Gek Poh MRT station

Coordinates: 1°20′54″N 103°41′53″E / 1.348382°N 103.697963°E / 1.348382; 103.697963
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Epicgenius (talk | contribs) at 23:30, 2 November 2020 (remove definite article before proper noun "Contract"). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

 JW1 
Gek Poh
玉宝
Mass Rapid Transit (MRT) station
General information
Coordinates1°20′54″N 103°41′53″E / 1.348382°N 103.697963°E / 1.348382; 103.697963
Owned byLand Transport Authority
Line(s)
PlatformsSide
Tracks2
Construction
Structure typeElevated
Platform levels1
ParkingYes
Bicycle facilitiesYes
AccessibleYes
History
Opening2026; 2 years' time (2026)
ElectrifiedYes
Services
Preceding station   Mass Rapid Transit   Following station
One-way operation
Template:SMRT lines
S1 West aft Bahar
Future Service
One-way operation
Template:SMRT lines
S1 North bef Bahar
Future Service
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Gek Poh
Gek Poh station in Singapore

Gek Poh MRT station is a proposed Mass Rapid Transit (MRT) station along the Jurong Region Line in Jurong West, Singapore.[1][2][3]

History

On 9 May 2018, LTA announced that Gek Poh station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 1, JRL (West), consisting of 10 stations between Choa Chu Kang, Boon Lay and Tawas, and is expected to be completed in 2026.[4]

Contract J107 for the design and construction of Gek Poh Station and associated viaducts was awarded to Sembcorp Design and Construction Pte Ltd at a sum of S$226.6 million. Construction will start in 2020, with completion in 2026.[5] Contract J107 also includes the design and construction of Tawas, and associated viaducts.[6]

Location

The station complex will be straddled over the existing Jurong West Street 75, between the junction with Jurong West Street 74, and the junction with Jurong West Avenue 5 and Jurong West Street 82. It is located within the Jurong West planning area in the Yunan Subzone,[7] nested by multiple housing estates, with Gek Poh Shopping Centre and Gek Poh Ville Community Club to the north.

Access to the station will be via 3 exits on each side of Jurong West Street 75.[8]

References

  1. ^ "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  2. ^ "Residents and students welcome Jurong Region Line but find it confusing". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  3. ^ "Jurong Region Line". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  4. ^ "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  5. ^ "LTA | News Room | news-releases | LTA Awards Three Civil Contracts to Construct Four Stations for the Jurong Region Line". 2020-02-13. Archived from the original on 2020-02-13. Retrieved 2020-02-13.
  6. ^ "3 civil contracts worth $596m awarded to design, construct future Jurong Region Line stations, Transport News & Top Stories - The Straits Times". 2020-02-13. Archived from the original on 2020-02-13. Retrieved 2020-02-13.
  7. ^ "Singapore's Jurong West Planning Area". Key Location. Retrieved 2019-09-21.
  8. ^ "Jurong Region Line". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.