This is an old revision of this page, as edited by InternetArchiveBot (talk | contribs) at 11:52, 30 December 2023 (Rescuing 1 sources and tagging 0 as dead.) #IABot (v2.0.9.5) (AManWithNoPlan - 16541). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Operation Stack
Operation Stack being implemented in March 2008
Operation Stack is located in Kent
Operation Stack
Location in Kent
LocationKent, England, UK
Coordinates51°05′33″N 1°05′33″E / 51.0926°N 1.0924°E / 51.0926; 1.0924
Grid referenceTR169374

Operation Stack was a procedure used by Kent Police and the Port of Dover in England to park (or "stack") lorries on the M20 motorway in Kent when services across the English Channel, such as those through the Channel Tunnel or from the Port of Dover, are disrupted, for example by bad weather, industrial action, fire or derailments in the tunnel.

Operation Stack is managed by Kent Police using powers under the Civil Contingencies Act 2004 and coordinated by a multi-agency group known as Operation Fennel.[1]

According to Damian Green MP, by 2007 the system had been implemented 74 times in the 20 years since it was first introduced.[2]

Causes

Operation Stack is implemented whenever there is an urgent need to inhibit the flow of traffic to the Channel Tunnel and the Port of Dover, which handle 90% of freight traffic between the United Kingdom and mainland Europe. There are officially only 550 parking spaces for HGVs in Kent, so if access to cross-channel services is restricted, congestion would quickly spread across the county.[3]

The most common causes of Operation Stack are severe weather that either cancels or restricts ferry services, industrial action at the French ports of Calais, Dunkirk and Boulogne, and electrical failures in the Channel Tunnel.[3]

Procedure

A map of the phases of Operation Stack

The M20 is the main road from the London Orbital Motorway (the M25), the world's largest and busiest ring road,[4] to the Port of Dover, the busiest ferry terminal in Europe,[5] and the Channel Tunnel. It runs south-east from the M25 near Swanley through Kent via the county town Maidstone, Ashford and Folkestone to Dover. Most of the road is three lanes in each direction as far Folkestone, then two lanes to Dover.[6]

Lorries are parked on the carriageways as below, with all other traffic diverted onto the parallel A20 road:

  • Phase 1: Coast-bound from Junction 11 (Hythe) to 12 (Cheriton),[7] 3.6 miles (5.8 km)
  • Phase 2: Coast-bound from Junction 8 (Maidstone) to 9 (Ashford),[7] 13.5 miles (21.7 km)
  • Phase 3: London-bound from Junction 9 (Ashford) to 8 (Maidstone), 13.5 miles (21.7 km)
  • Phase 4: Coast-bound from Junction 8 (Maidstone) to 12 (Cheriton),[8] 26.5 miles (42.6 km)

If congestion reaches from Junction 8 to Junction 11 (22.9 miles (36.9 km)), traffic for the Port of Dover is diverted to Manston Airfield while traffic for the Channel Tunnel remains on the M20.[9]

By stacking lorries along the motorway, up to 3,000 additional parking spaces for freight can be created. The decision to implement each phase of the programme is taken in conjunction with Kent Police, the Port of Dover and Highways England. Local traffic often uses the parallel A20 (the old turnpike road from Maidstone to Folkestone) or the A2 (the historic Roman Road from London to Dover via Canterbury) though neither offers the same capacity as the M20.[3]

The road can be closed for days at a time,[10] and as a result Operation Stack has been controversial.[11]

History

1988

Operation Stack was first introduced in February 1988, because of a strike called by the National Union of Seamen in Folkestone Docks, which was then an important ferry terminal, that began on 31 January. Though the strike stopped after three days, there was still a tailback and local protests and struggle between Folkestone and Dover. The whole of the M20 between Ashford and Folkestone was closed; at the time, the motorway was incomplete between junctions 8 at Leeds Castle and 9 at Ashford.[12]

1999–2000

In 1999, Parliamentary Under Secretary for Transport Keith Hill commissioned a study by the Channel Road transport Group to look at alternatives.[13] The following year, Michael Howard asked Secretary of State for the Environment, Transport and the Regions John Prescott about alternative methods to Operation Stack. Prescott replied that he would investigate matters but defended the status quo, saying "Management schemes can make traffic flows much better, and they are almost inevitable in difficult circumstances."[14]

