Murray to the Mountains Rail Trail

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Rich Farmbrough (talk | contribs) at 07:53, 9 July 2019 (→‎top: Date formats). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Murray to Mountains Rail Trail
Length95 km
LocationMelbourne, Victoria, Australia
DifficultyEasy to medium
HazardsUncontrolled crossings of major highways
SurfaceSealed, some sections of compact gravel
HillsSmall undulating hills; Beechworth branch involves extended climb
WaterAvailable in most towns
Train(s)Melbourne-Sydney line to start of route at Wangaratta
BusAvailable in major towns

The Murray to Mountains Rail Trail is a cycling and walking rail trail in northern Victoria, Australia. It extends from Wangaratta to Bright, with a side branch to Beechworth, following the route of the former Bright railway line. This side branch trail is planned to be extended from Beechworth to Yackandandah. AU$12m was budgeted by the Victoria State Government for this extension in May 2017. [1] Unusually for a rail trail, it is sealed for virtually the entire distance of approximately 95 kilometres.

Another section, from Rutherglen to Wahgunyah on the Murray was completed in 2009. There is an on-road "preferred route" connecting Rutherglen to Bowser via Chiltern.[2] A third section extends south from Wangaratta to Oxley, connecting with a bike path from there to Milawa.

Stages

Map of two sections of the rail trail.

Landmarks are as follows:

Map of the Rutherglen-Wagunyah section of the Murray to the Mountains Rail Trail.

References

External links

"Victoria (Australia)" is an invalid category parameter for Template:Coord missing.
The problem is usually caused either by a spelling mistake or by an-over-precise category.
For a full list of categories, see Category:Unclassified articles missing geocoordinate data and its subcategories.