Jump to content

Wanamaker, Kempton and Southern Railroad

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Herbie290 (talk | contribs) at 23:48, 8 March 2020 (Not restored or gone). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Wanamaker, Kempton & Southern Railroad
Overview
HeadquartersKempton, Pennsylvania
Reporting markWKS
LocalePennsylvania
Dates of operation1963–present
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge

The Wanamaker, Kempton & Southern, Inc. (WK&S) is a privately owned heritage railroad company in Kempton, Pennsylvania. The company was founded in 1963 and operates over an isolated remnant of a former Reading Company line. Its nickname is the Hawk Mountain Line due to its proximity to the Hawk Mountain range.

Operations

The WK&S operates tourist trains on about three miles (4.8 km) of track between Kempton and Wanamaker regularly on weekends between May and November as well as on special occasions using either diesel or steam engines. Its Kempton station is not the original one, but consists of buildings from the Reading Company that were brought to their current location. The ticket office was the original station at Joanna, Pennsylvania.

The company owns a shop building and an additional 1.5 miles (2.4 km) of track south of Kempton.

History

The origins of the Wanamaker, Kempton & Southern date back to 1870 with the charter of a new railroad, the Berks County Railroad. In a very short time, the new line was bankrupt. It went to the Philadelphia and Reading Railroad as the renamed the Schuylkill and Lehigh line, a small branch line from Reading to Slatedale where the Reading connected with the Lehigh Valley Railroad. With the decline of railroads the Reading Company filed abandonment of the Schuylkill and Lehigh line. In 1963 a group of volunteers founded the Wanamaker, Kempton & Southern Railroad with its main purpose to preserve railroad history. The original plan for the line was to operate 11.5 miles (18.5 km) of track from Kempton to Germansville. However this did not happen because an uncooperative land owner forced the new railroad to stop where the owner's land started, which is why the railroad stops just a north of Wanamaker along Route 143. The new railroad purchased three miles (4.8 km) of track for $65,000. After the rest of the line was abandoned, the tracks south of Kempton were next on the list to be scrapped, but the WK&S had no money to purchase the line. However, the scrapper donated 1.2 miles (1.9 km) of track south of Kempton. The end of the line to the south became North Albany.

Motive power

Steam

  • 0-6-0 H.K. Porter steam engine #65 (1930), being rebuilt to be brought up to FRA code and will return to service within a couple of years.
  • 0-4-0 Porter steam engine #2 (1920) No future plans.

Diesel

  • General Electric diesel-electric engine 44 tonner #7258 (1941)
  • Whitcomb diesel-electric #602 (1944)
  • General Electric diesel-electric #734 (1956) restoration completed in 2010. Received as result of a trade with Railway Restoration Project 113 for Jersey Central business car 98

Not restored or gone

See also

References