2005

In early 2005, Kent Police implemented Operation Stack several times within a few weeks due to bad weather (snow), a strike and a damaged berth in Calais, which limited the number of ferries which could cross the channel. By the end of June 2005, Operation Stack was implemented a total of 18 times in the first half of the year and cost Kent Police £123,000 in overtime.[15]

2007

At the end of January 2007, local Members of Parliament Damian Green of Ashford and Stephen Ladyman of Thanet were involved in a debate covering Operation Stack in the House of Commons. Everyone agreed that stacking was a problem, but there were no firm decisions as to any alternatives.[16]

2008

On 5 March 2008 industrial action that had begun in late February by French workers operating SeaFrance cross-channel ferries resulted in Kent Police initiating phase 2 of Operation Stack.[17] The industrial action lasted for a number of days, with the backlog on the M20 causing significant disruption. The MEP for South East England, Richard Ashworth, and the leader of Kent County Council, Paul Carter, urged French president Nicolas Sarkozy to step in and resolve the dispute because of the resulting difficulties.[18][19] This was the first time in the 20-year history of Operation Stack that the M20 was closed for more than three days; businesses in nearby towns reported trade down by up to 50%.[20]

According to Kent Police logs, one, two or three phases of Operation Stack were implemented for at least part of each day between 28 February and 15 March 2008.[21] The Freight Transport Association estimated the cost of disruption to be between £4m-£5m at 9 March 2008.[22] Kent County Council later announced progress with plans to construct a lorry park for temporary use to mitigate the effects of Operation Stack. This has met with opposition from the borough councilor for Saxon Shore ward where it would be sited; he accused the county council of "not thinking strategically", not considering the environmental impact properly, and of siting it too close to a National Grid facility, where he expects the fuel in vehicles to be a danger to a "facility of strategic national importance."[23]

2015

On 24 June 2015 Operation Stack was implemented due to industrial action taken by French employees of the MyFerryLink company, as a result of disagreements regarding the imminent takeover of the company by DFDS. This has been the first ever incident which has seen the implementation of Phase 4 of Operation Stack, which involves closing the M20 from Junctions 9 to 11 coast-bound, meaning that continent-bound HGV traffic was stacked all the way from Junction 8 at Hollingbourne, southeast of Maidstone, to Junction 12 at Cheriton, near Folkestone. Operation Stack began to be removed from 3 July onwards, with more than 30 miles of parked HGVs needing to be cleared. The cost to the United Kingdom economy was estimated at around £250 million.[24]

Over 4,600 HGVs were eventually cleared from the M20 by 4 July,[24] however soon afterwards Phase 2 was implemented again for Eurotunnel freight traffic, due to over 150 migrants storming the Calais tunnel portal. This was as a result of the ongoing migrant crisis in Calais. The incident demonstrated that insufficient organisation and security at Eurotunnel, and port facilities throughout Calais was present to keep the desperate migrants under foot.[25] Operation Stack resumed later during the month. Damian Collins, MP for Folkestone and Hythe complained the problem was too large for Kent County Council to deal with and met with the Home Secretary, Theresa May for discussion.[26]

2020

In December 2020, France closed its borders with the UK during the COVID-19 pandemic due to concerns about the spread of a new variant of coronavirus.[27] This caused major disruptions in ferry and Eurotunnel train traffic.[28]

Operation Brock

In 2019 Operation Stack is due to be superseded by Operation Brock. Work began in May 2018 on this scheme managed by Highways England, designed as a temporary solution to manage lorry queueing and traffic flow at the Port of Dover after Brexit.[29]

In September 2018, Highways England revealed in a freedom of information request that "Operation Brock, the code name for the management of freight in a no-deal scenario, would not be automatic and would require steel barriers to make a planned contraflow system on the M20 safe for ordinary vehicles" and that "£30m has been allocated to cover the design, build and initial operation of the scheme for up to six months."[30]

