Kopere Solar Power Station

Coordinates: 00°00′02″S 35°11′50″E / 0.00056°S 35.19722°E / -0.00056; 35.19722
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 84.170.228.253 (talk) at 20:06, 23 April 2023 (correct position). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Kopere Solar Power Station
Map
CountryKenya
LocationKopere, Nandi County
Coordinates00°00′02″S 35°11′50″E / 0.00056°S 35.19722°E / -0.00056; 35.19722
StatusProposed
Construction began2019 Expected
Commission date2021 Expected
OwnerVoltalia Portugal SA
Solar farm
TypeFlat-panel PV
Power generation
Nameplate capacity50 megawatts (67,000 hp)

Kopere Solar Power Station, is a planned 50 megawatts (67,000 hp) solar power plant in Kenya, the largest economy in the East African Community.[1]

Location

The power station would be located in the neighborhood known as Kopere, in Nandi County, close to the border with Kisumu County, approximately 310 kilometres (193 mi),[1][2] by road, north-west of Nairobi, Kenya's capital and largest city. The solar farm would sit on approximately 250 square kilometres (97 sq mi) of land.[3]

Overview

Kenya has ambitions to electrify 100 percent of the country's population, up from 70 percent in 2017. This development and the 55 megawatts Garissa Solar Power Station, owned by Kenya Rural Electrification Authority, are aimed to diversify Kenya electricity sources, given the unpredictability of hydro-power in this East African country. The project was initiated by Portuguese energy firm Martifer Solar and was later acquired by the French firm in 2016.[1][4]

This power station is expected to supply at least 600,000 on-grid customers. In addition to the power station, the developers will construct a 33/132kV sub-station and a 1.8 kilometres (1 mi), transmission line to integrate the estimated 106GWh generated annually into the national grid.[5]

Developers

The power station is being developed by Voltalia Portugal SA, the Portuguese subsidiary of the French company Voltalia.[1][4] The developers have already signed a 20-year power purchase agreement with electricity distributor Kenya Power and Lighting Company.[4] Voltalia is expected to own and operate the solar farm and power station, after commissioning.[6]

Construction timeline, costs and funding

Construction is expected to start in 2019. In December 2018, the African Development Bank (AfDB) committed to lend US$18.17 million towards the construction of this power station. At that time, AfDB was also in the process of securing another US$11.6 million concessional loan from the Climate Investment Fund’s Scaling-up Renewable Energy Program (SREP), to lend towards this development as well.[5][needs update]

See also

References

  1. ^ a b c d ESI-Africa (30 May 2018). "Kenya: French firm signs contract for a 50 MW PV plant". Rondebosch, South Africa: ESI-Africa. Retrieved 7 December 2018.
  2. ^ "Road Distance Between Nairobi, Kenya And Kopere Matatu Stage, Kenya" (Map). Google Maps. Retrieved 20 August 2021.
  3. ^ Kiganda, Antony (6 May 2016). "Another 40 MW solar power plant in Kenya to be constructed". Nairobi: Construction Review Online. Retrieved 7 December 2018.
  4. ^ a b c Ngugi, Brian (27 May 2018). "French firm inks 50 MW solar electricity purchase deal". Daily Nation. Nairobi. Retrieved 7 December 2018.
  5. ^ a b ESI-Africa (4 December 2018). "Kopere Solar Power Project secures $18.17 million senior loan". Cape Town: ESI-Africa. Retrieved 7 December 2018.
  6. ^ Jean Marie Takouleu (31 May 2018). "Kenya: Voltalia to run the 50 MW Kopere solar power plant". Afrik21.africa. Paris, France. Retrieved 20 August 2021.