Yimbun Railway Tunnel
Yimbun Railway Tunnel, 2008
LocationSinnamons Lane, Harlin, Somerset Region, Queensland, Australia
Coordinates26°59′45″S 152°22′24″E / 26.9959°S 152.3733°E / -26.9959; 152.3733
Design period1900 - 1914 (early 20th century)
Built1909-1910
ArchitectQueensland Railways
Official nameYimbun Railway Tunnel
Typestate heritage (built)
Designated27 November 2008
Reference no.602637
Significant period1910-
Significant componentstunnel - railway
BuildersQueensland Railways
Yimbun Railway Tunnel is located in Queensland
Yimbun Railway Tunnel
Location of Yimbun Railway Tunnel in Queensland
Yimbun Railway Tunnel is located in Australia
Yimbun Railway Tunnel
Yimbun Railway Tunnel (Australia)

Yimbun Railway Tunnel is a heritage-listed tunnel at Sinnamons Lane, Harlin, Somerset Region, Queensland, Australia. It was designed by Queensland Railways and built from 1909 to 1910 by Queensland Railways. It was added to the Queensland Heritage Register on 27 November 2008.[1]

History

The Yimbun Railway Tunnel, located 96.19 kilometres (59.77 mi) from Wulkuraka railway station, is a concrete-lined tunnel built between 1909 and 1910. It is the only railway tunnel on the Brisbane Valley railway line. This line was developed as a branch line from the main Brisbane-Toowoomba rail line. It was constructed from Wulkuraka near Ipswich to Lowood (1884) then extended to Esk (1886) then Toogoolawah (February 1904), Yimbun (September 1904), Linville (1910), Benarkin and Blackbutt (1911) and finally to Yarraman (1913). Originally intended that the line would eventually meet the Gympie to Nanango rail line to serve as a rail connection to Gympie and a shorter route between the South Burnett and Brisbane, the final linking section was never constructed.[1]

The Upper Brisbane Valley was settled by squatters in the 1840s and the timber industry in the Brisbane Valley also dates from this period. Closer settlement began in the 1870s. The timber industry quickly developed thereafter as land was rapidly cleared by selectors and the increased population of Brisbane and Ipswich from the 1870s demanded timber for housing and fuel on a continuing basis. The first sawmills in the Brisbane Valley, established in the 1870s, were located at Rosewood, Dundas and Colinton.[1]

Closer settlement of the Brisbane Valley had progressed sufficiently by 1877 for the country from Walloon via Esk and Nanango to be examined as a possible route for a railway to Gympie. In 1879 Queensland Premier Thomas McIlwraith approved the building of several branch lines, including one to Esk. However, the original plans for these branch lines were withdrawn from parliamentary consideration in 1880 on the recommendation of FT Gregory, MLC. In spite of this opposition, in 1881 the Queensland Parliament approved the building of the Brisbane Valley branch line from Wulkuraka to Esk. The contract for the first section was let to O'Rourke and McSharry in October 1882 with Henry Charles Stanley acting as Chief Engineer. This section to Lowood, a place that scarcely existed before the railway, opened on 16 June 1884. The Brisbane Valley Branch Line was the second branch line in Queensland after the Dugandan railway line, which opened to Harrisville in 1882. Within weeks an extension of the line from Lowood to Esk was approved in August 1884 by Premier Samuel Griffith. HC Stanley remained as Chief Engineer but HA Brigg was appointed as the contractor. The second section to Esk opened on 9 August 1886 and remained the terminus for more than 17 years, becoming an important centre and livestock loading point.[1]

During the 1880s closer settlement of the Brisbane Valley intensified. Land from Cressbrook Station was resumed and settled. In 1889 James McConnel began selling off small parcels of land from his property Cressbrook to his workers for dairying. The railway, which provided rapid and cheap transport to Brisbane, fostered the timber industry's development. Over the next 30 years sawmills were established at Lowood, Esk, Toogoolawah, Moore, Linville, Harlin, Blackbutt, Monsildale and Perseverance as well as a number of portable sawmills operating in stands of timber.[1]

In the late nineteenth century four dairy factories operated in the Brisbane Valley and utilised the railway for transporting milk and its products. Lowood dairy factory opened in 1890. Toogoolawah dairy factory (managed by Cressbrook Dairy Company) and Colinton Dairy Factory (managed by Standard Dairy Co Ltd) opened in 1898, while the Esk dairy factory opened in 1904. Circa 1898 Cressbrook Condensed Milk Factory, owned by James McConnel and owner/manager Colin Munro, opened on the banks of Cressbrook Creek. The factory and seven dairy farms that supplied it were purchased by Nestlé in 1907 and remained in operation until 1930 with local dairy farmers supplying its milk.[1]

