GO 59 (floating dock)
Appearance
History | |
---|---|
Italy | |
Name | GO 59 |
Builder | Cantiere Navale Giacalone di Mazara del Vallo (Trapani) |
Cost | €7 million[1] |
Laid down | 2013 |
Launched | 2014 |
Acquired | 2011 |
Commissioned | march 2014 |
In service | 1 |
Homeport | Brindisi[2] |
General characteristics | |
Type | Floating dry dock |
Length | |
Beam |
|
Draught | 8.0 m (26 ft 3 in) (max)Error: has synonymous parameter (help) |
Draft | 9.5 m (31 ft 2 in) (max)Error: has synonymous parameter (help) |
Propulsion |
|
Notes | lifting capability 1.000 t (0.984 long tons) |
GO 59 is a Floating dry dock of the Marina Militare.[4]
History
Delivered to Arsenale Militare Marittimo di Augusta on 26 March 2014,[5][6] it was transferred to Stazione Navale di Brindisi on 24 February 2016.[7]
These are the technical specifications of MM for its realization.
References
- ^ http://www.difesa.it/Amministrazionetrasparente/segredifesa/navarm/Documents/settembre2016/Delibere/Relazione_preliminare_CIG2300938A18_Contratto_20222.pdf
- ^ http://www.marina.difesa.it/Notiziario-online/Pagine/2016_02_26_GO59.aspx
- ^ http://www.marina.difesa.it/conosciamoci/organizzazione/comandienti/arsenali/marinarsen_augusta/Pagine/generalita_struttura.aspx
- ^ "Naviglio locale – Marina Militare". Marina.difesa.it. Retrieved 27 November 2016.
- ^ http://www.marina.difesa.it/conosciamoci/notizie/Pagine/20140326_bacinogo59.aspx
- ^ https://rassegnastampamilitare.com/2014/03/11/marina-militare-mezzi-il-bacino-go59-arriva-ad-augusta/
- ^ http://www.marina.difesa.it/Notiziario-online/Pagine/2016_02_26_GO59.aspx