Jump to content

Line 2 (Xi'an Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by WOSlinkerBot (talk | contribs) at 21:08, 20 June 2020 (remove un-needed options from tables). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 2
 2 
Beidajie station
Overview
StatusOperational
OwnerXi'an
LocaleXi'an, Shaanxi, China
Termini
Stations21
Service
TypeRapid transit
SystemXi'an Metro
Services1
Operator(s)Xi'an Metro Corporation
Daily ridership1.1755 million (2019 Peak)[1]
History
Opened16 September 2011; 13 years ago (2011-09-16)
Technical
Line length26.715 km (16.600 mi)[2]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Weihe depot
Connection to Line 4
Xi'an Beizhan
 4  14 
Beiyuan
Fengcheng 10 Lu
Connection to Line 4
Xingzhengzhongxin
 4 
Fengcheng 5-lu
Shitushuguan
Daminggongxi
Longshouyuan
Anyuanmen
Connection to Line 1
Beidajie
 1 
Zhonglou
Yongningmen
Nanshaomen
Tiyuchang
Connection to Line 3
Xiaozhai
 3 
Wei 1-jie
Dianshita
Sanyao
Fengqiyuan
Hangtiancheng
Weiqunan
Juehe depot

Line 2 of the Xi'an Metro (Chinese: 西安地铁二号线; pinyin: Xī'ān Dìtiě Èr Hào Xiàn) is a rapid transit line running from north to south Xi'an. It was opened on 16 September 2011. This line is currently 26.715 km (16.600 mi)[2] long with 21 stations.[3] The line is colored red on system maps.

Opening timeline

Segment Commencement Length Station(s) Name
Beikezhan — Huizhan Zhongxin 16 September 2011 20.5 km (12.74 mi) 17 Phase 1 (initial section)
Huizhan Zhongxin — Weiqunan 16 June 2014 6.0 km (3.73 mi) 4 Phase 1 (final section)

Stations (north to south)

Station name Connections Distance
km[4]
Location
English (Pinyin) Chinese
Template:XA stations 草滩北
Template:XA stations 正阳大道
Template:XA stations 北客站 ( 4   Airport  via Template:XA stations.)
Xi'an North railway station EAY
0.000 0.000 Weiyang
Template:XA stations 北苑 1.610 1.610
Template:XA stations 运动公园 1.112 2.722
Template:XA stations 行政中心  4  1.264 3.985
Template:XA stations 凤城五路 1.239 5.224
Template:XA stations 市图书馆  8  (Planned) 1.351 6.574
Template:XA stations 大明宫西 1.397 7.971
Template:XA stations 龙首原 1.460 9.432 Xincheng
Template:XA stations 安远门 1.191 10.623
Template:XA stations 北大街  1  1.256 11.878
Template:XA stations 钟楼  6  (U/C) 0.989 12.868 Beilin
Template:XA stations 永宁门 1.416 14.284
Template:XA stations 南稍门  5  (U/C) 0.907 15.191
Template:XA stations 体育场 0.869 16.060
Template:XA stations 小寨  3  1.062 17.121 Yanta
Template:XA stations 纬一街 1.137 18.258
Template:XA stations 会展中心  8  (Planned) 1.611 19.868
Template:XA stations 三爻 1.714 21.583
Template:XA stations 凤栖原 1.540 23.123 Chang'an
Template:XA stations 航天城  15  (Planned) 1.212 24.334
Template:XA stations 韦曲南 1.798 26.132
Template:XA stations 何家营
Template:XA stations 常宁

Future Development

The northern and southern extensions of the line started construction on October 31, 2019.[5]

References

  1. ^ 王瑜 (2019-03-10). "3月8日西安地铁客流再创历史新高 单日客流首次突破300万大关" (in Chinese). 西部网. Retrieved 2019-03-13.
  2. ^ a b "西安市地铁二号线二期工程(常宁~韦曲南、北客站~草滩北)环境影响报告书(征求意见稿)". 西安地铁官方网站. 2019-10-08. Retrieved 2019-10-08.
  3. ^ "市政府召开西安地铁开通试运营新闻发布会". 2011-09-16. Archived from the original on 2011-11-14. Retrieved 2012-10-03.
  4. ^ "西安地铁一、二、三号线站间距离信息". 2016-11-16. Retrieved 2019-11-06.
  5. ^ "西安地铁2号线二期、8号线今日正式开工". 2019-10-31.