In 1900 a parliamentary inquiry was conducted to determine the best route for a proposed rail line to Nanango. James McConnel of Cressbrook stated that an extension of the Brisbane Valley Railway Line would enable selectors to pursue dairying rather than grazing and to cultivate the land. The inquiry subsequently recommended a 45 kilometres (28 mi) extension of the Brisbane Valley Branch Line to Moore, which was approved in December of the same year. The first section, to the new township of Toogoolawah, which was the site of the Cressbrook Condensed Milk Factory, opened on 8 February 1904. On 1 September 1904 the extension to Yimbun was opened and remained the terminus until 1910.[1]

To access the vast timber resources beyond Yimbun a further extension of the line to Blackbutt was considered. The Blackbutt Tableland was notable as a rich farming district, that the railway was expected to expand. On the ranges hoop and bunya pines were already being exploited, and with conservation it was expected that freight for the railway would be supplied for many years. At Moore there were two sawmills operating and there were two more in the Blackbutt area. Plans for the 28 miles (45 km) of rail line from Yimbun to Blackbutt were approved at a Committee meeting on SS Lucinda on 9 January 1907. They were introduced into Parliament on 13 March 1908 and passed on 1 April 1908. In early 1909 Queensland Railways purchased materials for the construction of this line.[1]

The Yimbun Tunnel, located between Harlin and Yimbun, was designed by Resident Engineer, Hugh Fraser and built by day labourers between February 1909 and May 1910. Relative to their length, tunnels are the most costly of all forms of railway engineering and their problems include hazards such as rock falls. Material must be removed from the bore itself and disposed of. Few types of rock are sufficiently hard to be allowed to remain after excavation without a lining of masonry or concrete. Yimbun Tunnel was constructed as a 110-yard (100 m) concrete-lined straight tunnel with a 1-in-165 gradient rising towards Yarraman. Material from its bore was deposited into Banks Number 14 and 15 on either side of the tunnel's approaches.[1]

The section of line that included the Yimbun Tunnel opened on 22 November 1910 and the extension to Blackbutt was completed during 1911. The next section of the Brisbane Valley Rail Line, to Yarraman, was approved by parliament in December 1910 and opened on 1 May 1913. The last section required to complete the loop to Gympie was approved by parliament on 30 October 1918 but was never built.[1]

This section of the Brisbane Valley Rail Line was built under the 1895 Railways Guarantee Act which provided for local authorities to request construction of a railway by guaranteeing to meet any losses and the interest on capital borrowed for construction. The Railways Department was also required to share any deficit equally with the guarantors. The guarantee ended after 14 years unless a profit was made for three consecutive years, at which time it ceased. The cost to the residents in the benefited area served by the rail line including the Yimbun Railway Tunnel in the financial year 1913-1914 was £3389. Of this amount the Esk Shire Council paid £2000, Crow's Nest Shire Council £194, Nanango Shire Council £490 and Treasury £705. The nett revenue of the Brisbane Valley Branch Line was positive until the 1917-18. The line experienced a period of losses until 1932 after which it again returned substantial nett revenues.[1]

Passenger services were a feature of the Brisbane Valley Line from the commencement of the service. From 1913 a passenger service ran from Yarraman to Ipswich three days a week, taking six hours. In 1928 rail motor services commenced on the Brisbane Valley railway line and when new rail motors were introduced. The Brisbane Valley line, together with the Fassifern line, was the first to use them. Although limited to 48 kilometres per hour (30 mph) and averaging no more than 30–35 kilometres per hour (19–22 mph) they were faster, smoother, more comfortable and more reliable than road transport or mixed trains.[1]

By 1920 much of the forest timber had been cut out of the Brisbane Valley and the major industry was dairying. Accordingly, in the 1920s, the railway was transporting cream to the butter factories along the Brisbane Valley line - Colinton until 1921, Toogoolawah, Esk and Lowood. Whole milk was transported to the Nestlé and Anglo-Swiss Condensed Milk Factory at Toogoolawah until its closure in 1930. However, on the Blackbutt Range timber was still being cut and transported via rail. In 1934 The Courier-Mail reported increased timber haulage from railway loading centres between Benarkin and Yarraman. The amount was more than 1,500,000 super feet per month over the prior 12 months and formed the biggest proportion of freight on the Brisbane Valley railway line. All the timber was being cut from Crown reserves as privately held land was practically cut out. Most of the timber was sent to Brisbane for milling.[1]

