Jump to content

Lever frame

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Filedelinkerbot (talk | contribs) at 13:26, 12 January 2020 (Bot: Removing c:File:Signal Cabin at Athlone West, Co Westmeath.jpg (en). Deleted by Srittau (per Commons:Commons:Deletion requests/Files found with NLI Ref.: ODEA).). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

A mechanical lever frame inside the signal box at Knockcroghery in Ireland

Mechanical railway signalling installations rely on lever frames for their operation to interlock the signals, track locks[1] and points to allow the safe operation of trains in the area the signals control. Usually located in the signal box, the levers are operated either by the signalman or the pointsman.

The world's largest lever frame (191 levers) is thought to have been in the Spencer Street No.1 signal box in Melbourne, Australia, which was decommissioned in 2008.[2] The largest operational lever frame, meanwhile, is located at Severn Bridge Junction in Shrewsbury, England, and it contains 180 levers, although most of them have been taken out of use.[3][4]

Overview

Lever frame of the signal box Hausen im Tal, Germany: the signals are operated by the red levers, blue levers with Arabic numerals are for points and blue levers with Roman numerals are for track locks. The box on the right of the lever frame is used for manual block signalling; the smaller green levers are used for operating the route locks. The interlocking apparatus is in the box behind the levers.
A three-lever ground frame at Kyle of Lochalsh, released by Annett's key

The lever frame is located in the signal box, which can be a building at ground level or a tower, separated from or connected to an existing station building. Early lever frames were also built as ground frames next to the track, without any form of shelter and were usually operated by traincrew and not permanently staffed. Especially in England, lever frames with the pivot underneath the floor of the signal box were common (as seen on the photo on the left).[5] This design's relatively short lever angle is a major disadvantage, as it requires more force to move the lever. Therefore, later, especially in Germany, lever frames with pivots inside the signaller's room were used, that allow for a lever angle of approximately 180° (as seen on the photo on the right).[6]

By the movement of individual levers (or sometimes cranks),[6] signals, points, track locks, level crossing gates or barriers and sometimes movable bridges over waterways are operated via wires and rods. The signaller chooses the correct combination of points, facing point locks and signals to operate, which will control the movement of each train through their area of control. The lever frame contains interlocking designed to ensure that the levers cannot be operated to create a conflicting train movement. Each interlocking installation is individual and unique to the location controlled. The interlocking may be achieved mechanically or by electric lever locks, or (more usually) a combination of both.

Signals or points located some distance away from the signal box are sometimes electrically rather than mechanically operated. Movement of the controlling lever operates an electrical circuit controller. In the UK, it is practice to cut short the handles of any levers controlling electrical apparatus, to remind signalmen that little effort is required to move them. Mechanical lever frames and interlocking have now largely been replaced by modern, much larger electrical or electronic route interlockings located in Power Signal Boxes and more recently Integrated Electronic Control Centres which are able to control much larger areas of the rail network.[citation needed]

Variants

Mechanical lever frames

Interlocking apparatus behind the levers (Lüdinghausen railway station)

A mechanical lever frame is designed to harness mechanical advantage to operate switch points, signals or both under the protection of the interlocking logic. The levers are connected to field appliances via solid pipes or taut wires such that the full travel of the lever will reliably cause full travel in the appliance. Each lever is engaged with the interlocking logic such that movement of the lever is only possible when all necessary conditions are met. The interlocking may be mechanical, electric (via solenoids) or both with the apparatus being mounted horizontally behind the lever frame[7] or vertically below it.

To assist the operator in determining their functions, each lever in a frame will generally be uniquely labelled, one common method being to number the levers in order from left to right. A lever's identification may be painted on its side or engraved on a badge or plate fitted either to the lever or behind it. This may be accompanied by a description of the lever's function. Usually, a large track diagram is positioned within easy view of the operator, which clearly shows each lever number adjacent to symbols representing the items of equipment that they operate. Levers are commonly coloured according to the type of equipment they control, the code of colours varying between different railway administrations. For example, in British practice, the following code generally applies: a red lever controls a stop signal or shunt signal, a yellow lever controls a distant signal, a black lever controls a set of points, a blue lever controls a facing point lock, and a white lever is spare. Brown levers are used to lock level crossing gates. Lever handles are usually of polished, unpainted steel, and signalmen operate them with a cloth to prevent rusting from the sweat on their hands.[8] In Germany, signal levers are red, whilst levers for points and track locks are usually blue, and route lock levers are green. Also, individual numbers and letters are used to indicate each individual item a lever operates in Germany as well.[9]

Some mechanical frames were combined with a set of electric levers or switches to more efficiently work electrically powered signals or other non-mechanically operated devices.[10] Typically the switch points would be left under mechanical operation as the other devices used comparatively little electrical power and could be run off of batteries or a low capacity railroad-operated power system.

Power frames

Everglades Junction signal box with its Westinghouse Brake & Signal Co. Ltd. Style 'L' Power Lever Frame
Power frame, type Siemens M43

A power operated interlocking frame uses some form of power assist to operate switches, signals and other interlocking appliances in the field. The power can come from hydraulic, pneumatic or electric sources with direct acting or low voltage electric control.[11] The use of mechanical levers is retained in order to engage a mechanical interlocking component, in addition to switches or valves needed to actuate the field appliances.

