Sabroom railway station

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 2409:4066:196:7c03::1cfd:80a1 (talk) at 12:47, 12 June 2020. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Sabroom railway station
Indian Railway Station
General information
LocationNH44, Sabroom, South Tripura district, Tripura
India
Coordinates23°00′51″N 91°41′55″E / 23.014062°N 91.6987492°E / 23.014062; 91.6987492
Elevation33 metres (108 ft)
Owned byIndian Railways
Operated byNortheast Frontier Railway
Line(s)Lumding–Sabroom section
Platforms3
Tracks4
Construction
Structure typeStandard (on ground station)
Platform levelsAt ground
ParkingNo
Bicycle facilitiesNo
Other information
StatusConstruction - New Line
Station codeSBRM
Zone(s) Northeast Frontier Railway
Division(s) Lumding railway division
History
ElectrifiedNo
Services
Preceding station   Indian Railways   Following station
Template:Indian Railways linesTerminus

Sabroom railway station is a railway station in South Tripura district, Tripura, India. Its code is SBRM. It serves Sabroom town[1] and is the last station in Tripura state. It is situated the bank of Feni River near Bangladesh border.

Details

The station lies on the 113 km long 1,676 mm (5 ft 6 in) broad gauge Agartala-Sabroom railway line which comes under the Lumding railway division of the Northeast Frontier Railway zone of Indian Railways. It is a single line without electrification. The 43 km long segment from Agartala to Udaipur near Mata Tripura Sundari temple was completed in 2016 and became operational with two trains running on this segment.[2][3][4][5] The remaining section from Udaipur to Sabroom was completed by 2019 and became operational on 3rd October, 2019.

Construction

The first DEMU serving Agartala - Sabroom performed its inaugural run 3 October 2019. The track may be extended from Sabroom to Chittagong port in Bangladesh as agreed by the prime ministers of the both countries.

Station layout

G Street Level Exit/Entrance & Ticket Counter
P1 FOB, Side platform, No-1 doors will open on the left/right
Track 1
Track 2 toward →
Track 3 toward →
FOB, Island platform, No- 2 doors will open on the left/right
Island platform, No- 3 doors will open on the left/right
Track 4 Under Construction

See also

References

  1. ^ "SABRM/SABROOM". India Rail Info.
  2. ^ First Commercial Broad Guage Freight Train Arrives In Tripura
  3. ^ BG railhead reaches Udaipur amid cheers Archived 2016-03-21 at the Wayback Machine
  4. ^ 'Feni bridge will end Tripura’s isolation'
  5. ^ Tripura’s BG rail progress ‘on right track’

External links