Jump to content

Line 3 (Changsha Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 61.221.66.85 (talk) at 21:37, 15 July 2020. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 3
 3 
Train at Dongtang Station
Overview
StatusOperational
OwnerChangsha Government
LocaleChangsha, Hunan, China
Termini
Stations25
Service
TypeRapid transit
SystemChangsha Metro
Services1
Operator(s)Changsha Metro Corporation
History
Opened28 June 2020[1]
Technical
Line length36.4 km (22.6 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

Line 3 of the Changsha Metro (Chinese: 长沙地铁三号线; pinyin: Chǎngshā Dìtiě Sān Hào Xiàn) is a rapid transit line in Changsha. The first phase opened on 28 June 2020[1] with 25 stations.

Opening timeline

Segment Commencement Length Station(s) Name
Shantang — Guangsheng 28 June 2020[1] 36.4 km (22.62 mi) 25 Phase 1

Stations

Section Station name Connections Distance
km
Location
English Chinese
Phase 1 Template:CSM stations 山塘
Template:CSM stations 洋湖湿地
Template:CSM stations 洋湖新城  9 
Template:CSM stations 阳光
Template:CSM stations 中南大学
Template:CSM stations 阜埠河  4 
Template:CSM stations 灵官渡
Template:CSM stations 侯家塘  1 
Template:CSM stations 东塘  7 
Template:CSM stations 桂花公园
Template:CSM stations 阿弥岭
Template:CSM stations 朝阳村  6 
Template:CSM stations 长沙火车站  2   CZT  Changsha railway station CSQ
Template:CSM stations 烈士公园东  7 
Template:CSM stations 丝茅冲
Template:CSM stations 四方坪
Template:CSM stations 雅雀湖
Template:CSM stations 长沙大学
Template:CSM stations 月湖公园北  5 
Template:CSM stations 湘龙
Template:CSM stations 星沙
Template:CSM stations 松雅湖(南)
Template:CSM stations 星沙文体中心
Template:CSM stations 螺丝塘  CZT 
Template:CSM stations 广生

Future Development

A further southern extension to Xiangtan North railway station in neighbouring Xiangtan City started construction in 2019 with a planned opening in 2023.[2] The extension is 17.29 km long with 8 stations. In the future this extension will be extended northward to Changsha West Railway Station and separated from Line 3 to be operated as its own independent line.[3]

References

  1. ^ a b c "长沙地铁3号线5号线预计6月28日载客初期运营". 2020-06-25.
  2. ^ 湖南日报 (2019-09-26). "最新!长株潭城际轨道交通西环线一期工程开工!都有哪些站点?". k.sina.cn. Retrieved 2020-07-15.
  3. ^ "长株潭城际轨道交通西环线一期工程" (PDF).{{cite web}}: CS1 maint: url-status (link)