In hydraulic lever frames, moving the lever operates a hydraulic valve rather than wires and rods. To prevent accidents, operating a set of points requires pulling the actual lever for the points and a secondary check lever. The points are then moved by a hydraulic motor. This type of power frame has the disadvantage of a relatively low distance between points and signal box (approximately 200–250 m) and a slow operating speed. It was common in Italy and France only.[12] Pneumatic lever frames have an operating principle that is related to that of hydraulic lever frames, however, instead of a hydraulic liquid, compressed air is used. The two types also share the same disadvantages such as pressurized tubing having to run directly between the field appliance and the lever frame. Electric control of a hydraulic or pneumatic actuator in the field was far simpler and more reliable, allowing for a greater distance between signal box and points. Whilst first being common in the United States due to work by the Union Switch and Signal corporation (a division of WABCO), this system was later used in the United Kingdom and other Commonwealth nations,[13] where the Westinghouse Air Brake Company had a presence.

In Austria, Siemens & Halske built a fully electric power frame in 1894, which does not rely on compressed air. Instead, electric motors move the points. Later, this system was also used in Germany.[14] In the United State the Taylor Signal Corporation, later merged into General Railway Signal developed an electrically powered interlocking system that made use of mechanical slides to engage traditional mechanical locking. Union Switch and Signal later modified their electro-pneumatic system to all-electric as early as 1896.

A major issue with power frames was ensuring that the position of the levers on the frame correctly represented the position of the switch or other appliance in the field. Unlike a mechanical linkage, pneumatic or hydraulic lines could leak and cause points to drift out of correspondence with disastrous consequences. The Taylor/GRS electric power frame system used a feature called "dynamic indication" where the back EMF generated when the electric motor reached the limit of travel would signal the interlocking logic that the points had finished moving, but not the position of the points on an ongoing basis.[15] This and other open loop systems designed in the 19th and early 20th centuries to save on costly relays, were replaced by closed loop systems after a number of accidents. In North America this is known as "Switch-Signal" protection and any change in the position of a field appliance will immediately set the electric signals controlled by a power frame to danger.[16]

Since power frames still utilize traditional mechanical interlocking logic, some form of mechanical operating mechanism is still necessary. However, since the signals and points are worked by an external source of power, little mechanical effort is needed to move the levers and they could both be miniaturized and reshaped. The simplest form of power frame lever is simply a smaller version of a traditional lever. General Railway Signal was known for its "pistol grip" style levers that work slides moving in and out from a horizontal frame. Union Switch and Signal modified the Saxby and Farmer tappet interlocking system, dispensing with the straight lever entirely and placing a rotating crank onto the locking spindle (although in the UK the Westinghouse Brake & Saxby Signal Co. modified this design to resemble a traditionally shaped miniature lever.) In continental Europe there were many miniature lever designs, although Siemens & Halske made use of short knobs that were rotated by the operator.

Manufacturers

In the UK, larger railway companies like the Great Western Railway (GWR) and the London and North Western Railway (LNWR) developed their own mechanical interlocking systems, whilst most smaller independent railway companies installed signalling products and systems bought from such firms as The Railway Signal Company (RSC) and The Westinghouse Brake and Signal Company (WB&SCo).

This list contains manufacturers of lever frames
  • Aster (France)
  • Bianchi-Servettaz (Italy)
  • Fiebrandt & Co (Germany)
  • Max Jüdel & Co (Germany)
  • The Railway Signal Company (United Kingdom)
  • Scheidt & Bachmann (Germany)
  • Siemens & Halske (Germany)
  • Stahmer (Germany)
  • Vereinigte Eisenbahn-Signalwerke (Germany)
  • The Westinghouse Brake and Signal Company (United States and United Kingdom)

References

  1. ^ Wolfgang Fenner, Peter Naumann, Jochen Trinckauf: Bahnsicherungstechnik: Steuern, Sichern und Überwachen von Fahrwegen und Fahrgeschwindigkeiten im Schienenverkehr, John Wiley & Sons, 2011, ISBN 9783895786839, p. 89
  2. ^ Hinson, John. "Spencer Street No1 cabin, Melbourne, Australia". signalbox.org. Retrieved 15 September 2018.
  3. ^ Hinson, John. "Severn Bridge Junction signal box". signalbox.org. Retrieved 15 September 2018.
  4. ^ Stephen, Paul (July 2018). "FROM THE FILES: Shrewsbury's record-breakers". www.railmagazine.com. Retrieved 20 September 2018. This place is fairly unique these days in being double-manned, but with 92 levers to operate it keeps us fairly busy and you soon work through the shoe leather.
  5. ^ Cauer: Sicherungsanlagen im Eisenbahnbetriebe, p. 122
  6. ^ a b Cauer: Sicherungsanlagen im Eisenbahnbetriebe, p. 123
  7. ^ Cauer: Sicherungsanlagen im Eisenbahnbetriebe, p. 125
  8. ^ "South Devon Railway - Railway Signalling". www.southdevonrailwayassociation.org. South Devon Railway Association. Retrieved 20 September 2018.
  9. ^ Cauer: Sicherungsanlagen im Eisenbahnbetriebe, p. 126
  10. ^ http://www.rrsignalpix.com/tower_delray.php
  11. ^ Cauer: Sicherungsanlagen im Eisenbahnbetriebe, pp. 250
  12. ^ Cauer: Sicherungsanlagen im Eisenbahnbetriebe, p. 250
  13. ^ Cauer: Sicherungsanlagen im Eisenbahnbetriebe, p. 251
  14. ^ Cauer: Sicherungsanlagen im Eisenbahnbetriebe, p. 252
  15. ^ Railway Signaling and Communications, Volume 9, #7, pg 209
  16. ^ Railroad Operation and Railway Signaling, Edmund John Phillips, pg. 155-158

Bibliography

  • Wilhelm Adolf Eduard Cauer: Sicherungsanlagen im Eisenbahnbetriebe, in Handbibliothek für Bauingenieure, published by Robert Otzen, Springer, Berlin/Heidelberg, 1922, ISBN 9783662344903, pp. 122