Jump to content

Koteshwar Road metro station

Coordinates: 23°06′20″N 72°36′12″E / 23.10555°N 72.60326°E / 23.10555; 72.60326
From Wikipedia, the free encyclopedia

Koteshwar Road
Ahmedabad Metro station
General information
Location25-30, Motera Stadium Rd, Motera, Ahmedabad, Gujarat 382424
Coordinates23°06′20″N 72°36′12″E / 23.10555°N 72.60326°E / 23.10555; 72.60326
Owned byGujarat Metro Rail Corporation Limited
Operated byAhmedabad Metro
Line(s)Red Line
PlatformsSide platform
Platform-1 → Sector-1 / GIFT City (to be extended to Mahatma Mandir in the future)
Platform-2 → APMC
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access
Other information
StatusStaffed, Operational
History
Opened16 September 2024; 34 days ago (16 September 2024)
Electrified750 V DC third rail
Services
Preceding station Ahmedabad Metro Following station
Vishwakarma College
towards Sector-1 or GIFT City
Red Line Motera Stadium
towards APMC
Vishwakarma College Red Line
(Future Service)
Location
Map

Koteshwar Road is an elevated metro station on the North-South corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India. This metro station was inaugurated on 16 September 2024 [1][2][3] by Prime Minister Narendra Modi and was opened to the public on 17 September 2024. [4][5]

History

[edit]

In the initial stages of Phase 2 [6], Gujarat Metro Rail Corporation (GMRC) Limited sought bids for constructing this metro station along the 28.25km Motera Stadium - Mahatma Mandir stretch of the Red Line of Ahmedabad Metro, and this phase was split into 2 lines. Line 1 covers 20.8km from Motera Stadium to Sector-1 (Gandhinagar) including GNLU to GIFT City metro stations, while Line 2 covers the remaining 7.45km from Sector-1 (Gandhinagar) to Mahatma Mandir metro stations.

In January 2020, GMRC initiated the tendering for the civil construction, technical bids on June 2020 and Afcons Infrastructures were the lowest bidders securing the Line 1 stretch. They commenced the construction of this metro station as per the agreements in February 2021. [7]

Station Layout

[edit]
Kodeshwar Road track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side Platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → APMC
Next Station: Motera Stadium
Platform 1
Northbound
Towards ← Sector-1
Next Station: Vishwakarma College
Side Platform | Doors will open on the left Disabled access
L2

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Ahmedabad-Gandhinagar Metro phase 2 inaugurated – Know route, stations, schedule and more". Financialexpress. 16 September 2024. Retrieved 15 October 2024.
  2. ^ "PM Modi inaugurates 2nd phase of Ahmedabad Metro Rail Project". India Today. 16 September 2024. Retrieved 15 October 2024.
  3. ^ "Ahmedabad Metro: કેબના મોંઘા ભાડા અને બસના ધક્કામાંથી મુક્તિ: હવે અમદાવાદથી ગાંધીનગર વચ્ચે મેટ્રોમાં આરામદાયક મુસાફરી માણો - Ahmedabad-Gandhinagar Metro: Know Route, Map, Stations, Ticket Price, Schedule And More". Gujarati Jagran (in Gujarati). 20 September 2024. Retrieved 15 October 2024.
  4. ^ PTI (16 September 2024). "PM Modi travels on Ahmedabad-Gandhinagar metro rail". The Hindu. ISSN 0971-751X. Retrieved 15 October 2024.
  5. ^ PTI (16 September 2024). "PM Modi travels on Ahmedabad-Gandhinagar metro rail". The Hindu. ISSN 0971-751X. Retrieved 15 October 2024.
  6. ^ "Ahmedabad Metro Phase 2 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 15 October 2024.
  7. ^ "10 Bidders for Ahmedabad Metro Phase 2's Package C3". The Metro Rail Guy. 9 May 2022. Retrieved 15 October 2024.
[edit]