Alternatives

Several other options have been considered:

  • Parking the lorries on the Kent County Showground at Detling has been discussed by Highways England, but locals are opposed because the area is very congested.[31]
  • In 2005, the Dover Harbour Board unveiled a plan to create a lorry park for 1,500 vehicles[32] with construction beginning in 2006.[33]
  • In February 2007, it was revealed that Kent County Council had been talking to landowners about buying land for a lorry park.[34]
  • There has been a suggestion from Folkestone and Hythe District Council for a lorry park to the north-east of the roundabout at Junction 11, which would be supported by development in the Stanford and Lympne areas.[35]
  • A coned contraflow system has been trialled on the 10.5 miles (16.9 km) section between Ashford and Maidstone, to relieve the pressure on the A20, but it was costly and slow to arrange, taking two days to set up and two days to remove.[36] Highways England have announced a plan to use quick movable barriers[37][38] to set up a contraflow so that two lanes can be maintained.[39]
  • Use of part of the car park at Ebbsfleet International railway station to temporarily park/queue up to 1,000 lorries
  • In July 2016 the Department for Transport announced that a new lorry park for 3,600 vehicles was to be built to the north of junction 11 of the M20, with new access from the eastbound motorway between junctions 10 and 11 at Stanford West, with completion expected by Summer 2017. However, in November 2017 the Department announced that "environmental obligations" had delayed this option and, instead, a linear lorry park along the centre of the M20, separated by traffic barriers, was under consideration.[40][41]
  • Manston Airport is under consideration as an overflow lorry park, with a convoy of lorries testing the feasibility of the 20-mile (32 km) route to Dover along the A256 on 7 January 2019.[42]

Other ports

Felixstowe

When the port of Felixstowe is closed, lorries are parked on the old A45 at Levington. They used to be parked on the A14 but this was deemed to be too dangerous for other road users.[43] This is implemented when winds exceed 45 miles per hour (72 km/h) as the cranes cannot be operated due to Health and Safety regulations.[44]

Stranraer

When the ports of Cairnryan and Stranraer are closed, lorries are parked on the closed A751.