During the 1930s revenue from the Brisbane Valley line was greater than expenditure on the line and by 1938 revenue exceeded expenditure and interest on the capital for its construction. In the 1930s and 1940s the Brisbane Valley Line to Esk handled a large volume of passengers and goods due to the construction of Somerset Dam on the Stanley River for flood mitigation and water storage for Brisbane, Ipswich and the lower Brisbane Valley. From 1935 the Brisbane Valley Rail Line handled construction material for the site. Esk became the transhipping depot equipped with cranes for heavy loads. Goods were then transported to the dam site along 18 miles (29 km) of bitumen road that the Stanley River Works Board, in conjunction with the Mains Road Commission, constructed for this purpose. Somerset dam was completed in 1959 after a period of abeyance from 1942 to 1948 due to World War II. Post-war, as road transport replaced rail for both goods and passengers, usage of the Brisbane Valley rail line declined.[1]

After flood damage in the 1974 the Brisbane Valley Branch Line was threatened with permanent closure but re-opened after several months. Nevertheless, the last Yarraman rail motor ran on 6 October 1988. Afterwards a passenger service operated from Ipswich to Toogoolawah until March 1993 when the Brisbane Valley Branch Line closed. The steel track, many of the bridges, most railway signage, station platforms and goods sheds have been removed. Many of the station buildings on the Brisbane Valley Rail Line have been re-used on other lines or sold for removal. The only remaining buildings are at Yarraman, Linville and Lowood (now serving as railway museums) and Toogoolawah, Esk and Coominya. Much of the railway infrastructure from Blackbutt to Moore and from Wulkuraka to Lowood has been removed.[1]

There are now only three large engineering structures left on the Brisbane Valley rail line. These are the steel and timber Lockyer Creek railway bridge over Lockyer Creek at Clarendon designed by Chief Engineer HC Stanley; the steel and concrete Harlin Rail Bridge over Maronghi Creek at Harlin; and the Yimbun Railway Tunnel. Approximately two dozen timber rail bridges are still intact, although their condition varies greatly.[1]

Description

Yimbun Railway Tunnel is located between 59 miles 24 chains (95.4 km) and 59 miles 29 chains (95.5 km) from Wulkuraka station along the former Brisbane Valley Branch Line formation and is sited beneath a saddle between two knolls. Yimbun Railway Tunnel is a semi-elliptical, concrete-lined, straight tunnel that is 110 yards (100 m) long and has a gradient of 1:165 against north-bound traffic. It has an earthen floor and is approximately 6 metres (20 ft) high at its apex. Both portals feature the date "1910". The cuttings that form the approaches on the north and south sides of the tunnel extend for approximately 100 metres (330 ft) and approximately 50 metres (160 ft) respectively.[1]

Heritage listing

Yimbun Railway Tunnel was listed on the Queensland Heritage Register on 27 November 2008 having satisfied the following criteria.[1]

The place is important in demonstrating the evolution or pattern of Queensland's history.

The Yimbun Railway Tunnel is important surviving evidence of the Brisbane Valley Branch Rail Line. Development of Queensland's branch rail network, which began in the 1880s, was vital for the development of the colony through opening land for closer settlement and freighting produce and resources to Queensland's major towns and ports.[1]

The Brisbane Valley Rail Line, when commenced in 1882, was the second of Queensland's branch lines. Over the next 30 years it was extended several times to facilitate the transport of timber, livestock and agricultural produce and was intended to become an alternative, shorter route from the South Burnett to Brisbane.[1]

In contrast to other branch lines, revenue from the Brisbane Valley Branch Line was greater than its expenses for the majority of the period from 1902 until the outbreak of World War II when reporting by the Commissioner of Railways on the profitability of individual lines ceased.[1]

The Yimbun Railway Tunnel, constructed in 1910 on the section between Yimbun and Blackbutt, is the only tunnel constructed along the entire Brisbane Valley Branch Line and one of only three remaining intact major rail structures on the Brisbane Valley Rail Line, the others being the Lockyer Creek Railway Bridge at Clarendon and the Harlin Rail Bridge. Of the 55 railway tunnels constructed in Queensland between 1865 and 1931, only nine are recorded as located on branch lines.[1]

The place is important in demonstrating the principal characteristics of a particular class of cultural places.

The Yimbun Railway Tunnel is significant as a highly intact example of a concrete-lined railway tunnel constructed for Queensland's narrow-gauge railway lines. Concrete was first used as a tunnel lining in 1880 and since then has been used for approximately two dozen railway tunnels constructed in Queensland.[1]

References

  1. ^ a b c d e f g h i j k l m n o p q r s t u v w "Yimbun Railway Tunnel (entry 602637)". Queensland Heritage Register. Queensland Heritage Council. Retrieved 1 August 2014.

Attribution

This Wikipedia article was originally based on "The Queensland heritage register" published by the State of Queensland under CC-BY 3.0 AU licence (accessed on 7 July 2014, archived on 8 October 2014). The geo-coordinates were originally computed from the "Queensland heritage register boundaries" published by the State of Queensland under CC-BY 3.0 AU licence (accessed on 5 September 2014, archived on 15 October 2014).

Further reading