Jump to content

Pasir Ris East MRT station

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Davemck (talk | contribs) at 17:37, 23 April 2020 (Clean up duplicate template arguments using findargdups). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

 CR4 
Pasir Ris East
巴西立东
பாசிர் ரிஸ் ஈஸ்ட்
Mass Rapid Transit (MRT) station
General information
Owned byLand Transport Authority
Line(s)
PlatformsIsland
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code CR4 
History
Opening2029; 5 years' time (2029)
Services
Preceding station   Mass Rapid Transit   Following station
Template:SMRT lines

Pasir Ris East MRT station (CR4)[1] is a future underground Mass Rapid Transit station on the Cross Island MRT line located in Pasir Ris, Singapore.[2][3][4] It is to be located between Pasir Ris East Community Club and Loyang Point Centre.[5]

History

On 25 January 2019, LTA announced that Pasir Ris East station would be part of the proposed Cross Island line (CRL). The station will be constructed as part of Phase 1, consisting of 12 stations between Aviation Park and Bright Hill, and is expected to be completed in 2029.[6][7][8]

References

  1. ^ "Land Transport Authority – We Keep Your World Moving". Land Transport Authority. Retrieved January 25, 2019 – via Facebook.
  2. ^ "Joint News Release by the Land Transport Authority (LTA) & SLA - Cross Island Line 1: New Links by 2029". Land Transport Authority. 25 January 2019. Archived from the original on 25 January 2019. Retrieved 25 January 2019.
  3. ^ Tan, Christopher (25 January 2019). "First phase of Cross Island MRT line finalised; will have 12 stations". The Straits Times. Archived from the original on 25 January 2019. Retrieved January 25, 2019.
  4. ^ Yusof, Amir. "First phase of Cross Island Line to open by 2029 with 12 stations". Channel NewsAsia. Archived from the original on January 25, 2019. Retrieved January 25, 2019.
  5. ^ https://landtransportguru.net/pasir-ris-east-station/
  6. ^ "LTA | News Room | News Releases | Joint News Release by the Land Transport Authority (LTA) & SLA - Cross Island Line 1: New Links by 2029". www.lta.gov.sg. 2020-03-05. Archived from the original on 2020-03-05. Retrieved 2020-03-05.
  7. ^ "First phase of Cross Island MRT line finalised; will have 12 stations, Transport News & Top Stories - The Straits Times". The Straits Times. 2020-03-05. Archived from the original on 2019-01-25. Retrieved 2020-03-05.
  8. ^ "First phase of Cross Island Line to open by 2029 with 12 stations - CNA". Channel NewsAsia. 2020-03-05. Archived from the original on 2019-01-25. Retrieved 2020-03-05.