Jump to content

Shuangjing station

Coordinates: 39°53′37″N 116°27′38″E / 39.893479°N 116.460627°E / 39.893479; 116.460627
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Renamed user asuefhluakeghluaehgiaeghalkehgklaeshgaehs (talk | contribs) at 21:36, 30 July 2020 (→‎Station Layout: use template:0). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Shuangjing

双井
Beijing Subway
General information
LocationShuangjing Subdistrict, Chaoyang District, Beijing
China
Operated byBeijing Mass Transit Railway Operation Corp., Ltd
Line(s)
History
OpenedJuly 19, 2008 (Line 10)
December 28, 2019[1] (Line 7)
Services
Preceding station   Beijing Subway   Following station
Template:BJS lines
Template:BJS lines
Location
Shuangjing is located in Beijing
Shuangjing
Shuangjing
Location in central Beijing

Shuangjing Station (simplified Chinese: 双井站; traditional Chinese: 雙井站; pinyin: Shuāngjǐng Zhàn) is a subway station on Line 7 and Line 10 of the Beijing Subway, located in Shuangjing Subdistrict, Chaoyang District.

Description

The station is one of Beijing's busiest, having handled a peak entry and exit traffic of 100,000 people on May 5, 2013.[2] The station has full platform doors inside. Exit A leads directly into the basement of the Viva Mall.

History

Shuangjing station was designated to be the interchange between Line 7 and Line 10. However, the Line 10 platforms were not originally designed to handle additional interchange traffic. At around 10 meters wide, the single center platform is one of the narrowest on Line 10. Beijing Subway authorities determined that the narrow platform will not be able to serve the large transfer volumes between Lines 7 and 10. Therefore, on December 28, 2014 when Line 7 opened, trains on Line 7 did not stop at this station even though the station's Line 7 platforms are complete.[3]

Plans were completed for an interchange hall in the northeast corner of Shuangjing Overpass, and an underground transfer corridor on the south side of the Third Ring Road Overpass.[4] Construction started in February 2019.[5] The station for Line 7 was opened on December 28, 2019.[1]

Station Layout

G Entrances and Exits Exits A-G
B1 Line 10 Concourse Faregates, Station Agent
B2 Line 7 Concourse Faregates, Station Agent
Counterclockwise      Line 10 to Guomao
Island platform, doors open on the left
Clockwise      Line 10 to Jinsong
B3 Westbound      Line 7 towards Beijing West railway station (Guangqumenwai)
Island platform, doors open on the left
Eastbound      Line 7 towards Hua Zhuang (Jiulongshan)

Exits

rowspan=6 style="background:#Template:BJS color"|   rowspan=6 style="background:#Template:BJS color"|   Exit Destination Image
3rd Ring Rd.
Guangqu Rd.
3rd Ring Rd.
Guangqu Rd.
3rd Ring Rd.

Gallery

References

  1. ^ a b "北京地铁7号线双井站开通 可换乘10号线". 2019-12-28.
  2. ^ 北京地铁10号线"O"了 客流破170万. Soho. Retrieved 2013-05-09.
  3. ^ 北京地铁7号线双井站为何迟迟不开通--房产--人民网. house.people.com.cn. Retrieved 2016-06-26.
  4. ^ "终于要来了,7号线双井站换乘通道年底打通!". 2019-11-20.
  5. ^ "周六起双井站A口封闭 为配合换乘通道改造工程". 2019-02-20.

39°53′37″N 116°27′38″E / 39.893479°N 116.460627°E / 39.893479; 116.460627