Jump to content

GO 59 (floating dock)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 02:01, 1 February 2021 (Task 18 (cosmetic): eval 1 template: hyphenate params (1×);). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

History
Italy
NameGO 59
BuilderCantiere Navale Giacalone di Mazara del Vallo (Trapani)
Cost7 million[1]
Laid down2013
Launched2014
Acquired2011
Commissionedmarch 2014
In service1
HomeportBrindisi[2]
General characteristics
TypeFloating dry dock
Length
  • - 70.00 m (229 ft 8 in) LOA[3]
  • - working length = 60.00 m (196 ft 10 in)
Beam
  • - 19.0 m (62 ft 4 in)
  • - working beam = 14.0 m (45 ft 11 in)
Draught8.0 m (26 ft 3 in) (max)Error: has synonymous parameter (help)
Draft9.5 m (31 ft 2 in) (max)Error: has synonymous parameter (help)
Propulsion
Noteslifting capability 1.000 t (0.984 long tons)

GO 59 is a Floating dry dock of the Marina Militare.[4]

History

Delivered to Arsenale Militare Marittimo di Augusta on 26 March 2014,[5][6] it was transferred to Stazione Navale di Brindisi on 24 February 2016.[7]
These are the technical specifications of MM for its realization.

References

  1. ^ http://www.difesa.it/Amministrazionetrasparente/segredifesa/navarm/Documents/settembre2016/Delibere/Relazione_preliminare_CIG2300938A18_Contratto_20222.pdf
  2. ^ http://www.marina.difesa.it/Notiziario-online/Pagine/2016_02_26_GO59.aspx
  3. ^ http://www.marina.difesa.it/conosciamoci/organizzazione/comandienti/arsenali/marinarsen_augusta/Pagine/generalita_struttura.aspx
  4. ^ "Naviglio locale – Marina Militare". Marina.difesa.it. Retrieved 27 November 2016.
  5. ^ http://www.marina.difesa.it/conosciamoci/notizie/Pagine/20140326_bacinogo59.aspx
  6. ^ https://rassegnastampamilitare.com/2014/03/11/marina-militare-mezzi-il-bacino-go59-arriva-ad-augusta/
  7. ^ http://www.marina.difesa.it/Notiziario-online/Pagine/2016_02_26_GO59.aspx