Velodrome LRT station
Appearance
Jakarta LRT station | |||||||||||
![]() A train leaving from Velodrome Station, Photo was taken on 7 September 2018 | |||||||||||
General information | |||||||||||
Location | Jl. Kayu Putih Raya, Rawamangun, Pulo Gadung, East Jakarta Jakarta Indonesia | ||||||||||
Coordinates | 6°11′33″S 106°53′28″E / 6.192581°S 106.89121°E | ||||||||||
Owned by | Regional Government of Special Capital Region of Jakarta | ||||||||||
Operated by | Jakarta Propertindo | ||||||||||
Line(s) | ![]() | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Connections | ![]() | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Parking | Unavailable | ||||||||||
Accessible | Available | ||||||||||
Other information | |||||||||||
Station code | S-06 | ||||||||||
History | |||||||||||
Opened | 11 June 2019trial[1] 1 December 2019 full[2][3] | ||||||||||
Services | |||||||||||
| |||||||||||
|
Velodrome Station is a light rail station of the Jakarta LRT Line A. The station is located at Rawamangun, Pulo Gadung, East Jakarta.
The station is one of the six stations of the first phase of Jakarta LRT Line A which opened on 1 December 2019.[4]
Services
Line-A, destination of Pegangsaan Dua
References
- ^ "Masyarakat Bisa Uji Coba LRT Jakarta Gratis Mulai 11 Juni 2019" (in Indonesian). Retrieved 9 June 2019.
- ^ Ambaranie Nadia Kemala Movanita (ed.). "LRT Jakarta Dikomersilkan 1 Desember, Tarifnya Rp 5.000 Sekali Perjalanan" (in Indonesian). Retrieved 21 November 2019.
- ^ "LRT Jakarta Resmi Berbayar 1 Desember, Tarif Rp5 Ribu Jauh-Dekat" (in Indonesian). Retrieved 1 December 2019.
- ^ "LRT Jakarta Fase Pertama Beroperasi 1 Desember 2019, Pembangunan Fase Kedua Ditargetkan 2022" (in Indonesian). Retrieved 21 November 2019.