railway Station Pune Junction railway station
Ruby Hall Clinic
Bund Garden
Yerwada Rainbow Bus Rapid Transit System
Kalyani Nagar Rainbow Bus Rapid Transit System
Ramwadi Rainbow Bus Rapid Transit System

Aqua Line of the Pune Metro is the second line of the city's under-construction mass transit network. It will run from Ramwadi to Vanaz via Mangalwar Peth and Deccan Gymkhana.

Route

The elevated line will cover a distance of 14.66 km and will have 16 stations. It will connect with the Purple Line and Line 3 at the Civil Court interchange station. The maintenance depot for the Aqua Line will be located near the Vanaz station on the former garbage depot land.[1][2]

List of stations

Following is a list of stations on this route-

Aqua Line
# Station name Status Connections Layout
English Marathi
1 Vanaz वनाझ Under construction None Elevated
2 Anand Nagar आनंदनगर Under construction None Elevated
3 Ideal Colony आयडियल कॉलनी Under construction None Elevated
4 Nal Stop नळ स्टॉप Under construction None Elevated
5 Garware College गरवारे महाविद्यालय Under construction None Elevated
6 Deccan Gymkhana डेक्कन जिमखाना Under construction None Elevated
7 Chhatrapati Sambhaji Udyan छत्रपती संभाजी उद्यान Under construction None Elevated
8 PMC Bhavan पुणे महानगरपालिका भवन Under construction None Elevated
9 Civil Court सिव्हिल कोर्ट Under construction  Purple Line  &  Line 3  Elevated
10 Mangalwar Peth मंगळवार पेठ Under construction None Elevated
11 Pune Railway Station पुणे रेल्वे स्टेशन Under construction None Elevated
12 Ruby Hall Clinic रुबी हॉल क्लिनिक Under construction None Elevated
13 Bund Garden बंड गार्डन Under construction None Elevated
14 Yerwada येरवडा Under construction None Elevated
15 Kalyani Nagar कल्याणी नगर Under construction None Elevated
16 Ramwadi रामवाडी Under construction None Elevated

References

  1. ^ "MahaMetro takes possession of 35 hectares of land for project". The Times of India. 27 April 2018. Retrieved 4 May 2018.
  2. ^ "MahaMetro gets land for depot and multi-modal hub". The Times of India. 17 March 2018. Retrieved 4 May 2018.