References

  1. ^ Parliamentary Select Committee
  2. ^ Hansard (1 February 2007). "Operation Stack Debate House of Commons". parliament.uk. pp. column 465. Retrieved 24 August 2015.
  3. ^ a b c "Essential Guide to Operation Stack". Kent News. 30 June 2015. Retrieved 22 July 2015.
  4. ^ Moran, Joe (16 November 2005). Reading the Everyday. Routledge. p. 95. ISBN 978-1-134-37216-4.
  5. ^ "Port of Dover is Busiest Ferry Port in Europe". World Maritime News. 2 April 2014. Retrieved 22 July 2015.
  6. ^ "M20 - London to Folkestone". The Motorway Archive. Chartered Institute of Highway Engineers. Archived from the original on 24 October 2014. Retrieved 22 July 2015.
  7. ^ a b "French Strike hits Dover services". BBC News. BBC. 22 March 2005. Retrieved 3 January 2010.
  8. ^ "Phase 4 is the closure of the coastbound M20 between J8 & J12, in addition to the current London bound closure of M20 J9 – J8". Kent County Council. Retrieved 7 January 2015.
  9. ^ "Operation Stack". Kent Police. Archived from the original on 19 July 2018. Retrieved 19 July 2018.
  10. ^ "Police call off Operation Stack". BBC News. BBC. 6 March 2005. Retrieved 1 January 2008.
  11. ^ "Call for Operation Stack to end". BBC News. BBC. 18 March 2005. Retrieved 1 January 2008.
  12. ^ Lennon, Sam (22 January 2015). "Operation Stack: How a seamen's strike led to the introduction of the M20 'lorry park'". Kent Online. Retrieved 22 July 2015.
  13. ^ "Operation Stack". Parliamentary Debates (Hansard). 7 November 2000. Retrieved 22 July 2015.
  14. ^ "Transport Ten Year Plan". Parliamentary Debates (Hansard). 20 July 2000. Retrieved 22 July 2015.
  15. ^ "Costs for Operation Stack mounting up". Kent Online. 9 June 2005. Retrieved 22 July 2015.
  16. ^ "Operation Stack raised in Commons". BBC News. BBC. 1 February 2007. Retrieved 1 January 2008.
  17. ^ "Ferry action brings M20 closures". BBC News. 5 March 2008. Retrieved 3 January 2010.
  18. ^ "Protest to Sarkozy over M20 chaos". BBC News. 6 March 2008. Retrieved 3 January 2010.
  19. ^ "MEP seeks to resolve ferry strike". BBC News. 8 March 2008. Retrieved 3 January 2010.
  20. ^ "Police in appeal over M20 chaos". BBC News. 7 March 2008. Retrieved 3 January 2010.
  21. ^ "Response to Freedom of Information Request Received 15 March 2010" (PDF). Kent Police. Archived from the original (PDF) on 12 August 2014. Retrieved 12 August 2014.
  22. ^ "M20 chaos ends after Stack lifted". BBC News. 9 March 2008. Retrieved 12 August 2014.
  23. ^ "Plans for M20 lorry park revealed". BBC News. 12 March 2008. Retrieved 3 January 2010.
  24. ^ a b Gupta, Tanya (9 July 2015). "How do you solve a problem like Operation Stack?". BBC News. Retrieved 9 July 2015.
  25. ^ "Eurotunnel increases security over migrant activity". BBC News. 4 July 2015. Retrieved 22 July 2015.
  26. ^ "Kent M20 Operation Stack: Government 'should take lead'". BBC News. 22 July 2015. Retrieved 22 July 2015.
  27. ^ "Covid-19: Boris Johnson to chair emergency meeting amid travel bans". BBC News. 21 December 2020. Retrieved 21 December 2020.
  28. ^ Shaw, Neil (21 December 2020). "Operation Stack activated turning M20 to car park as ports closed". WalesOnline. Retrieved 21 December 2020.
  29. ^ New Civil Engineer: NAO warns 'considerable' infrastructure work needed at UK border
  30. ^ Guardian: "Brexit lorry scheme would leave Kent in chaos for weeks".
  31. ^ "Showground considered for lorries". BBC News. BBC. 14 May 2005. Retrieved 1 January 2008.
  32. ^ "Lorry park plan for Channel port". BBC News. BBC. 10 November 2005. Retrieved 1 January 2008.
  33. ^ "Port to build four ferry berths". BBC News. BBC. 9 March 2006. Retrieved 1 March 2010.
  34. ^ "Kent looks at permanent site for Operation Stack". Roadtransport.com. Reed Business Information Limited. 1 February 2007. Retrieved 1 January 2008.[permanent dead link]
  35. ^ "Cabinet Committee Minutes October 2005" (PDF). Kent County Council. 24 October 2005. Archived from the original (PDF) on 8 March 2007. Retrieved 25 December 2006.
  36. ^ "Changes to Operation Stack system". BBC News. BBC. 24 March 2005. Retrieved 1 January 2008.
  37. ^ "Quick Moveable Barrier (QMB) Machine". Highways Agency. Archived from the original on 10 August 2012.
  38. ^ "Barrier to solve Operation Stack". BBC News. 25 June 2007. Retrieved 14 March 2008.
  39. ^ "QMB to improve Operation Stack". Archived from the original on 27 September 2007. Retrieved 25 June 2007.{{cite web}}: CS1 maint: bot: original URL status unknown (link), Highways Agency
  40. ^ "Operation Stack: 'Disneyland-sized' lorry park to be built at Standford West". BBC News. 6 July 2016. Retrieved 6 July 2016.
  41. ^ Travis, Alan (16 November 2017). "Ministers warned about repeat of Dover lorry queues after Brexit". The Guardian. p. 13. Retrieved 16 November 2017.
  42. ^ "Brexit: Manston Airport to host lorry park trial". BBC News. Retrieved 4 January 2019.
  43. ^ "Operation Stack" (PDF). Retrieved 15 September 2008.
  44. ^ "Port Prepared For More High Winds". Felixstow TV. 6 December 2006. Archived from the original on 28 September 2007. Retrieved 25 December 2006.