Jump to content

Harnaut–Mokama section

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Asqwlk (talk | contribs) at 15:35, 21 October 2018. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Harnaut-Mokama section
हरनौत-मोकामा खण्ड
Overview
StatusOperational
OwnerIndian Railway
LocaleBihar
Termini
Service
Operator(s)East Central Railway
History
Opened2016
Technical
Line length52 km (32 mi)
Number of tracks1/ 2
Track gauge1,676 mm (5 ft 6 in) broad gauge
Operating speed80–110 km/h (50–68 mph)
Route map

The Harnaut-Mokama Loop also known as Coal Belt Loop which connects Harnaut railway station and Mokama Junction railway station. Originally a part of the Howrah-Delhi main line & Bakhtiyarpur-Tilaiya line, it was opened to traffic in 2016.

Carries coal from Jharkhand state to most important NTPC Barh. With the construction of a shorter railway line for a part of the route, the 53 kilometres (33 mi) stretch was assigned a separate identity.

Branch line

Construction of Daul Electric line between Harnaut karnauti Halt and Jaiprakash Mahuli Halt Extent up to Barh

Development

Railway workshop & Industry

Two major Industries along with this line

  1. Rail Coach Factory, Harnaut &
  2. NTPC Barh

Electrification

References