Jump to content

Old High Court metro station

Coordinates: 23°02′14″N 72°34′01″E / 23.03733°N 72.56702°E / 23.03733; 72.56702
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Sanjeev4125 (talk | contribs) at 09:09, 2 October 2023. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Old High Court
Ahmedabad Metro station
General information
LocationShreyas Colony, Navrangpura, Ahmedabad, Gujarat 380009
Coordinates23°02′14″N 72°34′01″E / 23.03733°N 72.56702°E / 23.03733; 72.56702
Owned byGujarat Metro Rail Corporation Limited
Operated byAhmedabad Metro
Line(s)Blue Line Red Line
PlatformsSide platform
Platform-1 → Vastral Gam
Platform-2 → Thaltej Gam
Platform-3 → Motera Stadium
Platform-4 → APMC
Tracks4
Construction
Structure typeElevated, Double track
Platform levels3
AccessibleYes Disabled access
Other information
StatusOperational
History
Opening30 September 2022; 2 years ago (30 September 2022)
Electrified750 V DC third rail
Services
Preceding station Ahmedabad Metro Following station
SP Stadium
towards Thaltej
Blue Line Shahpur
towards Vastral Gam
Usmanpura Red Line Gandhigram
towards APMC
Location
Map

Old High Court is an important elevated interchange metro station on the East-West Corridor of the Blue Line and on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India. Around this metro station holds the main Family Court of Ahmedabad along with Sardar Patel Swimming Complex and The Times of India Main Office. It was opened to the public on 30 September 2022 and is the first interchange metro station in the whole of Ahmedabad Metro network.[1][2][3][4]

Station Layout

Blue Line - Station Layout

Old High Court track layout
P2
P1
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Vastram Gam next station is Shahpur
Platform 2
Westbound
Towards ← Thaltej next station is SP Stadium
Side platform | Doors will open on the left Disabled access
L2

Red Line - Station Layout

Old High Court track layout
P3
P4
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 4
Northbound
Towards → APMC next station is Gandhigram
Platform 3
Southbound
Towards ← Motera Stadium next station is Usmanpura
Side platform | Doors will open on the left Disabled access
L2

Entry/Exit

See also

References

  1. ^ "PM Modi inaugurates Ahmedabad Metro first phase, takes a ride". Economic Times India Times. Retrieved 3 January 2022.
  2. ^ www.ETRealty.com. "Prime minister inaugurates phase-1 of Ahmedabad Metro rail project - ET RealEstate". ETRealty.com. Retrieved 4 October 2022.
  3. ^ "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
  4. ^ "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.