Cushman Dam No. 1

Coordinates: 47°25′23″N 123°13′21″W / 47.423063°N 123.222377°W / 47.423063; -123.222377
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Bumm13 (talk | contribs) at 04:40, 3 August 2020 (changed "Washington (U.S. state)" (Washington) wikilink to "Washington (state)"). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Cushman No. 1 Hydroelectric Power Plant
Cushman Dam No. 1 is located in Washington (state)
Cushman Dam No. 1
LocationMason County, Washington, USA
Nearest cityHoodsport, Washington
Coordinates47°25′23″N 123°13′21″W / 47.423063°N 123.222377°W / 47.423063; -123.222377
Area28 acres (11 ha)[2]
Built1924
ArchitectTacoma Light Dept.
MPSHydroelectric Power Plants in Washington State, 1890--1938 MPS
NRHP reference No.88002759[1]
Added to NRHPDecember 15, 1988

Cushman Dam No. 1 is a hydroelectric dam on the North Fork of the Skokomish River in Mason County, Washington, which impounded and enlarged the formerly natural Lake Cushman. It was built by Tacoma City Light (now Tacoma Power) in 1924–1926. Tacoma's demand for electricity grew rapidly after World War I. Tacoma City Light's Nisqually River Hydroelectric Project, built in 1912, could not meet the demand and the utility decided to build a new hydroelectric project on the North Fork Skokomish River. The dam and powerhouse first began to deliver electricity on February 12, 1926.[3]

It has a concrete arch design and includes 90,000 cubic yards (69,000 m³) of concrete, covering a whole 6,244 feet (1903 m) of water. Two 21,600 kilowatt generators provide 127 million kilowatt-hours annually to the Tacoma Power system.

Construction began on July 7, 1924, under the commissioner Ira S. Davidsson (1918–1940). It has a top width of eight feet (2.4 m) and a base width of 50 feet (15 m), at 275 feet (84 m) high and 1,111 feet (339 m) long. The transmission of electricity to Tacoma, over lines crossing Tacoma Narrows, was activated, or "formally energized", on March 23, 1926, with the push of a button by President Calvin Coolidge in a ceremony at the White House.[4]

A second, smaller dam, Cushman Dam No. 2, 3.2 kilometers (2 miles) downstream of Dam No. 1, was completed by December 1930.

See also

References

  1. ^ "National Register Information System". National Register of Historic Places. National Park Service. April 15, 2008.
  2. ^ Soderberg, Lisa (October 23, 1986), National Register of Historic Places Registration Form: Cushman No. 1 Hydroelectric Power Plant (PDF), retrieved February 19, 2015.
  3. ^ "Tacoma City Light's Cushman Dam No. 1 on the Skokomish River delivers electricity on March 23, 1926". HistoryLink.org. Retrieved 2009-07-14.
  4. ^ "Cushman Hydroelectric Project Timeline" (PDF). Tacoma Power. Archived from the original (PDF) on 2009-05-08. Retrieved 2009-07-14.