Line 1 (Jinan Metro)
Appearance
Line 1 | |
---|---|
Overview | |
Other name(s) | R1 (construction name) |
Locale | Jinan |
Termini | |
Stations | 11 |
Service | |
Type | Rapid transit |
System | Jinan Metro |
Rolling stock | 4-car Type B |
History | |
Opened | April 1, 2019 |
Technical | |
Line length | 26.27 km |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 100 km/h |
Line 1 of Jinan Metro (Chinese: 济南地铁1号线; pinyin: Jǐnán Dìtiě Yī Hào Xiàn) is a rapid transit line in Jinan. The line use 4-car Type B rolling stock, reserved to be 6-car Type B in future.
The line became operational on April 1, 2019.[1]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Fangte — Gongyanyuan | 1 April 2019 | 26.27 km | 11 | Phase 1 |
Stations
Station Name | Connections | Distance km | |||||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
Template:JinanM stations | 方特 | ||||||
Template:JinanM stations | 济南西站 | JGK 6 (planned) |
|||||
Template:JinanM stations | 大杨 | 4 (planned) | |||||
Template:JinanM stations | 王府庄 | 2 (under construction) | |||||
Template:JinanM stations | 玉符河 | ||||||
Template:JinanM stations | 赵营 | ||||||
Template:JinanM stations | 紫薇路 | ||||||
Template:JinanM stations | 大学城 | ||||||
Template:JinanM stations | 园博园 | ||||||
Template:JinanM stations | 创新谷 | ||||||
Template:JinanM stations | 工研院 | ||||||